• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 8 pages
Other

Cepsci Verified Accurate Study Guide

Document preview thumbnail
Preview 2 out of 8 pages

CEPSCI VERIFIED ACCURATE STUDY GUIDE

Content preview

CEPSCI VERIFIED ACCURATE STUDY GUIDE

NPDES - Answers - National Pollutant Discharge Elimination System

Clean Water Act - Answers - Administered by the EPA in 1972

Water Quality Act - Answers - Amendment to CWA in 1987 to regulate storm water
discharges under NPDES program

Point Source Pollution - Answers - Discharges from readily identifiable sources like
treatment plants

Nonpoint Source Solution - Answers - Runoff from urbanized or agricultural areas

NPDES in South Carolina - Answers - SC is a delegated state. Regulations are
administered by SCDHEC

CGP Phase II - Answers - Construction General Permit effective on September 1, 2006

NPDES Permit Coverage - Answers - 1 or more acres of land disturbance. Within 1/2
mile of a receiving water body in SC Coastal Zone

NOI - Answers - Notice Of Intent

CGP Requirements for OCRM - Answers - Coverage granted 7 days after DHEC
receives NOI

CGP Requirements for SCDOT - Answers - Coverage granted 10 days after DHEC
receives NOI

CGP Requirements for DHEC - Answers - Coverage granted 20 days after DHEC
receives completed NOI

SWPPP - Answers - Storm Water Pollution Prevention Plan, Completed prior to filing
NOI, Prepared in accordance with Phase II CGP

SWPPP Requirements - Answers - Identification of operators
Sequence of construction
Locations of all BMP's
Locations of all surface waters of state

CGP Filing - Answers - Must be in compliance with all other permits
Must comply with Federal reporting requirements
File NOT when construction is complete
Retain documentation 3 years.

, Pre Construction meeting - Answers - 10 or more acres
Explain SWPPP to all co-permittees
Contractors that are not co-permittees and the preparer must be present

Contractor Certification - Answers - Co-permittees certify that are responsible for control
of the SWPPP and have participated in a Pre-Con meeting
All Contractors that are not co-permittees must certify accountability to DHEC and a
Pre-Con meeting

EPSC Inspector Qualifications - Answers - Individuals certified by a DHEC approved
course.

Inspection Frequency - Answers - (A) At least once every 7 days, or
(B) At least once every 14 days and within 24 hours of the end of a storm event of 0.5
inches or greater
(C) Once a month if entire site is temporarily stabilized

Inspection Locations - Answers - All areas disturbed by construction activities
Areas used for materials storage exposed to precipitation
Sediment/Erosion control structures in SWPPP
All discharge locations
Nearby downstream locations
Constuction entrances

Inspection Report - Answers - 1. Date
2. Inspector credentials
3. Weather info since last report
4. Description of any discharges occuring
5. locations of discharges of sediment or pollutants
6. Location of BMPs that need maintenance
7. Location of BMPs that have failed
8. Location of additional BMPs needed
9. Corrective actions required

Notice Of Termination - Answers - Can be submitted if one of the following conditions
have been met:
1. Final stabilization has been achieved on all portions of site
2. Another operator has assumed control
3. Residential temporary stabilization in place and deed has been transferred to new
owner

Stop Work Order - Answers - Can be issued if:
Off site sedimentation resulting from non compliance
Work is being conducted without an approved SWPPP

Document information

Uploaded on
March 28, 2026
Number of pages
8
Written in
2025/2026
Type
Other
Person
Unknown
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA
3.8
(376)
Sold
2222
Followers
1450
Items
62796
Last sold
4 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions