NCIDQ - Week 3 Building Systems with all Correct &
100% Verified Answers |Guaranteed to Pass
Snow on a building's roof top is an example of? ✔Correct Answer-dynamic load
During the design development phase of design, what method would NOT be used to reduce
potential noise problems in a room whose exact size and shape had not yet been determined?
1 Plan for sound-absorbent material on the walls of the room.
2 Design the room to have the largest ceiling surface area possible.
3 Study ways to increase the transmission loss of the room's partitions.
4 Minimize the length of the wall separating the room from noisier areas. ✔Correct Answer-2
Design the room to have the largest ceiling surface area possible.
Diffusers ✔Correct Answer-have directional fins at different angles (sometimes adjustable) to
distribute the air throughout the space.
Registers ✔Correct Answer-(in the floor or wall) can be open, closed, or adjusted somewhere in-
between.
grilles ✔Correct Answer-often used for return air have no movable parts or slats for adjustment.
When designing for aging in place, which would be the best type of replacement windows to specify
during the remodeling?
1 double hung
2 casement
3 jalousie windows
4 fixed windows ✔Correct Answer-2 casement
Generally, the _____________ the bearing capacity of the soil (soft clay, mud, and sand), the larger
and more spread out the footing should be to adequately support the building loads.
1 softer
2 composite
3 harder
4 articulated
5 stronger ✔Correct Answer-2 Softer
You are planning a design with wood paneling, ceiling coffers, and wainscoting for a restaurant.
What percentage of wall and ceiling area cannot be exceeded?
A 15%
B 30%
C 10%
D 20% ✔Correct Answer-C 10%
Construction elements that control the spread of fire, such as fire doors and fire walls, are classified
as:
1 smoke detection
2 passive
3 active
4 fire prevention ✔Correct Answer-2 passive
100% Verified Answers |Guaranteed to Pass
Snow on a building's roof top is an example of? ✔Correct Answer-dynamic load
During the design development phase of design, what method would NOT be used to reduce
potential noise problems in a room whose exact size and shape had not yet been determined?
1 Plan for sound-absorbent material on the walls of the room.
2 Design the room to have the largest ceiling surface area possible.
3 Study ways to increase the transmission loss of the room's partitions.
4 Minimize the length of the wall separating the room from noisier areas. ✔Correct Answer-2
Design the room to have the largest ceiling surface area possible.
Diffusers ✔Correct Answer-have directional fins at different angles (sometimes adjustable) to
distribute the air throughout the space.
Registers ✔Correct Answer-(in the floor or wall) can be open, closed, or adjusted somewhere in-
between.
grilles ✔Correct Answer-often used for return air have no movable parts or slats for adjustment.
When designing for aging in place, which would be the best type of replacement windows to specify
during the remodeling?
1 double hung
2 casement
3 jalousie windows
4 fixed windows ✔Correct Answer-2 casement
Generally, the _____________ the bearing capacity of the soil (soft clay, mud, and sand), the larger
and more spread out the footing should be to adequately support the building loads.
1 softer
2 composite
3 harder
4 articulated
5 stronger ✔Correct Answer-2 Softer
You are planning a design with wood paneling, ceiling coffers, and wainscoting for a restaurant.
What percentage of wall and ceiling area cannot be exceeded?
A 15%
B 30%
C 10%
D 20% ✔Correct Answer-C 10%
Construction elements that control the spread of fire, such as fire doors and fire walls, are classified
as:
1 smoke detection
2 passive
3 active
4 fire prevention ✔Correct Answer-2 passive