INSECTICIDAL FOGGING EXAM
PRACTICE TEST QUESTIONS ANDCORRECT ANSWERS
(VERIFIED ANSWERS) PLUS RATIONALES Q&A | INSTANT
DOWNLOAD PDF
,1 FDNY W97 FUMIGATION AND INSECTICIDAL FOGGING EXAM
FDNY W97 Fumigation And Insecticidal
Fogging Exam Practice Test Questions And
Correct Answers (Verified Answers) Plus
Rationales Q&A | Instant Download
(Covers FDNY Fire Code, fire safety procedures, fumigation operations, permits,
PPE, and emergency response.)
1. What is the main purpose of the FDNY W-97 Certificate of Fitness?
A. To allow handling of pesticides only
B. To supervise and ensure safety during fumigation and insecticidal
fogging operations
C. To sell fumigation products
D. To perform building inspections
Rationale: The W-97 certificate ensures that an individual is trained and
authorized to safely supervise fumigation and insecticidal fogging
operations per FDNY regulations.
2. Which FDNY code governs fumigation and insecticidal fogging activities?
A. FC 401
,2 FDNY W97 FUMIGATION AND INSECTICIDAL FOGGING EXAM
B. FC 105 and FC 1507
C. FC 107
D. FC 503
Rationale: FDNY Fire Code Sections 105 and 1507 cover permit
requirements and safety rules for fumigation and insecticidal fogging.
3. A permit from FDNY is required when fumigation is performed with
which of the following? A. Soap and water
B. Vinegar solution
C. Any toxic or flammable fumigant
D. Compressed air only
Rationale: FDNY requires permits for fumigation involving any hazardous
or flammable materials to prevent fire and health hazards.
4. Before a fumigation operation, what must be posted at all entrances?
A. Cleaning schedule
B. Company license
C. Warning signs indicating fumigation in progress
D. Employee ID list
Rationale: Warning signs alert personnel and the public of toxic
conditions and restricted access during fumigation.
5. How long must warning signs remain posted after fumigation?
, 3 FDNY W97 FUMIGATION AND INSECTICIDAL FOGGING EXAM
A. Until the area looks safe
B. For 1 hour after completion
C. Until the space has been tested and declared safe for re-entry D. Only
during gas release
Rationale: Signs must remain until testing confirms no hazardous
concentration remains in the air.
6. What must be done to HVAC systems before fumigation begins?
A. Increase airflow
B. Shut down and seal all air handling systems
C. Replace filters
D. Run ventilation fans
Rationale: HVAC systems must be shut down and sealed to prevent
fumigants from spreading to other areas.
7. What is the first step before starting any fumigation?
A. Spray insecticide
B. Open all vents
C. Evacuate all occupants and animals
D. Check humidity
Rationale: The area must be cleared of people and animals to prevent
exposure to toxic gases.