UST ICC Inspector
Exterior surface of the tank shall have: - answers-1. Engineering standard
2. normal diameter in ft
3. normal capacity in gal
4. degree of secondary containment
5. useable capacity in gal
6. design pressure in PSIG
7. max operating temperature in F
8. Construction materials
9. year manufactured
10. identity of manufacturer
Striker plates need to be: - answers-made of steel, minimum 1/8-inch thickness (drop-
tube fulfills requirement)
Laminated/coated/clay - answers-are considered single wall
how often is secondary containment tested - answers-36 months
how often is cathodic protection cert/impressed current cathodic tested - answers-6
months of install, 36 months after
how often does an owner have to inspect while in temporary closure - answers-3
months
when is an integrity test notification sent to local agency - answers-48 hours before test
how often is a single wall UST ATG .2gph test conducted - answers-monthly
how long does a UST owner have to correct a significant violation prior to red tag -
answers-7 business days
how often is single wall piping 3.0gph monitoring - answers-hourly, 10 PSI
how often is single wall suction piping 0.1gph - answers-3 hours, 40 PSI
How often is single wall gravity pipe 0.1 gph - answers-2 years 40 PSI
Exterior surface of the tank shall have: - answers-1. Engineering standard
2. normal diameter in ft
3. normal capacity in gal
4. degree of secondary containment
5. useable capacity in gal
6. design pressure in PSIG
7. max operating temperature in F
8. Construction materials
9. year manufactured
10. identity of manufacturer
Striker plates need to be: - answers-made of steel, minimum 1/8-inch thickness (drop-
tube fulfills requirement)
Laminated/coated/clay - answers-are considered single wall
how often is secondary containment tested - answers-36 months
how often is cathodic protection cert/impressed current cathodic tested - answers-6
months of install, 36 months after
how often does an owner have to inspect while in temporary closure - answers-3
months
when is an integrity test notification sent to local agency - answers-48 hours before test
how often is a single wall UST ATG .2gph test conducted - answers-monthly
how long does a UST owner have to correct a significant violation prior to red tag -
answers-7 business days
how often is single wall piping 3.0gph monitoring - answers-hourly, 10 PSI
how often is single wall suction piping 0.1gph - answers-3 hours, 40 PSI
How often is single wall gravity pipe 0.1 gph - answers-2 years 40 PSI