• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 19 pages
Exam (elaborations)

Septic Installer Study Questions With Complete Solutions

Document preview thumbnail
Preview 3 out of 19 pages

Septic Installer Study Questions With Complete Solutions

Content preview

Septic Installer Study Questions With Complete Solutions

_____________ are an acceptable means of sewage disposal for
a facility not served by water under pressure. Correct Answers
Pit Privies

A properly designed and installed system will adequately treat
and dispose of watstewater, and will ensure the protection of our
__________ resources for future generations. Correct Answers
drinking water

A properly installed septic tank must be placed on ___(1)___
earth, must be ___(2)___, and constructed to prevents ___(3)___
from entering the tank. Correct Answers 1) undisturbed
2) level
3) surface water

A subsurface drainage system should come no closer than
___(1)___ upgrade or ___(2)___ downgrade from an absorption
line. Correct Answers 10'
30'

Absorption field depths are determined by the ______ on the
property. Correct Answers soil conditions

Absorption field lengths are generally determined by the
___(1)___ in the home or the estimated ___(2)___ water usage
Correct Answers 1) number of bedrooms
2) gallon per day

Absorption Fields: Aggregate, or gravel

,The aggregate itself shall be ______ inches in diameter and pre-
washed. Correct Answers 1/2" - 2"

Aerobic Treatment:
Must be approved for use by the ________________. and must
meet testing criteria and perfomance by ANSI/NSF standard No.
40 for Residential Wastewater Treatment Systems and installed
by an _____________ of the manufacturer. Correct Answers
Department Technical Review Committee
authorized representative

After having completed the application process, a _________ is
conducted. Correct Answers site inspection

After receiving final approve, a system can then be ________.
Correct Answers back-filled

After the permit has been issues, any grading, filling or other
site modifications that would adversely affect the sewage system
may render the permit _____. Correct Answers VOID

Aggregate absorption lines and trench bottoms shall be
___(1)____, that is level for their entire length and installed to
run along the ___(2)___ of the land. Correct Answers 1) true to
grade
2) contour

Aggregate Fields:
__________ or equivalent shall be sued for horizontal and
vertical changes in direction or grade and to cross under
roadways or paved areas. Correct Answers Schedule 40 PVC

, Aggregate Fields:
A layer of pervious building ___(1)___ , ___(2)___, or similar
permeable material approved by the Departments technical
review committee shall be placed over the aggregate before back
filling. Correct Answers 1) paper
2) straw

Aggregate Fields:
A minimum of ___(1)___ to ___(2)___ of earth cover is
required over absorption lines. Correct Answers 1) 6"
2) 12"

Aggregate Fields:
Absorption trenches from conventional septic tanks must be
installed a minimum of ____ above any permanent or seasonal
groundwater table, rock, or other impervious soil layer. Correct
Answers 2'

Aggregate Fields:
Excavation for absorption trenches in soil other than sands
should not be conducted when ____, due to the potential
irreversible damage to soil structure, such as ___(2)___ and
___(3)___. Correct Answers 1) wet
2) compaction
3) smearing

Aggregate Fields:
On average ___(1)____ of gravel aggregate per ___(2)___ linear
feet of absorption field at a width of 36 inches will be needed to

Document information

Uploaded on
March 26, 2026
Number of pages
19
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$15.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Classroom
4.0
(1212)
Sold
5007
Followers
3246
Items
56710
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions