NCIDQ - IDPX Baseline Exam Questions with all Correct
& 100% Verified Answers |Latest Version |Already
Graded A+
Which of the following puts more responsibility on the designer, can be used to explore unique
design solutions and the use of new technology, are used to set criteria rather than requirements,
and must be coordinated with the AHJ for final approval?
Prescriptive Specifications
Performance Codes
Prescriptive Codes
Proprietary Specifications ✔Correct Answer-Performance Codes
What is the drawing for the 54th floor electrical plan?
54E3.1
E3.1-54
3.1E-54
none of the above ✔Correct Answer-54E3.1
After defining the exact scope of work and selecting individual floor finish types for each area of your
project, you must provide your client with an updated working budget number.
Which method of estimating would be used at this time?
Local Cost Indicies
Square Footage Method
Parameter Method
Matrix Costing ✔Correct Answer-Parameter Method
You are working with a client on a quick retrofit that requires furniture to be ordered, delivered and
installed within a quick 4-week time period.
Which form during the ordering process with the furniture dealer/manufacturer/vendor should you
give careful attention in order to verify the timeline will not be disrupted?
Freight Bill
Acknowledgement
Purchase Order
Sales Agreement ✔Correct Answer-Acknowledgement
During construction, changes in the construction work are made by all of the following means
except?
change order
change directive
minor change in work
addenda ✔Correct Answer-addenda
All of the following steps are part of the project close out except?
, respond to owner's questions and problems during period immediately after move in process
verify issuance of certificate of occupancy
final application and certificate for payment
verify owner has received all lien waivers ✔Correct Answer-verify issuance of certificate of
occupancy
As outlined in the General Conditions of the Contract for Construction, who pays for any field
tests/inspections beyond what is required in the contract documents?
Owner
General Contractor
Interior Designer
Both the Owner and the General Contractor ✔Correct Answer-Both the Owner and the General
Contractor
he last person to see the mechanical shop drawings before they are returned to the mechanical
subcontractor should be the
architect
interior designer
general contractor
mechanical engineer ✔Correct Answer-general contractor
A large tech company has acquired another company and is redesigning their office space to fit their
new combined workforce.
Who should be present at the final design development presentation for changing the office layout?
project manager, office manager, design principal, facility manager
client, facility manager, office manager, project manager
general contractor, facility manager, design principal, client
design principal, project manager, general contractor, client ✔Correct Answer-design principal,
project manager, general contractor, client
Which standard addresses vertical hangings and window treatments?
NFPA 253/ASTM E648
NFPA 701/ASTM D6413
NFPA 286/ASTM E2257
NFPA 269/ASTM E1678 ✔Correct Answer-NFPA 701/ASTM D6413
What is the occupancy load of a 2600 (242 m2) sq ft office suite?
260
180
18
52 ✔Correct Answer-18
Which of the following is NOT true about barrier-free doorways?
a door must have a minimum clear open width of 32" (815 mm) when opened at 90 degrees
& 100% Verified Answers |Latest Version |Already
Graded A+
Which of the following puts more responsibility on the designer, can be used to explore unique
design solutions and the use of new technology, are used to set criteria rather than requirements,
and must be coordinated with the AHJ for final approval?
Prescriptive Specifications
Performance Codes
Prescriptive Codes
Proprietary Specifications ✔Correct Answer-Performance Codes
What is the drawing for the 54th floor electrical plan?
54E3.1
E3.1-54
3.1E-54
none of the above ✔Correct Answer-54E3.1
After defining the exact scope of work and selecting individual floor finish types for each area of your
project, you must provide your client with an updated working budget number.
Which method of estimating would be used at this time?
Local Cost Indicies
Square Footage Method
Parameter Method
Matrix Costing ✔Correct Answer-Parameter Method
You are working with a client on a quick retrofit that requires furniture to be ordered, delivered and
installed within a quick 4-week time period.
Which form during the ordering process with the furniture dealer/manufacturer/vendor should you
give careful attention in order to verify the timeline will not be disrupted?
Freight Bill
Acknowledgement
Purchase Order
Sales Agreement ✔Correct Answer-Acknowledgement
During construction, changes in the construction work are made by all of the following means
except?
change order
change directive
minor change in work
addenda ✔Correct Answer-addenda
All of the following steps are part of the project close out except?
, respond to owner's questions and problems during period immediately after move in process
verify issuance of certificate of occupancy
final application and certificate for payment
verify owner has received all lien waivers ✔Correct Answer-verify issuance of certificate of
occupancy
As outlined in the General Conditions of the Contract for Construction, who pays for any field
tests/inspections beyond what is required in the contract documents?
Owner
General Contractor
Interior Designer
Both the Owner and the General Contractor ✔Correct Answer-Both the Owner and the General
Contractor
he last person to see the mechanical shop drawings before they are returned to the mechanical
subcontractor should be the
architect
interior designer
general contractor
mechanical engineer ✔Correct Answer-general contractor
A large tech company has acquired another company and is redesigning their office space to fit their
new combined workforce.
Who should be present at the final design development presentation for changing the office layout?
project manager, office manager, design principal, facility manager
client, facility manager, office manager, project manager
general contractor, facility manager, design principal, client
design principal, project manager, general contractor, client ✔Correct Answer-design principal,
project manager, general contractor, client
Which standard addresses vertical hangings and window treatments?
NFPA 253/ASTM E648
NFPA 701/ASTM D6413
NFPA 286/ASTM E2257
NFPA 269/ASTM E1678 ✔Correct Answer-NFPA 701/ASTM D6413
What is the occupancy load of a 2600 (242 m2) sq ft office suite?
260
180
18
52 ✔Correct Answer-18
Which of the following is NOT true about barrier-free doorways?
a door must have a minimum clear open width of 32" (815 mm) when opened at 90 degrees