Terms in this set (403)
Vertical conduit mast height above 4"
roof line (Fig 12.5)
Documenting the life cycle of the Performed by the contractor with the WBS.
project.
When retrofitting an existing Review all existing documentation first.
building.
Earned Value management is Calculated as the % of the project completed.
Material delays Alternatives.
Two types of bids. Low bid
Negotiated bid
Scheduling methods that use a PERT
diagram CPM
Design phase CD Construction Document - Used to obtain pricing
for the required work.
, Review the design bid build. Contract awarded.
Contract type - Unit Price When a SOW cannot be defined.
Identify client solutions Budget numbers
Time constraints
Working outline Context
Technical Considerations
GC's decisions Are final - resolves disputes with contractors and
suppliers.
Division 28 Electronic Safety, Security
An RFP is An invitation for contractors to submit a proposal
for services.
Division 27 Communications
Closeout plan should include Spare parts
Training records.
SOW must cover at a minimum What needs to be done
When work will be done
The GC's Superintendent is Critical to synchronizing trades
Division 26 Electrical
CPM has Longest time to complete.
Correct Answers | Verified | Latest Update 2026
Save
Terms in this set (403)
Vertical conduit mast height above 4"
roof line (Fig 12.5)
Documenting the life cycle of the Performed by the contractor with the WBS.
project.
When retrofitting an existing Review all existing documentation first.
building.
Earned Value management is Calculated as the % of the project completed.
Material delays Alternatives.
Two types of bids. Low bid
Negotiated bid
Scheduling methods that use a PERT
diagram CPM
Design phase CD Construction Document - Used to obtain pricing
for the required work.
, Review the design bid build. Contract awarded.
Contract type - Unit Price When a SOW cannot be defined.
Identify client solutions Budget numbers
Time constraints
Working outline Context
Technical Considerations
GC's decisions Are final - resolves disputes with contractors and
suppliers.
Division 28 Electronic Safety, Security
An RFP is An invitation for contractors to submit a proposal
for services.
Division 27 Communications
Closeout plan should include Spare parts
Training records.
SOW must cover at a minimum What needs to be done
When work will be done
The GC's Superintendent is Critical to synchronizing trades
Division 26 Electrical
CPM has Longest time to complete.