NCIDQ Exam Questions (IDPX) with All Correct & 100%
Verified Answers |Actual Complete Exam |Already
Graded A+
The high forward reach shall be __ maximum where the reach depth is 20 inches (510 mm)
maximum. ✔Correct Answer-48"
Where the reach depth exceeds 20 inches (510 mm), the high forward reach shall be ___ maximum
and the reach depth shall be ___ maximum. ✔Correct Answer-44", 25"
The "Room Corner Test" or NFPA 265/UL 1715 typical addresses what fabric situation? ✔Correct
Answer-Specifically when napped, tufted, or looped textiles are used as "wallcoverings" on walls and
ceilings.
tests vertical treatments such as curtains, draperies, window shades, large wall hangings or
tapestries, and plastic films used for decorative purposes. ✔Correct Answer-Vertical Flame Test,
NFPA 701/ASTM6413
__ tests how a product will smolder before either flaming or extinguishing an actual smoldering
cigarette as the ignition source. ✔Correct Answer-Smolder resistance test/cigarette ignition test,
NFPA 260/ASTM E1353/CAL 117
tests both the flame spread and smoke development ratings in the classification of interior finishes
applied to walls, ceilings, and other structural elements. ✔Correct Answer-Steiner tunnel test,
ASTM E84/UL 723
For an assembly space, any occupant load over 49 requires __ exits ✔Correct Answer-2
Three exits are required for any space when the occupant load is between ___ occupants.
✔Correct Answer-501-1000
Four exits or exit access doorways shall be provided from any space with an occupant load ___
✔Correct Answer-greater than 1000
What is included in the net area of a building? ✔Correct Answer-the actual area to accommodate
specific functions
T/F: Net area includes primary and secondary circulation space, closets, electrical and telephone
equipment rooms, exterior walls, or the building core. ✔Correct Answer-F
T/F: The net area does not include incidental space - interior walls and building columns. Sometimes
the net area is referred to as the net assignable area and the secondary spaces are referred to as the
unassigned areas. ✔Correct Answer-T
swinging doors, storm doors, or when the bottom edge of the pane is less than 18" above the door
✔Correct Answer-Most important use for safety glass
,Because the bottom edge of the window pane is lower than 18″ AFF, ... ✔Correct Answer-safety
glass is required
The lobby of a building from the stair enclosure to the exterior door is called: ✔Correct Answer-
exit discharge
is the part of egress between the exit and public way. ✔Correct Answer-exit discharge
Exit discharge is the part of egress between the __ and __ ✔Correct Answer-exit and public way
Standard mounting height for light switches is ✔Correct Answer-48"
Which is used to determine the number of exits required in a space? ✔Correct Answer-occupant
load
For an interior design project, which of the following involves verifying and ensuring that the building
elements are designed, installed, and calibrated to operate as intended for the tenant's scope of
work? ✔Correct Answer-building comissioning
the ratio of the net area or net assignable area to the usable area ✔Correct Answer-efficiency
factor
What two things does the designer need to know when determining the maximum travel distance?
✔Correct Answer-occupancy classification and whether the building is sprinklered or not
determines how many exits are needed. ✔Correct Answer-occupancy classification
determine the location of the exits. ✔Correct Answer-sprinklers
For PRAC, 2.8 Storage rooms exceeding __ MUST be 1-hour rated. ✔Correct Answer-100 sqft
is a percentage of each payment that is withheld by the owner and not paid until the contractor has
completed the work. ✔Correct Answer-retainage
When an interior designer reviews shop drawings, it is only for conformance with the design concept
and intent expressed in the contract documents. Ultimately the ___ is responsible for determining
the accuracy and completeness of dimensions, details, and quantities. ✔Correct Answer-contractor
In this situation, although the interior designer signed off on a shop drawing with an incorrect
dimension, the ___ is still responsible for making sure that the end result follows the design
concept/intent expressed in the contract documents. ✔Correct Answer-contractor
Which of the following forms would need to be approved and completed to authorize a variation
from the original contract documents? ✔Correct Answer-change order
accomplished in one of 3 ways:
by minor changes in work
by construction change directive
by formal change order ✔Correct Answer-changes in construction work
During bidding and prior to contract award, changes are made by ✔Correct Answer-addenda
, With the contract documents complete the owner is ready to initiate the construction administration
phase of the design.
Typically this involves which of the following agreements? ✔Correct Answer-bid contract between
the owner and the selected contractor
the owner (with the possible assistance of the interior designer) selects a contractor to do the work.
The contractor and owner then decide a price and other terms of their agreement. The contractor
may be selected based on a previous working relationship, on the recommendations of others, or
both. ✔Correct Answer-negotiated contract
the drawings and specifications are completed by the interior designer (and other consultants, if
necessary) and then sent to several general contractors who quote the work defined by the contract
documents. The owner (again, with the assistance of the interior designer) can then select the
contractor based on cost as well as experience, schedule, and other criteria. ✔Correct Answer-bid
contract
What are items that would be included in a project notebook? ✔Correct Answer-submittals, shop
drawings, punch list (not a copy of all bonds)
provide adequate facilities for the delivery, unloading, staging, and storage of furniture, fixtures and
equipment ✔Correct Answer-responsibility of the client
any costs incurred by the contractor due to the owner's failure to conform to the schedule or due to
other delays caused by the owner ✔Correct Answer-responsibility of the client
security against loss or damage to the furniture and fixtures stored at the site between the dates of
delivery and final acceptance by the owner ✔Correct Answer-responsibility of the client
issued when a change is needed during construction, but the owner and contractor have not agreed
yet — this is often about pricing. The change directive allows construction to continue without delay.
✔Correct Answer-construction change directive
is often bound into the project manual along with the specifications, it is only a proposal and is not
considered part of the contract documents. ✔Correct Answer-bid form
1. Conduct punch list with contractor and client
2. Verify correction of punch list items ✔Correct Answer-activities that happen during CA
T/F: Verification of correction of punch list items happens during project close out ✔Correct
Answer-F
During the contract administration phase the interior designer is responsible for verifying the
correction of __ ✔Correct Answer-punch list items
While traveling for an installation, how should the designer handle their travel expenses?
✔Correct Answer-bill to the client at cost or with a service charge
Which of the following professionals is responsible for the location of thermostats? ✔Correct
Answer-mechanical engineer
Verified Answers |Actual Complete Exam |Already
Graded A+
The high forward reach shall be __ maximum where the reach depth is 20 inches (510 mm)
maximum. ✔Correct Answer-48"
Where the reach depth exceeds 20 inches (510 mm), the high forward reach shall be ___ maximum
and the reach depth shall be ___ maximum. ✔Correct Answer-44", 25"
The "Room Corner Test" or NFPA 265/UL 1715 typical addresses what fabric situation? ✔Correct
Answer-Specifically when napped, tufted, or looped textiles are used as "wallcoverings" on walls and
ceilings.
tests vertical treatments such as curtains, draperies, window shades, large wall hangings or
tapestries, and plastic films used for decorative purposes. ✔Correct Answer-Vertical Flame Test,
NFPA 701/ASTM6413
__ tests how a product will smolder before either flaming or extinguishing an actual smoldering
cigarette as the ignition source. ✔Correct Answer-Smolder resistance test/cigarette ignition test,
NFPA 260/ASTM E1353/CAL 117
tests both the flame spread and smoke development ratings in the classification of interior finishes
applied to walls, ceilings, and other structural elements. ✔Correct Answer-Steiner tunnel test,
ASTM E84/UL 723
For an assembly space, any occupant load over 49 requires __ exits ✔Correct Answer-2
Three exits are required for any space when the occupant load is between ___ occupants.
✔Correct Answer-501-1000
Four exits or exit access doorways shall be provided from any space with an occupant load ___
✔Correct Answer-greater than 1000
What is included in the net area of a building? ✔Correct Answer-the actual area to accommodate
specific functions
T/F: Net area includes primary and secondary circulation space, closets, electrical and telephone
equipment rooms, exterior walls, or the building core. ✔Correct Answer-F
T/F: The net area does not include incidental space - interior walls and building columns. Sometimes
the net area is referred to as the net assignable area and the secondary spaces are referred to as the
unassigned areas. ✔Correct Answer-T
swinging doors, storm doors, or when the bottom edge of the pane is less than 18" above the door
✔Correct Answer-Most important use for safety glass
,Because the bottom edge of the window pane is lower than 18″ AFF, ... ✔Correct Answer-safety
glass is required
The lobby of a building from the stair enclosure to the exterior door is called: ✔Correct Answer-
exit discharge
is the part of egress between the exit and public way. ✔Correct Answer-exit discharge
Exit discharge is the part of egress between the __ and __ ✔Correct Answer-exit and public way
Standard mounting height for light switches is ✔Correct Answer-48"
Which is used to determine the number of exits required in a space? ✔Correct Answer-occupant
load
For an interior design project, which of the following involves verifying and ensuring that the building
elements are designed, installed, and calibrated to operate as intended for the tenant's scope of
work? ✔Correct Answer-building comissioning
the ratio of the net area or net assignable area to the usable area ✔Correct Answer-efficiency
factor
What two things does the designer need to know when determining the maximum travel distance?
✔Correct Answer-occupancy classification and whether the building is sprinklered or not
determines how many exits are needed. ✔Correct Answer-occupancy classification
determine the location of the exits. ✔Correct Answer-sprinklers
For PRAC, 2.8 Storage rooms exceeding __ MUST be 1-hour rated. ✔Correct Answer-100 sqft
is a percentage of each payment that is withheld by the owner and not paid until the contractor has
completed the work. ✔Correct Answer-retainage
When an interior designer reviews shop drawings, it is only for conformance with the design concept
and intent expressed in the contract documents. Ultimately the ___ is responsible for determining
the accuracy and completeness of dimensions, details, and quantities. ✔Correct Answer-contractor
In this situation, although the interior designer signed off on a shop drawing with an incorrect
dimension, the ___ is still responsible for making sure that the end result follows the design
concept/intent expressed in the contract documents. ✔Correct Answer-contractor
Which of the following forms would need to be approved and completed to authorize a variation
from the original contract documents? ✔Correct Answer-change order
accomplished in one of 3 ways:
by minor changes in work
by construction change directive
by formal change order ✔Correct Answer-changes in construction work
During bidding and prior to contract award, changes are made by ✔Correct Answer-addenda
, With the contract documents complete the owner is ready to initiate the construction administration
phase of the design.
Typically this involves which of the following agreements? ✔Correct Answer-bid contract between
the owner and the selected contractor
the owner (with the possible assistance of the interior designer) selects a contractor to do the work.
The contractor and owner then decide a price and other terms of their agreement. The contractor
may be selected based on a previous working relationship, on the recommendations of others, or
both. ✔Correct Answer-negotiated contract
the drawings and specifications are completed by the interior designer (and other consultants, if
necessary) and then sent to several general contractors who quote the work defined by the contract
documents. The owner (again, with the assistance of the interior designer) can then select the
contractor based on cost as well as experience, schedule, and other criteria. ✔Correct Answer-bid
contract
What are items that would be included in a project notebook? ✔Correct Answer-submittals, shop
drawings, punch list (not a copy of all bonds)
provide adequate facilities for the delivery, unloading, staging, and storage of furniture, fixtures and
equipment ✔Correct Answer-responsibility of the client
any costs incurred by the contractor due to the owner's failure to conform to the schedule or due to
other delays caused by the owner ✔Correct Answer-responsibility of the client
security against loss or damage to the furniture and fixtures stored at the site between the dates of
delivery and final acceptance by the owner ✔Correct Answer-responsibility of the client
issued when a change is needed during construction, but the owner and contractor have not agreed
yet — this is often about pricing. The change directive allows construction to continue without delay.
✔Correct Answer-construction change directive
is often bound into the project manual along with the specifications, it is only a proposal and is not
considered part of the contract documents. ✔Correct Answer-bid form
1. Conduct punch list with contractor and client
2. Verify correction of punch list items ✔Correct Answer-activities that happen during CA
T/F: Verification of correction of punch list items happens during project close out ✔Correct
Answer-F
During the contract administration phase the interior designer is responsible for verifying the
correction of __ ✔Correct Answer-punch list items
While traveling for an installation, how should the designer handle their travel expenses?
✔Correct Answer-bill to the client at cost or with a service charge
Which of the following professionals is responsible for the location of thermostats? ✔Correct
Answer-mechanical engineer