Content preview

CPIM - MPR

Abnormal demand - answer demand in any period that is outside the limits established
by management policy:
1. Not in the forecast
2. From a nonregular customer
3. Random, nonrecurring, highly variable
4. Not received through normal channels

actual demand - answer made up of customer orders; consumes the forecast,
depending on rules chosen over a time horizon

adaptive smoothing - answerform of exponential smoothing where the smoothing
constant is automatically adjusted as a function of forecast error measurement

advanced planning and scheduling (APS) - answer techniques that deal with analysis
and planning of logistics and manufacturing during short, intermediate, and long-term
time periods; main components: (1) demand planning, (2) production planning, (3)
production scheduling, (4) distribution planning, and (5) transportation planning
aggregate forecast

aggregate forecast - answerestimate of sales for a grouping of products or product
families; used for sales and production planning

aggregate plan - answerplan that includes budgeted levels of finished goods, inventory,
production backlogs, and changes in the workforce to support the production strategy;
aggregated information is used

allocation - answerclassification of quantities of items that have been assigned to
specific orders but have not yet been released from the stockroom to production;
process used to distribute material in short supply

alpha factor/smoothing constant - answerweighting factor used in exponential
smoothing; applied to the most recent demand, observation, or error (error = actual
demand - forecast); range is 0 to 1

base series - answerstandard succession of values of demand-over-time data used in
forecasting seasonal items; based on relative level of demand during the corresponding
period of previous years (average value = 1, >1 is over average demand, <1 is under
average demand)

benchmarking - answercomparing a company's costs, products, and services to that of
a company thought to have superior performance

,types: (1) competitive (2) financial (3) functional (4) performance (5) process (6) product
(7) strategic

bill of distribution/distribution network structure - answershows the dependencies
between stocking locations at multilevel of distribution network

bill of resources/bill of capacity - answerlisting of the required capacity and key
resources needed to manufacture one unit of a selected item or family; RCCP uses
these bills to calculate the approximate capacity requirements of the MPS

bottom-up replanning - answer(in MRP) process of using pegging data to solve material
availability or other problems performed by the planner; solutions include compressing
lead time, cutting order quantity, substituting material, and changing the MPS

bucketed system - answer(in MRP, DRP or other time=phased system) all time-phased
data are accumulated into time periods, i.e. buckets

bucketless system - answer(in MRP, DRP or other time-phased system) time-phased
data are processed, stored, and displayed using data records rather than defined time
periods

by-product - answermaterial of value produced as a residual of or incidental to the
production process

capable-to-promise (CTP) - answerprocess of committing orders against available
capacity and inventory; used to determine when a new or unscheduled customer order
can be delivered; employees finite scheduling model of the manufacturing system and
includes constraints

capacity planning using overall factors (CPOF) - answerRCCP technique; master
schedule items and quantities are multiplied by the total time required to build each item
to provide total number of hours to produce the schedule; historical work center
percentages are applied to the total hours to provide estimate of hours per work center
required

cash-to-cash cycle time - answerindicator of how efficiently a company manages its
assets to improve cash flow

= inventory days + accounts receivable days - accounts payable days

chase production method - answerproduction planning method that maintains a stable
inventory level while varying production to meet demand

collaborative planning, forecasting, and replenishment (CPFR) - answercollaboration
process where supply chain trading partners jointly plan key supply chain activities;

, includes business planning, sales forecasting, and operations required to replenish raw
materials and finished goods

common parts bill of material - answertype of planning bill that groups common
components for a product/family of products into one bill of material, structured to a
pseudo-parent part number

consuming the forecast/forecast consumption - answerprocess of reducing the forecast
by customer orders or other types of actual demands as they are received

continuous production - answerproduction system where the productive equipment is
organized and sequenced according to the steps involved to produce the product;
routing of jobs is fixed and setups are seldom changed

co-product - answerproduct that is usually manufactured together or sequentially
because of product or process similarities

correlation - answerrelationship between two sets of data where when one changes, the
other is likely to make a corresponding change; can be positive or negative

cumulative ATP - answercalculation based on ATP figure in MPS
with look-ahead ATP and without look-ahead ATP

cumulative ATP with look-ahead - answer= ATP from previous period + MPS of period -
backlog of period - (sum of differences between backlogs and MPSs of all future periods
until period where point production exceeds backlogs)

cumulative ATP without look-ahead - answer= ATP in previous period + MPS - backlog
in period being considered

curve fitting - answerapproach to forecasting based on a straight line, polynomial, or
other curve that describes some historical time series data

customer relationship management (CRM) - answermarketing philosophy based on
putting the customer first; includes account management, catalog and order entry,
payment processing, credits and adjustments, and other functions

customer-supplier partnership - answerlong-term relationship between a buyer and
supplier characterized by teamwork and mutual confidence; supplier considered an
extension of the buyer's organization; ex. buyer provides long-term contracts and uses
fewer suppliers while supplier implements quality assurance processes

decomposition - answermethod of forecasting where time series data are separated into
three components: trend, seasonal, and cyclical; new forecast is made by projecting the
patterns individually determined and then combining them

Document information

Uploaded on
March 30, 2026
Number of pages
17
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$16.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
julianah420
4.2
(158)
Sold
719
Followers
329
Items
36066
Last sold
4 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions