SSGI SCRUM MASTER FINAL ASSESSMENT
2026 COMPLETE QUESTIONS AND
CORRECT ANSWERS GRADED A+
●● Which statement is true about scrum?
a. It is a team-based framework
b. It is a set of technical software practices
c. It is a Lean System Engineering technique
d. It is ideal method for static design requirements.
Answer: A
●● When does the Plan-do-CA cycle occur in Scrum?
a. Across all scrum events
b. In the daily stand-up
c. As part of the Iteration Retrospective
d. At the Iteration Review.
Answer: A
●● What is the purpose of the Plan-Do-Check-Adjust cycle as applied to
iterations?
a. To create a continuous flow or work to support the delivery pipeline
, b. To allow the team to perform some final backlog refinement for
upcoming Iteration planning
c. To provide a regular predictable developement cadence to produce an
increment of value
d. to give the agile release train team members a process tool to kep the
train on the tracks.
Answer: D
●● What is the recommended duration of a SAFe iteration?
a. 5 weeks
b. 2 weeks
c. 3 weeks
d. 4 weeks.
Answer: B
●● Which statement is true about teams?
a. Agile Teams can manage daily interruptions
b. Products are more robust when individuals on teams have specific
skill sets
c. Changes in team composition do not impact productivity
d. Teams are more productive than the same number of individuals.
Answer: D
2026 COMPLETE QUESTIONS AND
CORRECT ANSWERS GRADED A+
●● Which statement is true about scrum?
a. It is a team-based framework
b. It is a set of technical software practices
c. It is a Lean System Engineering technique
d. It is ideal method for static design requirements.
Answer: A
●● When does the Plan-do-CA cycle occur in Scrum?
a. Across all scrum events
b. In the daily stand-up
c. As part of the Iteration Retrospective
d. At the Iteration Review.
Answer: A
●● What is the purpose of the Plan-Do-Check-Adjust cycle as applied to
iterations?
a. To create a continuous flow or work to support the delivery pipeline
, b. To allow the team to perform some final backlog refinement for
upcoming Iteration planning
c. To provide a regular predictable developement cadence to produce an
increment of value
d. to give the agile release train team members a process tool to kep the
train on the tracks.
Answer: D
●● What is the recommended duration of a SAFe iteration?
a. 5 weeks
b. 2 weeks
c. 3 weeks
d. 4 weeks.
Answer: B
●● Which statement is true about teams?
a. Agile Teams can manage daily interruptions
b. Products are more robust when individuals on teams have specific
skill sets
c. Changes in team composition do not impact productivity
d. Teams are more productive than the same number of individuals.
Answer: D