CCHT ACTUAL EXAMS COMPILATION
SCRIPT COMPREHENSIVE SOLUTIONS 2026
GRADED A+
⩥ 100 ML. Answer: THE CORRECT AMOUNT OF WATER TO
COLLECT FOR TOTAL CHLORINE TESTING
⩥ RPC ultra low total chlorine strips. Answer: STRIPS USED FOR
CHLORINE TESTING
⩥ HOW LONG ARE RPC STRIPS. Answer: IMMERSED IN SAMPLE
WATER FOR 60 SECONDS
⩥ WHEN SHOULD CHLORINE BE TESTED. Answer: PRIOR TO
TREATMENTS IN THE MORNING AND EVERY 3-4 HOURS
WHILE PATIENTS ARE DIALYZING
⩥ RPC ULTRA -LOW TOTAL CHLORINE STRIPS TEST. Answer:
CHLORINE IN THE WATER AFTER CARBON TANK AND POST
RO
⩥ 0.00 to 0.09 ppm. Answer: total chlorine levels that are patient safe
AND DOCUMENT IN "TMS" OR PAPER LOG
, ⩥ FIRST SAMPLE. Answer: SHOULD BE TAKEN FROM POST
CARBON TANK 1 (WORKER )
⩥ SECOND SAMPLE. Answer: POST RO
⩥ IF CHLORINE IS NOTED POST RO. Answer: DO NOT INITIATE
ANY PATIENT TREATMENT, AND DOCUMENT PER FACILITY
POLICY AND PROCEDURE
⩥ CHLORINE BREAKTHROUGH. Answer: OCCURS POST
CARBON TANK 1 (WORKER), IMMEDIATE ADDITIONAL
TESTING SHOULD TAKE PLACE AFTER CARBON TANK 2
(POLISHER)
⩥ CARBON TANK 2 (POLISHER). Answer: IF TANK SHOWS
RESULTS ABOVE THE ACTION LEVEL IMMEDIATELY STOP
TREATMENTS
⩥ BYPASS. Answer: YOU WILL PUT PATIENTS IN THIS IF
CARBON TANK 2 (POLISHER) TEST POSTIVE FOR CHLORINE ,
DOCUMENT TMS OR TCL- 2 LOG EVERY 2 HOURS
⩥ MEDICAL DIRECTOR. Answer: AFTER CHLORINE
BREAKTHROUGH , WHO MUST APPROVE TO RESUME
NORMAL OPERATION AND SIGN INTO TMS OR TCL -2 LOG
SCRIPT COMPREHENSIVE SOLUTIONS 2026
GRADED A+
⩥ 100 ML. Answer: THE CORRECT AMOUNT OF WATER TO
COLLECT FOR TOTAL CHLORINE TESTING
⩥ RPC ultra low total chlorine strips. Answer: STRIPS USED FOR
CHLORINE TESTING
⩥ HOW LONG ARE RPC STRIPS. Answer: IMMERSED IN SAMPLE
WATER FOR 60 SECONDS
⩥ WHEN SHOULD CHLORINE BE TESTED. Answer: PRIOR TO
TREATMENTS IN THE MORNING AND EVERY 3-4 HOURS
WHILE PATIENTS ARE DIALYZING
⩥ RPC ULTRA -LOW TOTAL CHLORINE STRIPS TEST. Answer:
CHLORINE IN THE WATER AFTER CARBON TANK AND POST
RO
⩥ 0.00 to 0.09 ppm. Answer: total chlorine levels that are patient safe
AND DOCUMENT IN "TMS" OR PAPER LOG
, ⩥ FIRST SAMPLE. Answer: SHOULD BE TAKEN FROM POST
CARBON TANK 1 (WORKER )
⩥ SECOND SAMPLE. Answer: POST RO
⩥ IF CHLORINE IS NOTED POST RO. Answer: DO NOT INITIATE
ANY PATIENT TREATMENT, AND DOCUMENT PER FACILITY
POLICY AND PROCEDURE
⩥ CHLORINE BREAKTHROUGH. Answer: OCCURS POST
CARBON TANK 1 (WORKER), IMMEDIATE ADDITIONAL
TESTING SHOULD TAKE PLACE AFTER CARBON TANK 2
(POLISHER)
⩥ CARBON TANK 2 (POLISHER). Answer: IF TANK SHOWS
RESULTS ABOVE THE ACTION LEVEL IMMEDIATELY STOP
TREATMENTS
⩥ BYPASS. Answer: YOU WILL PUT PATIENTS IN THIS IF
CARBON TANK 2 (POLISHER) TEST POSTIVE FOR CHLORINE ,
DOCUMENT TMS OR TCL- 2 LOG EVERY 2 HOURS
⩥ MEDICAL DIRECTOR. Answer: AFTER CHLORINE
BREAKTHROUGH , WHO MUST APPROVE TO RESUME
NORMAL OPERATION AND SIGN INTO TMS OR TCL -2 LOG