• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 54 pages
Exam (elaborations)

Traffic Supervisor Exam With Correct Actual Questions And Correctly Well Defined Answers Latest Already Graded A+

Document preview thumbnail
Preview 4 out of 54 pages

TRAFFIC SUPERVISOR EXAM WITH CORRECT ACTUAL QUESTIONS AND CORRECTLY WELL DEFINED ANSWERS LATEST ALREADY GRADED A+

Content preview

TRAFFIC SUPERVISOR EXAM WITH CORRECT ACTUAL
QUESTIONS AND CORRECTLY WELL DEFINED ANSWERS LATEST
ALREADY GRADED A+




What class one light is the shadow vehicle equipped with?

A. Flashing Yellow Light

B. Oscillating Yellow Light

C. Yellow Strobe Light

D. All of the above - ANSWER-All of the above



When may cones be substituted for drums?

A. Daytime traffic control minimum height 18"

B. Daytime traffic control minimum height 28"

C. Daytime traffic control minimum height 36"

D. Daytime traffic control minimum height 42" - ANSWER-Daytime traffic control minimum height 28"



When may cones be substituted for drums?

A. Daytime traffic control minimum height 18"

B. Daytime traffic control minimum height 28"

C. Daytime traffic control minimum height 36"

D. Daytime traffic control minimum height 42" - ANSWER-Daytime traffic control minimum height 28"



When cones are substituted for drums for nighttime closers, what is the minimum cone height requirement?

A. 18"

B. 28"

C. 36"

D. 42" - ANSWER-42"

,When cones are substituted for drums at nighttime closer, what is the maximum cone spacing?

A. 20'

B. 30'

C. 40'

D. 50' - ANSWER-40'



What type of flashing warning lights are required when there is a nighttime lane closer?

A. ROAD WORK AHEAD

B. LANE CLOSED AHEAD

C. A & B

D. NONE OF THE ABOVE - ANSWER-ROAD WORK AHEAD

&

LANE CLOSED AHEAD



If there is a lane closure of greater than three days, what is required?

A. Work zone dotted lines, 4' in length separated by 10' gaps, shall be provided to identify the merge.

B. The appropriate color work zone edge lines shall be applied along the taper and tangent sections.

C. All the above

D. None of the above - ANSWER-The appropriate color work zone edge lines shall be applied along the taper
and tangent sections.



Is a shadow vehicle used in all traffic zones?

A. True

B. False - ANSWER-False



The shadow vehicle is occupied whenever workers are in the work area.

A. True

B. False - ANSWER-False



Work zone pavement marking that conflict with final traffic lanes shall be temporary paint.

A. True

B. False - ANSWER-False

,What are the extra advance warning signs?

A. Lane Close Ahead

B. Watch for Stopped Traffic

C. Road Work Ahead

D. All the above - ANSWER-Lane Change Ahead

&

Watch for Stopped Traffic

&

Road Work Ahead



Is the advisory speed plaque used in all traffic zones?

A. True

B. False - ANSWER-False



When the approach speed limit is 40 mph or less, 36" warning signs may be used.

A. True

B. False - ANSWER-True



Road Work Ahead signs shall be provided on entrance ramps or roadways entering the work limits.

A. True

B. False - ANSWER-True



End Road Work signs are only required for lane closures of more than ______ day.

A. 1

B. 2

C. 3

D 4 - ANSWER-1



Sign spacing should be adjusted to avoid conflict with existing signs, minimum spacing to existing signs
shall be 200' for speeds of 45 mph or less and a minimum of 400' for speeds 50 mph or greater.

A. True

, B. False - ANSWER-True



The minimum acceptable length for the merge taper shall be determined by _________ the width of the offset
by the merge taper rate.

A. Subtracting

B. Adding

C. Divide

D. Multiplying - ANSWER-Multiplying



The tangent (recovery area) section between the two merge tapers should be 2 times longer of the two merge
tapers.

A. True

B. False - ANSWER-True



What is a fundamental principle of temporary traffic control?

A. To inconvenience motorists as much as possible so they will find another route.

B. To guide and direct motorists through or around the work area as efficiently as possible.

C. To make traffic move as slow as possible.

D. All of the above are fundamental principles. - ANSWER-To guide and direct motorists through or around
the work area as efficiently as possible.



What needs to be done when work is suspended for any length of time?

A. Take down the ROAD WORK AHEAD sign

B. Cover up the END ROAD WORK sign

C. Erect a WORK SUSPENDED sign

D. Cover or remove the FLAGGER AHEAD sign - ANSWER-Cover or remove the FLAGGER AHEAD sign



What are the four zones of a work area?

A. Activity area, pedestrian area, termination area and equipment area.

B. Advance warning area, transition area, activity area and termination area.

C. Equipment area, termination area, activity area and transition area.

D. Transition area, advanced warning area, pedestrian area and buffer zone. - ANSWER-Advance warning
area, transition area, activity area and termination area.

Document information

Uploaded on
April 13, 2026
Number of pages
54
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$17.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
DoctorDee
3.5
(6)
Sold
43
Followers
7
Items
6155
Last sold
6 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions