Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 108 pages
Exam (elaborations)

NERC CERTIFICATION EXAM TEST BANK | CONTAINS 4 DIFFERENT ALREADY TESTED VERSIONS WITH EXPERT VERIFIED QUESTIONS AND ANSWERS | GUARANTEED PASS| ALREADY GRADED A | LATEST UPDATE

Document preview thumbnail
Preview 4 out of 108 pages

NERC CERTIFICATION EXAM TEST BANK | CONTAINS 4 DIFFERENT ALREADY TESTED VERSIONS WITH EXPERT VERIFIED QUESTIONS AND ANSWERS | GUARANTEED PASS| ALREADY GRADED A | LATEST UPDATE

Content preview

1|Page




NERC CERTIFICATION EXAM TEST BANK | CONTAINS 4
DIFFERENT ALREADY TESTED VERSIONS WITH EXPERT
VERIFIED QUESTIONS AND ANSWERS | GUARANTEED
PASS| ALREADY GRADED A | LATEST UPDATE

A Balancing Authority Area has two 800 MW generators , three 400 MW
generators , and many generators less than 200 MW . What is the MSSC
for this Balancing Area ??


a. 1600 MW
b. 800 MW
c. 640 MW
d. 1200 MW ......ANSWER......b. 800 MW


But 640MW is the reportable event threahold


Line A has an SOL of 250 MVA and is currently loaded at 200 MVA . Line
B is and has an LODF of 0.2 to Line A. If Line B relays out what will be
the new power flow on Line A ? loaded at 500 MVA


a. 300 MVA
b. 325 MVA


pg. 1

,2|Page


c. 290 MVA
d. 245 MVA ......ANSWER......a. 300 MVA


A Balancing Authority is in an EEA 1 , what must the Balancing Authority
do prior to moving to the next EEA Level ?


a. Inform the Transmission Operator and Reliability Coordinator
b. Ensure operating reserve in place , additional transaction purchases
are scheduled , and all available generation online
c. Shed all non - firm load
d. Ensure operating reserve in place , all purchases scheduled , and all
non - firm load has been shed ......ANSWER......d. Ensure operating
reserve in place , all purchases scheduled , and all non - firm load has
been shed


Line 1 SOL is 250 MVA , Line 3 has an OTDF of 0.25 to line 1. If line 3
relays out what will be the SOMVAR Line 1 loading on Line 1 and will it
be within its SOL limit ?
Line 1 - 200MVA, 50MVAR
Line 2 - 150MVA, 30MVAR
Line 3 - 300MVA, 0.25 OTDF


a . 220 / No
b . 250 / Yes


pg. 2

,3|Page


C. 275 / No
d . 275 / Yes ......ANSWER......C. 275 / No


Which curve best represents the Ferranti effect ?


a. 1
b. 2
c. 3
d. 4 ......ANSWER......b. 2


Line gently goes up as Voltage get higher abd lines gets longer


A system operator is trying to synchronize lines A and B. Voltage at A is
125 kV and Voltage at B is 115 kV . Reactive reserves are at their
maximum output . What action should the system operator take first ?


a. Increase Generation at B
b. Decrease Generation at A
c. Shed Load electrical close to Station B
d. Increase Load at Station A ......ANSWER......d. Increase Load at
Station A




pg. 3

, 4|Page


In ordered to be considered controllable load for contingency reserves
the load must be ... ?


a . Non - Critical
b. SCADA Controlled
c. Able to reduce within a specific time period
d . Non - Firm Load ......ANSWER......c. Able to reduce within a specific
time period


On a transmission line that flows Station A to Station B. Station B is
open and unable to close due to excessively high voltage at Station B.
What device can the system operator use at Station A to mitigate this
system problem ?


a. Insert a Shunt Capacitor
b. Insert a Series Capacitor
c. Insert Shunt Reactor
d. Bypass a Series Capacitor ......ANSWER......c. Insert Shunt Reactor


Geomagnetic Disturbances effect the ability to control :


a. AGC
b. Frequency



pg. 4

Document information

Uploaded on
April 16, 2026
Number of pages
108
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$20.09

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
AceExam1
3.5
(11)
Sold
37
Followers
1
Items
2596
Last sold
6 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions