Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

CON 101 Final Exam Study Guide

Rating
-
Sold
-
Pages
9
Grade
A+
Uploaded on
13-04-2026
Written in
2025/2026

CON 101 Final Exam Study Guide

Institution
101 Case Studies In Construction Management
Course
101 Case Studies in Construction Management

Content preview

CON 101 Final Exam Study
Guide



Which type of assignment is not listed on the syllabus for CON 101? - answers-Online
discussions

The Final Exam is cumulative. - answers-T

I need to email my instructor to set-up an appointment to meet during office hours. -
answers-T

The textbook for CON 101 is: - answers-Jackson, B. J. (2020). Construction
Management Jump Start (3rd ed.).

Make-up assignments will be allowed with a valid CSU/CM excuse and should be pre-
arranged with the instructor. - answers-T

According to the text, the U.S. construction industry accounts for approximately
__________ of gross domestic product.? (pp 4 -5). - answers-4.3 %

According to the text, the construction industry dates back to as early as __________ ?
(pp 4 -5). - answers-12000 BC

During which time period were craft guilds organized and formed special brotherhoods
around specific trades? (pp. 5 - 10) - answers-Middle Ages

Each industry sector requires specific expertise and familiarity in order to optimize the
construction operations and management efforts. Therefore, the majority of builders
focus their attention on only one sector or market of the industry. (pp. 10 - 20) -
answers-T

_________ homebuilders construct almost 80 percent of the homes in the United
States. (pp. 10 - 20) - answers-Production

The use of concrete casting beds, cofferdams, and slip forms are common techniques
in which industry sector? (pp. 10 - 20) - answers-Commercial Construction

, Which industry sector deals with brownfield sites (i.e. a property that is abandoned or
underused because of historic environmental contamination). (pp. 10 - 20)] - answers-
Environmental Construction

During which time period was the first building code introduced? (pp. 5- 10) - answers-
Egypt and the Pyramids

Who wrote the first design and construction handbook? (pp. 5 - 10) - answers-Marcus
Vitruvius Pollio

Which of the following is the responsibility of the Owner? - answers-Determining the
quantity, extent, and character of the project by defining the scope of work

Which of the following is the responsibility of the Design Professionals? - answers-
Assisting the owner in selecting products to fit the program and the budget

Which of the following is the responsibility of the Construction Professionals? - answers-
Oversee and manage all of the construction operations into a single, safe coordinated
effort.

Which of the following do not have a contract directly with the owner (they are often
called subcontractors). - answers-Specialty Contractors

Which of the following is NOT one of the CM major entrance requirements? - answers-
Have at least one summer of construction-related work experience

When is the Fall 2020 course add deadline (for most situations): - answers-August 30th
2020

What is the difference between "dropping" a class and "withdrawing" from a class? -
answers-When you drop a class it completely disappears from your transcript, but when
you withdraw you get a W on your transcript.

Based on the reading, which of the following type of companies is most appealing to
you? (This question is to facilitate class discussion - no points). - answers-Local
companies

Fill in the blank: According to Patrick, "Construction management (CM) entails the
planning, scheduling, evaluation, and controlling of construction tasks or activities to
accomplish specific objectives by effectively allocating and utilizing appropriate labor,
material, and time resources in a manner that minimizes costs and maximizes
customer/owner ______________. - answers-satisfaction

Which of the following is NOT listed as one who performs construction management
services? - answers-concrete finishers

Written for

Institution
101 Case Studies in Construction Management
Course
101 Case Studies in Construction Management

Document information

Uploaded on
April 13, 2026
Number of pages
9
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$5.89
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
princessann

Also available in package deal

Thumbnail
Package deal
construction management 1
-
4 2026
$ 17.99 More info

Get to know the seller

Seller avatar
princessann stuvia
View profile
Follow You need to be logged in order to follow users or courses
Sold
-
Member since
1 year
Number of followers
0
Documents
584
Last sold
-
princessann

I am a leader in online test prep. I take great pride in our tests and their ability to help you pass your exams. feel free to contact

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions