Things to check on telescopic boom Crane? -CORRECTANSWER Poor condition of the
sheaves, pendant,end fittings, hoist rope, outriggers, frame, worn wear pads, hydraulic
leaks, and drifting.
Things to check with lattice booms? -CORRECTANSWER Lattice members for dents
and straightness, end fittings for cracks, picture frame for squareness, welts for cracks
and corrosion, chords for damage, especially dense which can reduce boom strength.
Low chart capacities are generally based on the crane being within blank. -
CORRECTANSWER 1% level
When doing duty the cycle what is the deduction in low chart? -CORRECTANSWER
20% or manufacturer provides special load charts
What are some examples of duty cycle? -CORRECTANSWER High speed, high
volume concrete placement, steel erection, drag line clamshell,grapple, and magnet
applications.
, Each shift inspection? -CORRECTANSWER OSHA requires that a shift inspection often
referred to as the pre-operational inspection be performed by a competent person each
shift before the crane is used. This is a visual inspection and is usually performed by the
crane operator.
Monthly and annual inspection? -CORRECTANSWER OSHA also requires a monthly
inspection be conducted by a competent person and a comprehensive inspection of the
entire crane be performed at least annually by a qualified person. Quote, with this
assembly required as a necessity to complete the inspection both monthly and annual
inspections required that records be kept.
When must you tag out a crane? -CORRECTANSWER If a crane is required to be
taken, out of service tag must be placed in the cab stating the equipment is out of
service and not to be used or if a function is not operating properly a tag must be placed
in a place so that the Operator knowsz
Key items to inspect on a crane -CORRECTANSWER Hoist to open reaving, all
operational aids, and safety devices, cab windows, and equipment, hooks and latches,
ground conditions, tires, fluid level, electrical equipment, leveling device, controls and
drive mechanisms, fire extinguisher installed in the cab or machine, machinery, housing,
air hydraulic systems,
Verified Questions and Answers | Latest
Already Graded A+ UPDATE |2026
Things to check on telescopic boom Crane? -CORRECTANSWER Poor condition of the
sheaves, pendant,end fittings, hoist rope, outriggers, frame, worn wear pads, hydraulic
leaks, and drifting.
Things to check with lattice booms? -CORRECTANSWER Lattice members for dents
and straightness, end fittings for cracks, picture frame for squareness, welts for cracks
and corrosion, chords for damage, especially dense which can reduce boom strength.
Low chart capacities are generally based on the crane being within blank. -
CORRECTANSWER 1% level
When doing duty the cycle what is the deduction in low chart? -CORRECTANSWER
20% or manufacturer provides special load charts
What are some examples of duty cycle? -CORRECTANSWER High speed, high
volume concrete placement, steel erection, drag line clamshell,grapple, and magnet
applications.
, Each shift inspection? -CORRECTANSWER OSHA requires that a shift inspection often
referred to as the pre-operational inspection be performed by a competent person each
shift before the crane is used. This is a visual inspection and is usually performed by the
crane operator.
Monthly and annual inspection? -CORRECTANSWER OSHA also requires a monthly
inspection be conducted by a competent person and a comprehensive inspection of the
entire crane be performed at least annually by a qualified person. Quote, with this
assembly required as a necessity to complete the inspection both monthly and annual
inspections required that records be kept.
When must you tag out a crane? -CORRECTANSWER If a crane is required to be
taken, out of service tag must be placed in the cab stating the equipment is out of
service and not to be used or if a function is not operating properly a tag must be placed
in a place so that the Operator knowsz
Key items to inspect on a crane -CORRECTANSWER Hoist to open reaving, all
operational aids, and safety devices, cab windows, and equipment, hooks and latches,
ground conditions, tires, fluid level, electrical equipment, leveling device, controls and
drive mechanisms, fire extinguisher installed in the cab or machine, machinery, housing,
air hydraulic systems,