What is the primary instruction for hazmat disposal onboard CVN-69.
A. OPNAVINST 5100.19 Series
B. OPNAVINST 5100.10 Series (HMUG)
C. IKEINST 5100.10 Series
D. IKEINST 4790.1 Series
Give this one a try later!
C. IKEINST 5100.10 Series
Who approves the Cycle Schedules?
A. Division Officer
B. Department Head
,C. Executive Officer
D. 3M Coordinator
Give this one a try later!
B. Department Head
47. What are the duties of maintenance personnel in the 3M system?
A. Inform the work center supervisor when maintenance requirements are completed
and Sign the accountability log
B. A, C, and D
C. Report any deficiencies found during conduct of maintenance check
D. Perform assigned scheduled maintenance requirements using MRC's, EGL's,
Give this one a try later!
B. A, C, and D
What is the purpose of the equipment tag-out procedure?
A. Provides instructions for the proper securing of equipment.
B. Provides a list of all personnel who are authorized to secure equipment or systems.
C. Provides safety measures for equipment and personnel for the prevention of
improper operation when a component , equipment , system or portion of a system is
isolated or in an abnormal condition.
D. All of the above.
Give this one a try later!
, C. Provides safety measures for equipment and personnel for the
prevention of improper operation when a component , equipment , system
or portion of a system is isolated or in an abnormal condition.
The word "CAUTION" on the MRC signifies that operating procedures,practices,etc.,if
not correctly followed may lead to ___________.
A. Personnel injury or death
B. Damage to equipment
C. Both A and B
D. Non-judicial punishment
Give this one a try later!
B. Damage to equipment
A maintenance person was using an approved DANGER TAG to isolate a piece of
equipment. The second person checking the tags noticed the TAG has been altered,
what action is correct?
A. Continue because corrections was based on the correct diagram
B. Discontinue, discard tag and use equipment tag-out bill(hard tags or Dept Tags)
C. Continue because tag-out is almost done
D. Discontinue and notify Authorizing Officer immediately
Give this one a try later!
Discontinue and notify Authorizing Officer immediately
A. OPNAVINST 5100.19 Series
B. OPNAVINST 5100.10 Series (HMUG)
C. IKEINST 5100.10 Series
D. IKEINST 4790.1 Series
Give this one a try later!
C. IKEINST 5100.10 Series
Who approves the Cycle Schedules?
A. Division Officer
B. Department Head
,C. Executive Officer
D. 3M Coordinator
Give this one a try later!
B. Department Head
47. What are the duties of maintenance personnel in the 3M system?
A. Inform the work center supervisor when maintenance requirements are completed
and Sign the accountability log
B. A, C, and D
C. Report any deficiencies found during conduct of maintenance check
D. Perform assigned scheduled maintenance requirements using MRC's, EGL's,
Give this one a try later!
B. A, C, and D
What is the purpose of the equipment tag-out procedure?
A. Provides instructions for the proper securing of equipment.
B. Provides a list of all personnel who are authorized to secure equipment or systems.
C. Provides safety measures for equipment and personnel for the prevention of
improper operation when a component , equipment , system or portion of a system is
isolated or in an abnormal condition.
D. All of the above.
Give this one a try later!
, C. Provides safety measures for equipment and personnel for the
prevention of improper operation when a component , equipment , system
or portion of a system is isolated or in an abnormal condition.
The word "CAUTION" on the MRC signifies that operating procedures,practices,etc.,if
not correctly followed may lead to ___________.
A. Personnel injury or death
B. Damage to equipment
C. Both A and B
D. Non-judicial punishment
Give this one a try later!
B. Damage to equipment
A maintenance person was using an approved DANGER TAG to isolate a piece of
equipment. The second person checking the tags noticed the TAG has been altered,
what action is correct?
A. Continue because corrections was based on the correct diagram
B. Discontinue, discard tag and use equipment tag-out bill(hard tags or Dept Tags)
C. Continue because tag-out is almost done
D. Discontinue and notify Authorizing Officer immediately
Give this one a try later!
Discontinue and notify Authorizing Officer immediately