ghn ghn ghn
Whichghnofghntheghnfollowingghnclassesghnofghnasphaltghnshinglesghnwouldghnhavegh
ntheghnbestghnfireghnrating?ghn
ClassghnC
ClassghnA
GradeghnA
ClassghnBghn-ghnCORRECTghnANSWERClassghnA
IBC:ghn1505.2
IRC:ghnR902.1
Whenghninstallingghnstripghnwoodghnflooringghnwhatghnisghntheghnrecommendedghn
minimumghnstaggeredghndistanceghnofghntheghnbuttedghnjointsghnfromghnthoseghnofghn
theghnpreceedingghnrow?
9ghninches
15ghninches
6ghninches
12ghninchesghn-ghnCORRECTghnANSWER6ghninches
Aghnweepghnscreedghnshallghnbeghnplacedghnaghnminimumghnofghnhowghnmanyghninch
esghnaboveghntheghnearth?
,4ghninches
8ghninches
6ghninches
2ghninchesghn-ghnCORRECTghnANSWER4ghninches
IRC:ghnR703.7.2.1
IBC:ghn2512.1.2
Materialsghnusedghnforghnsprayedghnfoamed-in-
ghnplaceghnroofghninsulationghnonghntypeghnIIIghnandghnIVghnbuildingsghnshallghncomp
lyghnwith
ASTMghnCghn1029
ASTMghnD2626
ASTMghnV957
ASTMghnD4434ghn-ghnCORRECTghnANSWERASTMghnCghn1029
IRC:ghnR905.14.2
IBC:ghn1507.14.2
Whichghnofghntheghnfollowingghngradesghnofghnveneerghnplywoodghndesignatesghnth
eghnhighestghnquality?
,D
C
B
Aghn-ghnCORRECTghnANSWERA
Carpentryghnandghnbuildingghnconstructionghnpgghn340
Ifghnyoughnhaveghn8ghnemployeesghninghnyourghncompanyghnandghnyoughnmoveghninto
ghnaghnnewghnbuilding,ghnwhatghnsafetyghnprecautions ghnareghnrequiredghnbyghnOSH
A?
Nothing
VerbalghnExplanationghnofghnemergencyghnplan
Installghnalarmghnsystemghnidentifyingghntheghncause
Appointghn4ghnemployeesghnasghnsafetyghnpersonnelghn-
ghnCORRECTghnANSWERVerbalghnexplanation ghnofghnemergencyghnplan
(10ghnorghnmoreghnemployeesghnrequireghnwrittenghnplan)
OSHAghn1926.35(e)(3)
Referghntoghntheghnillustrationghnofghnaghn2ghnstoryghnhouseghnw/
lapghnsidingghnplans,ghn(completeghnsetghnofghnplansghnatghntheghntestghncenter),ghnwh
atghnisghntheghnelevationghnofghntheghnheightghnintermediateghnlandingghnofghntheghnsta
irs?
, 61ghn1/2ghninches
55ghninches
53ghn1/2ghninches
107ghninchesghn-ghnCORRECTghnANSWER61ghn1/2ghninches
Referghntoghndiagram
Anghnareaghnwhereghnemptyghndrumsghnthatghnhaveghnheldghnflammableghnorghnhaza
rdousghnproductghnareghnbeingghnweldedghnorghncutghncanghnincludeghnallghnofghntheghn
followingghnexcept:
inspectionghn&ghncleaningghnforghncutting
Boringghnholeghninghntankghntoghnrelieveghnheatghnpressure
Oxygenghnusedghnforghncoolingghnbarrelsghnandghnblowingghndustghnfromghnclothin
g
Aghnfireghnextinguisherghnnearbyghnandghnreadyghntoghnuseghn-
ghnCORRECTghnANSWEROxygenghnusedghnforghncoolingghnbarrelsghnandghnblo
wingghndustghnfromghnclothing
Oshaghn1926.353(a)(5)
Whichghnofghntheghnfollowingghnshouldghnbeghnusedghnforghndrywallghnfinishingghnin
ghnpreparation ghnforghnpainting ghnandghnwallghncovering?