2018 IMC PDF Download – International
Mechanical Code & Redlin
Three - Answer--The mechanical provisions of the international residential code are
applicable to one and two family dwellings and townhouses a maximum
of________________stories above grade plane in height.
Specifically adopted - Answer--Provisions of an appendix do not apply
unless_______________.
Specific - Answer--Where there is a conflict between a general code requirement and a
specific requirement, the_______________requirement shall govern.
Owner or owners agent - Answer--The_________________shall be responsible for the
maintenance of the mechanical system.
The code official - Answer--When requirements necessary for proper operation of a
proposed mechanical system are not specifically covered by the code, such
requirements shall be determined by____________________.
State the reason for disapproval in writing to the applicant - Answer--Where the code
official finds that a proposed alternative material does not comply with the intent of the
code provisions, the code official shall _________________.
Interpret - Answer--The code official has the authority to______________the provisions
of the code.
, For individual cases where the strict letter of the code is impractical - Answer--The code
official has the authority to grant modifications to the code________________.
Economics - Answer--In order for an alternative material, design or method of
construction to be considered acceptable, it must be equivalent to the code based on all
but which of the following criteria?
An approved agency - Answer--Tests performed by_________________may be
required by the code official where there is insufficient evidence of code compliance.
Elements have been reconditioned, placed in proper working order and approved -
Answer--Used materials, equipment and appliances may be utilized under which of the
following conditions?
Required by state law - Answer--The code official shall require construction documents
and specifications to be prepared by a registered design professional
when____________.
An annual permit may be issued - Answer--In the case of an approved existing
mechanical system in a factory with qualified personnel,_______________for periodic
alterations to the system.
One year - Answer--Once a permit has expired because the authorized work was not
commenced or was suspended\abandoned, a new permit may be issued at one-half the
amount required for a new permit, provided the work has not been abandoned for more
than________________.
Approved - Answer--When the building permit is issued, the construction documents
shall be stamped________________.
At the job site - Answer--One set of construction documents shall be
kept_______________until completion of the project.
Is unexpired - Answer--A person holding a permit has the right to apply for an extension,
provided the permit________________.
Holder of the permit - Answer--The______________shall be responsible for the
scheduling of inspections.
Mechanical Code & Redlin
Three - Answer--The mechanical provisions of the international residential code are
applicable to one and two family dwellings and townhouses a maximum
of________________stories above grade plane in height.
Specifically adopted - Answer--Provisions of an appendix do not apply
unless_______________.
Specific - Answer--Where there is a conflict between a general code requirement and a
specific requirement, the_______________requirement shall govern.
Owner or owners agent - Answer--The_________________shall be responsible for the
maintenance of the mechanical system.
The code official - Answer--When requirements necessary for proper operation of a
proposed mechanical system are not specifically covered by the code, such
requirements shall be determined by____________________.
State the reason for disapproval in writing to the applicant - Answer--Where the code
official finds that a proposed alternative material does not comply with the intent of the
code provisions, the code official shall _________________.
Interpret - Answer--The code official has the authority to______________the provisions
of the code.
, For individual cases where the strict letter of the code is impractical - Answer--The code
official has the authority to grant modifications to the code________________.
Economics - Answer--In order for an alternative material, design or method of
construction to be considered acceptable, it must be equivalent to the code based on all
but which of the following criteria?
An approved agency - Answer--Tests performed by_________________may be
required by the code official where there is insufficient evidence of code compliance.
Elements have been reconditioned, placed in proper working order and approved -
Answer--Used materials, equipment and appliances may be utilized under which of the
following conditions?
Required by state law - Answer--The code official shall require construction documents
and specifications to be prepared by a registered design professional
when____________.
An annual permit may be issued - Answer--In the case of an approved existing
mechanical system in a factory with qualified personnel,_______________for periodic
alterations to the system.
One year - Answer--Once a permit has expired because the authorized work was not
commenced or was suspended\abandoned, a new permit may be issued at one-half the
amount required for a new permit, provided the work has not been abandoned for more
than________________.
Approved - Answer--When the building permit is issued, the construction documents
shall be stamped________________.
At the job site - Answer--One set of construction documents shall be
kept_______________until completion of the project.
Is unexpired - Answer--A person holding a permit has the right to apply for an extension,
provided the permit________________.
Holder of the permit - Answer--The______________shall be responsible for the
scheduling of inspections.