Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 8 pages
Exam (elaborations)

B 6V Module 3 Quiz 1 | Score 90/100 | Ashworth College

Document preview thumbnail
Preview 2 out of 8 pages

B 6V Module 3 Quiz 1 | Score 90/100 | Ashworth College

Content preview

Question 1 points
The first step to using the average end area method is to
Question options:
determine where the cut and fill are located on the site.

select a station to be the average end area cross-section.

define the boundary limits of the site.

draw a cross-section at each station line.
Question 2 points
The footprint of the building is shown below. External dimensions are 29'0" x 40'0". Use 5'0" to
compensate the accuracy and slope. Assuming the topsoil to be removed is 10" thick, determine
the quantity of topsoil to be removed and stockpiled. Answer should be in cubic yards.


Question options:
47 cy

1,275 cy

369 cy

41 cy
Question 3 points
Which of the following is a true statement about asphalt paving?
Question options:

, It is calculated in square feet or square yards, and the thickness is not important.

Subcontractor quotes generally include just the asphalt paving and not the gravel subbase course or other items.

It is generally provided by a subcontractor because of the specialized equipment required.

It can be performed throughout the year; therefore, the schedule is not a consideration when estimating asphalt.
Question 4 points
The estimator should always check the specifications because the specifications will define
Question options:
which subcontractor will perform various parts of the contract with respect to earthwork.

the soil and water conditions the contractor will encounter.

the quantity of earth to be removed.

the extent of the work covered by the contract.
Question 5 points
Dewatering on a construction project site is
Question options:
almost always the responsibility of the contractor.

not dependent upon the time of year in which the project is to be built.

considered the removal of ground water and generally does not include surface water or rain.

generally a minor consideration in earthwork and does not add significantly to the bid price.
Question 6 points

Document information

Uploaded on
March 31, 2026
Number of pages
8
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$18.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
NurseHenny
4.4
(31)
Sold
173
Followers
75
Items
2088
Last sold
1 week ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions