A ____ is a drawing or set of drawings produced by the contractor, supplier,
manufacturer, subcontractor, or fabricator. - answers-shop drawing
A(n) ____________________ is a physical portion of the specified product. - answers-
sample
T/F Addenda are bulletins of additional information that are germane to the contract
documents issued during the bid period. - answers-true
T/F Codes and regulations are not formally included as construction documents. -
answers-true
T/F Cost control involves containing construction costs within the budget established by
the cost estimate. - answers-true
T/F If the finish is not specified in the documents, the owner typically reviews available
finishes and makes the appropriate selection. - answers-False
Numerous systems are shown on the ___________________ drawings, such as fire
alarm, communication, or security, which may be shown on separate drawings or may
be integrated. - answers-electrical
Some common ____ include door, window, louver, and finish. - answers-schedules
T/F Structural drawings usually do not have definitive dimensions for the foundations
and structural elements. - answers-False
T/F The General Requirements section specifies the products, equipment, and systems
that are intended to be installed during the project. - answers-False
The ____ is an upper-management-level individual who is the ultimate decision maker
for the firm on the project. - answers-principal-in-charge
The ____________________ drawings are usually identified by an "A" designation. -
answers-architectural
The ____________________ is used for tracking the actual progress of the submittal. -
answers-submittal log
, The ____________________ of the project furnishes the construction documents to the
contractor for the project. - answers-owner
The conclusions from ____ cost accounting directly relate to personnel decisions,
operations methods, and the type of project that the contractor chooses to undertake in
the future. - answers-project-based
The construction project ____________________ provide a matrix of organization, with
formal and informal contractual relationships between participants. - answers-delivery
system
T/F The contractor must prioritize the submittal process, submitting and obtaining
approval for materials needed for the first part of the project. - answers-true
T/F The contractor normally stamps the submittals, indicating that they have been
reviewed. - answers-true
The contractor typically stamps the submittals to indicate that they have been
___________. - answers-reviewed
The duration of a construction project is considered ____________ because it has a
specific start date and a specific end date. - answers-finite
T/F The material size and physical characteristics, such as adjustment capabilities,
should be reviewed by both the contractor and the architect. - answers-true
The most common method for compensating the contractor, allowing for changes to the
scope of work during the construction period, is called: - answers-Lump-sum contract
The owner's daily representative during the construction project is called: - answers-The
Owner's Representative
The schedule communicates the plan to ____.
a. field personnel
b. the customer
c. subcontractors
d. all of the above - answers-D
The traditional contract project delivery system has three primary contractual parties:
the owner, the architect, and the ____. - answers-contractor
T/F The traditional project delivery system, also frequently referred to as "design-bid-
build," has been the most used project delivery system since the late 1800s. - answers-
true
A ____ is a drawing or set of drawings produced by the contractor, supplier,
manufacturer, subcontractor, or fabricator. - answers-shop drawing
A(n) ____________________ is a physical portion of the specified product. - answers-
sample
T/F Addenda are bulletins of additional information that are germane to the contract
documents issued during the bid period. - answers-true
T/F Codes and regulations are not formally included as construction documents. -
answers-true
T/F Cost control involves containing construction costs within the budget established by
the cost estimate. - answers-true
T/F If the finish is not specified in the documents, the owner typically reviews available
finishes and makes the appropriate selection. - answers-False
Numerous systems are shown on the ___________________ drawings, such as fire
alarm, communication, or security, which may be shown on separate drawings or may
be integrated. - answers-electrical
Some common ____ include door, window, louver, and finish. - answers-schedules
T/F Structural drawings usually do not have definitive dimensions for the foundations
and structural elements. - answers-False
T/F The General Requirements section specifies the products, equipment, and systems
that are intended to be installed during the project. - answers-False
The ____ is an upper-management-level individual who is the ultimate decision maker
for the firm on the project. - answers-principal-in-charge
The ____________________ drawings are usually identified by an "A" designation. -
answers-architectural
The ____________________ is used for tracking the actual progress of the submittal. -
answers-submittal log
, The ____________________ of the project furnishes the construction documents to the
contractor for the project. - answers-owner
The conclusions from ____ cost accounting directly relate to personnel decisions,
operations methods, and the type of project that the contractor chooses to undertake in
the future. - answers-project-based
The construction project ____________________ provide a matrix of organization, with
formal and informal contractual relationships between participants. - answers-delivery
system
T/F The contractor must prioritize the submittal process, submitting and obtaining
approval for materials needed for the first part of the project. - answers-true
T/F The contractor normally stamps the submittals, indicating that they have been
reviewed. - answers-true
The contractor typically stamps the submittals to indicate that they have been
___________. - answers-reviewed
The duration of a construction project is considered ____________ because it has a
specific start date and a specific end date. - answers-finite
T/F The material size and physical characteristics, such as adjustment capabilities,
should be reviewed by both the contractor and the architect. - answers-true
The most common method for compensating the contractor, allowing for changes to the
scope of work during the construction period, is called: - answers-Lump-sum contract
The owner's daily representative during the construction project is called: - answers-The
Owner's Representative
The schedule communicates the plan to ____.
a. field personnel
b. the customer
c. subcontractors
d. all of the above - answers-D
The traditional contract project delivery system has three primary contractual parties:
the owner, the architect, and the ____. - answers-contractor
T/F The traditional project delivery system, also frequently referred to as "design-bid-
build," has been the most used project delivery system since the late 1800s. - answers-
true