• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 72 pages
Exam (elaborations)

Michigan Electrical Inspector {National Electrical Code} Competency Study Guide Comprehensive Resource To Help You Ace Exams Includes Frequently Tested Questions With ELABORATED 100% Correct COMPLETE SOLUTIONS Guaranteed Pass First Attemp

Document preview thumbnail
Preview 4 out of 72 pages

Michigan Electrical Inspector {National Electrical Code} Competency Study Guide Comprehensive Resource To Help You Ace Exams Includes Frequently Tested Questions With ELABORATED 100% Correct COMPLETE SOLUTIONS Guaranteed Pass First Attempt!! Current Update!! 1. Given: after all demand factors have been taken into consideration for an office building, the demand load is determined to be 90,000 VA; the building has a 120/240-volt, single phase electrical system. What MIN. size copper conductors with THHN/THWN insulation are required for the ungrounded service-lateral conductors? Consider all termination lugs are rated for 75 deg. C. A. 400 kcmil B. 350 kcmil C. 300 kcmil D. 500 kcmil - Correct Answer: D. 500 kcmil 2. Given: a commercial building is to be supplied from a transformer having a 480Y/277-volt, 3 phase primary and a 208Y/120-volt, 3 phase secondary. The secondary will have a balanced computed demand load of 416 amperes per phase. The transformer is required to have a MIN kVA rating of ____. A. 100 kVA B. 150 kVA C. 86 kVA D. 200 kVA - Correct Answer: B. 150 kVA 3. Manhole covers shall be OVER ____ or otherwise designed to require the use of tools to open. A. 25 lbs. B. 50 lbs. C. 75 lbs. D. 100 lbs - Correct Answer: D. 100 lbs 4. The branch circuit conductors supplying one or more units of information technology equipment shall have an ampacity of NOT less than ____ of the connected load. A. 80% B. 100% C. 115% D. 125% - Correct Answer: D. 125% 5. In regard to a 7.5 hp, 480-volt, 3 phase ac motor with an 80% power factor and a full-load ampere rating of 19 amperes indicated on the nameplate, and a service factor of 1.15; when the initial setting of the overload device you have selected is not sufficient to carry the load, what is the MAX. setting permitted for the overload protection? A. 21.85 amperes B. 23.75 amperes C. 24.7 amperes D. 26.6 amperes - Correct Answer: D. 26.6 amperes 6. The ampacity adjustment factors for conductors addressed in Section 310.15(C)(1) of the NEC are not required to be applied when the conductors are installed in a metal wireway unless, the number of current-carrying conductors within the wireway exceeds at least ____ at any cross-section area of the wireway. A. 20 B. 30 C. 35 D. 24 - Correct Answer: B. 30 7. What MIN. voltage is require after 1.5 hours to serve emergency lighting from a storage battery when the normal source voltage of 120 volts is interrupted? A. 60 volts B. 90 volts C. 105 volts D. 120 volts - Correct Answer: C. 105 volts 8. Determine the MAX. ampere setting permitted for an overload protective device responsive to motor current, where used to protect a 20 hp, 240 volt, 3 phase, induction type ac motor with a temperature rise of 48 deg. C and a FLA of 54 amperes indicated on the nameplate. A. 54 amperes B. 70.2 amperes C. 62.1 amperes D. 75.6 amperes - Correct Answer: B. 70.2 amperes 9. Where Type SRD multiconductor cable consist of size 8 AWG conductors and only 2 conductors in the cable are current-carrying, what is the ampacity of the conductors? A. 20 amperes B. 30 amperes C. 40 amperes D. 50 amperes - Correct Answer: C. 40 amperes 10. Aluminum or steel cable trays shall be permitted to be used as equipment grounding conductors, provided ____. the cable tray sections and fittings are identified as an equipment grounding conductor. the cable tray sections and fittings are durably marked to show the cross sectional area of the metal. A. I only B. II only C. neither I nor II D. both I and II - Correct Answer: D. both I and II

Content preview

Michigan Electrical Inspector {National Electrical Code}
Competency Study Guide

Comprehensive Resource To Help You Ace 2026-2027 Exams
Includes Frequently Tested Questions With ELABORATED
100% Correct COMPLETE SOLUTIONS

Guaranteed Pass First Attempt!! Current Update!!



1. Given: after all demand factors have been taken into consideration for an
office building, the demand load is determined to be 90,000 VA; the
building has a 120/240-volt, single phase electrical system. What MIN. size
copper conductors with THHN/THWN insulation are required for the
ungrounded service-lateral conductors? Consider all termination lugs are
rated for 75 deg. C.
A. 400 kcmil
B. 350 kcmil
C. 300 kcmil
D. 500 kcmil - Correct Answer: D. 500 kcmil


2. Given: a commercial building is to be supplied from a transformer having a
480Y/277-volt, 3 phase primary and a 208Y/120-volt, 3 phase secondary.
The secondary will have a balanced computed demand load of 416 amperes
per phase. The transformer is required to have a MIN kVA rating of ____.
A. 100 kVA
B. 150 kVA
C. 86 kVA
D. 200 kVA - Correct Answer: B. 150 kVA

,3. Manhole covers shall be OVER ____ or otherwise designed to require the
use of tools to open.
A. 25 lbs.
B. 50 lbs.
C. 75 lbs.
D. 100 lbs - Correct Answer: D. 100 lbs


4. The branch circuit conductors supplying one or more units of information
technology equipment shall have an ampacity of NOT less than ____ of the
connected load.
A. 80%
B. 100%
C. 115%
D. 125% - Correct Answer: D. 125%


5. In regard to a 7.5 hp, 480-volt, 3 phase ac motor with an 80% power factor
and a full-load ampere rating of 19 amperes indicated on the nameplate,
and a service factor of 1.15; when the initial setting of the overload device
you have selected is not sufficient to carry the load, what is the MAX.
setting permitted for the overload protection?
A. 21.85 amperes
B. 23.75 amperes
C. 24.7 amperes
D. 26.6 amperes - Correct Answer: D. 26.6 amperes


6. The ampacity adjustment factors for conductors addressed in Section
310.15(C)(1) of the NEC are not required to be applied when the conductors
are installed in a metal wireway unless, the number of current-carrying
conductors within the wireway exceeds at least ____ at any cross-section
area of the wireway.

, A. 20
B. 30
C. 35
D. 24 - Correct Answer: B. 30


7. What MIN. voltage is require after 1.5 hours to serve emergency lighting
from a storage battery when the normal source voltage of 120 volts is
interrupted?
A. 60 volts
B. 90 volts
C. 105 volts
D. 120 volts - Correct Answer: C. 105 volts


8. Determine the MAX. ampere setting permitted for an overload protective
device responsive to motor current, where used to protect a 20 hp, 240-
volt, 3 phase, induction type ac motor with a temperature rise of 48 deg. C
and a FLA of 54 amperes indicated on the nameplate.
A. 54 amperes
B. 70.2 amperes
C. 62.1 amperes
D. 75.6 amperes - Correct Answer: B. 70.2 amperes


9. Where Type SRD multiconductor cable consist of size 8 AWG conductors
and only 2 conductors in the cable are current-carrying, what is the
ampacity of the conductors?
A. 20 amperes
B. 30 amperes
C. 40 amperes
D. 50 amperes - Correct Answer: C. 40 amperes

, 10.Aluminum or steel cable trays shall be permitted to be used as equipment
grounding conductors, provided ____.
the cable tray sections and fittings are identified as an equipment grounding
conductor.
the cable tray sections and fittings are durably marked to show the cross-
sectional area of the metal.
A. I only
B. II only
C. neither I nor II
D. both I and II - Correct Answer: D. both I and II


11.When intermediate metal conduit is threaded in the field, a standard
cutting die with a ____ taper per ft. shall be used.
A. 3/8 in.
B. 1/2 in.
C. 3/4 in.
D. 1 in. - Correct Answer: C. 3/4 in.


12.In regard to emergency systems, where internal combustion engines are
used as the prime movers, they shall NOT be solely dependent on a public
utility gas system for their fuel supply, unless ____.
A. it is acceptable to the authority having jurisdiction
B. the gas system is listed and approved
C. the gas system and electrical utility are jointly owned and maintained
D. none of these apply - Correct Answer: A. it is acceptable to the
authority having jurisdiction

Document information

Uploaded on
April 9, 2026
Number of pages
72
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EWLindy
3.8
(116)
Sold
775
Followers
432
Items
8827
Last sold
3 weeks ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions