Learn 1 /7 Study with Learn
Extra 10' in TR
Choose an answer
1 Fiber cable slack 2 Horizontal cabling
3 MUTOA distance from TR 4 TIA 568B starts with
Don't know?
Terms in this set (43)
, Horizontal cabling Does not allow 62 micron multimode OM1
Copper cable slack TR to work area without patch cords do not exceed
295' max
Fiber cable slack Extra 10' in TR
Work area TP copper slack 1'
Work area fiber slack 3.3'
TIA 568B starts with Orange Pair
TIA 568B Pin 6 Green
Difficult access in future Install additional outlet or install two outlets
10 outlets difficult to get to Design 20 outlets
Telecom outlet Within 3.3 ft of electrical outlet
Furniture cluster 1 MUTOA per cluster
MUTOA 12 work areas
Patch panel at furniture section MUTOA
MUTOA distance from TR 49' minimum
MUTOA serves 12 work areas
Considerations Exam | Questions with 100%
Correct Answers | Verified | Latest Update 2026
Save
Practice questions for this set
Learn 1 /7 Study with Learn
Extra 10' in TR
Choose an answer
1 Fiber cable slack 2 Horizontal cabling
3 MUTOA distance from TR 4 TIA 568B starts with
Don't know?
Terms in this set (43)
, Horizontal cabling Does not allow 62 micron multimode OM1
Copper cable slack TR to work area without patch cords do not exceed
295' max
Fiber cable slack Extra 10' in TR
Work area TP copper slack 1'
Work area fiber slack 3.3'
TIA 568B starts with Orange Pair
TIA 568B Pin 6 Green
Difficult access in future Install additional outlet or install two outlets
10 outlets difficult to get to Design 20 outlets
Telecom outlet Within 3.3 ft of electrical outlet
Furniture cluster 1 MUTOA per cluster
MUTOA 12 work areas
Patch panel at furniture section MUTOA
MUTOA distance from TR 49' minimum
MUTOA serves 12 work areas