• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 27 pages
Exam (elaborations)

Tennesse Residential Contractor – Real State Exam Questions & Verified Answers – Pass First Attempt Guaranteed – Instant Download- Newest 2026 Update!!!!!

Document preview thumbnail
Preview 3 out of 27 pages

TENNESSE RESIDENTIAL CONTRACTOR – REAL STATE EXAM QUESTIONS & VERIFIED ANSWERS – PASS FIRST ATTEMPT GUARANTEED – INSTANT DOWNLOAD- NEWEST 2026 UPDATE!!!!!

Content preview

The bucket's maximum capacity when the material is heaped above the edges of the bucket
is - ANSWER heaped



The contents of the bucket when it is filled to the level of the rim. No material is heaped
over the rims, is - ANSWER struck



Struck capacity is - ANSWER level



Heaped capacity is - ANSWER above the rim



How is a load factor calculated - ANSWER bank volume / bank volume + swell percentage



Co. vol. = - ANSWER L x W x D / 27



What is the advantage of a U-blade versus a Semi-U blade? - ANSWER holds more mate-
rial (40%)



What piece of equipment is a good choice if you have a wide trench with no crosslines? -
ANSWER Sheeps foot roller



The later the pipe diameter, the smaller the fall requirement is needed to maintain a water
velocity great enough to prevent - ANSWER solids from settling out



A ____________ stake is a small stake driven into the ground to identify a particular refer-
ence point. - ANSWER hubs



1

,If a reference stake is 20.2' from the Hub and fill is to be started at a distance of 12.4' from
the Hub, how are these distances measured? - ANSWER both horizontal



What percent slope rises at a 45 degree angle? - ANSWER 100%



Excavate _______ trenches around a tree deep enough to cut through the root system of the
tree. - ANSWER 4



________ is the easiest type of rock to rip. - ANSWER rippable sedimentary



The level of the groundwater is known as the ________. - ANSWER water table



Well points work well in ________ soils. - ANSWER course grain or sandy



How do you calculate time to excavate a set? - ANSWER Divide the volume of dirt in the
set by the dirt moved per cycle; multiply the number of digging cycles by the average cycle
time



When dirt is moved form its natural state, this is called ________ or loose condition. - AN-
SWER swell or spoils or loose volume



What is the purpose of a tench box? - ANSWER to support a wall of soil



The trench box must be centered over the pipe. To maintain safety, the maximum height
above the pipe to install the trench box is ________. - ANSWER 5' above pipe



________ is the best piece of equipment for working in mud or soft ground. - ANSWER
tract backhoe


2

, ________ is the method for testing soil density and does not require drilling. - ANSWER
nuclear density test



________ is the easiest compaction method. - ANSWER puddling or wetting the soil



Limited working room in excavations means ________. - ANSWER you can't easily use the
water necessary for wetting



To estimate earthwork, you need to ________. - ANSWER divide the area in sections



The term subgrade identifies ________. - ANSWER the surface elevation prior to placing
any surface material



The curving broken lines on a grading plan are ________ lines. - ANSWER contour



Widely spaced differing contour lines indicate ________ on a grading plan. - ANSWER
flatter area



Any self-loading scraper will be more productive in muddy soil when assisted by a ________.
- ANSWER dozer pushing on the push blocks at the rear of the bowl



What is the hardest part of grader's work? - ANSWER finish blading



What type of dozer is used for fine grading, trench backfilling, landscaping, light logging, and
swamp dozing? - ANSWER light utility dozer



If the operator fails to lift, tilt, and angle the blade just ________. - ANSWER most of the
load is lost


3

Document information

Uploaded on
March 28, 2026
Number of pages
27
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
THESTUDYVAULT
3.4
(20)
Sold
162
Followers
6
Items
14463
Last sold
1 day ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions