• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 13 pages
Exam (elaborations)

Nettcp Concrete Inspector Questions With Verified Accurate Answers

Document preview thumbnail
Preview 2 out of 13 pages

NETTCP CONCRETE INSPECTOR QUESTIONS WITH VERIFIED ACCURATE ANSWERS

Content preview

NETTCP CONCRETE INSPECTOR QUESTIONS WITH
VERIFIED ACCURATE ANSWERS

False - Answers - Quality assurance is defined as only those planned and systematic
actions taken by the agency to provide confidence that a product or facility will perform
satisfactorily in service. (1-1)

True - Answers - A quality assurance program serves as a skeleton or overall
framework necessary for construction quality assurance implementation. (1-4)

True - Answers - Joint development and review of quality assurance specifications
should include agency and industry personnel (engineers, inspectors, technicians) who
are directly responsible for construction. (1-5)

True - Answers - The same six core elements required for design-bid-build construction
QA programs are also required for design-build construction QA programs. (1-8)

False - Answers - Quality control activities include only sampling and testing. Visual
inspection is relegated to the acceptance inspector. (1-10)

True - Answers - Quality control plans are project specific documents whose function is
to address specific production facility and field placement processes for individual
categories of work on a construction project. (1-11)

True - Answers - Acceptance is the responsibility of the transportation agency. (1-12)

True - Answers - The engineering limits are the absolute threshold values for individual
test results (1-15)

True - Answers - Quality assurance specifications typically use quality measures. (1-14)

True - Answers - Since the objective of the IA comparison is to identify discrepancies or
variability in testing procedures or equipment, IA testing is performed on split samples.
(1-20)

True - Answers - If Contractor QC test results are not utilized in the acceptance
decision, a dispute resolution system is not required. (1-21)

True - Answers - All Agency Central Laboratories are required under federal regulations
to be accredited through AASHTO Accreditation Program (AAP). (1-23)

True - Answers - Personal Qualification/Certification programs should include
requirements for re-certification at 2 to 5 year intervals. (1-26)

, True - Answers - Each Agency Construction QA Program must meet the requirements
of 23 CFR 637B and is required to be approved by FHWA. (1-27)

True - Answers - The process of hydration begins immediately when the cement comes
in contact with water. (2-1)

True - Answers - The cement paste density and strength are related. (2-1)

True - Answers - AASHTO M 85 (ASTM C 150) stipulate cement types based on
chemical composition. (2-3)

False - Answers - Type III cement is known as a low heat of hydration cement. (2-3)

True - Answers - According to ACI 318, mixtures using Type I cement should be cured
for 7 days. (2-4)

True - Answers - Lowering the heat of hydration in massive concrete structures is
important to prevent thermal cracking. (2-4)

True - Answers - A type IP(10) is used to indicate a Portland-pozzolan blended product,
with 10% pozzolan. (2-5)

True - Answers - Expansive cement is a special product designed to offset stresses in
concrete caused by drying shrinkage, which when excessive can lead to cracking. (2-6)

True - Answers - The time of set for cement paste is determined via a needle
penetration method. (2-7)

False - Answers - Cement should be stored in humid or moist environments to ensure
hydration has started prior to being introduced into the concrete mixer. (2-8)

True - Answers - A pozzolan is a material which in itself possesses little or no
cementitious activity, but when combined with hydraulic cement, will behave in a
cementitious manner. (3-1)

True - Answers - Fly ash tends to increase the consistency of concrete when compared
to mixtures with just Portland Cement. (3-3)

False - Answers - Dosages of air entrainment generally need to be lowered when fly
ash is used. (3-3)

True - Answers - When compared to mixtures using just Portland cement, mixtures
supplemented with Grade 120 slag cement have greater 28 day strength. (3-5)

True - Answers - Fly ash and slag retard the set time of concrete. (3-8)

Document information

Uploaded on
April 14, 2026
Number of pages
13
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$14.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA
3.8
(367)
Sold
2181
Followers
1449
Items
61291
Last sold
16 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions