Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

RIGGING TEST QUESTIONS AND ANSWERS

Rating
-
Sold
-
Pages
6
Uploaded on
21-03-2026
Written in
2025/2026

RIGGING TEST QUESTIONS AND ANSWERS

Institution
NCCCO Rigger
Course
NCCCO Rigger

Content preview

RIGGING TEST QUESTIONS AND
ANSWERS
As many as are required per the lift plan - answer -how many persons may share a
dedicated channel for the purpose of coordinating operations?

Proximity alarms - answer -which of the following are set to give the operator sufficient
warning to prevent encroachment of power lines?

Effective, clear, and reliable - answer -when using electronic transmission devices, the
transmitted signal must be:

Blocks installed at contact points - answer -to ensure that correct sling angles are
maintained during choker hitch use, the sling may have:

Jaw and weldless eye - answer -a turnbuckle to be used in hoisting or rigging
operations should be of what type construction?

Turnbuckle - answer -the attached drawing illustrates a device for adjustment of load
and is termed a:

Operator - answer -a signal person must be provided when the point of operation,
meaning the load travel or the area near or at load placement is not in full view of the:

Dedicated spotter - answer -when the equipment is travelling and the view in the
direction of travel is obstructed, a ____________ must be provided

Notify the crane who the signal is for - answer -for each signal, prior to giving the
function/direction, the signal person must:

Signal person, operator, lift director - answer -when non-standard signals are used, the
following people must contact each other prior to the lift operation and agree upon the
non-standard signals which are going to be used:

Distance, function, direction - answer -which of the following are the three required
elements of a voice signal?

Find the center of gravity - answer -when lifting an object that is of irregular shape, you
must always:

The operator and signal person - answer -who is allowed to design a new signal
system?

, Site conditions preclude the use of hand, voice, or audio systems - answer -en an a new
signal system be used?

The operator, signal person, and lift director - answer -who determines if a new signal
system is suitable?

The new signal system is at least equally effective communication as the standard
system being replaced - answer -what must be demonstrated prior to the use of a new
signal system?

Tower - answer -some manufactures of carrier-mounted lattice boom cranes offer
optional _________ attachments for their machines

Bridge - answer -the ___________ is the main structural member of an over head crane
used to span the width of the runway area

Hoist - answer -any overhead crane consists of three basic units; the bridge, trolley,
and:

Crawler - answer -carrier-mounted lattice boom cranes are also commonly referred to
as __________ cranes.

Load hook - answer -the crane is said to be in a particular quadrant of operation when
the ______________ is located over that area

360 - answer -in addition to using flags and barricades to show the work zone near
power lines, the employer can define the work zone area ________ degrees around the
equipment up to the equipment's maximum working radius

Block - answer -two-blocking occurs when the ___________ or headache ball makes
contact with the sheaves at the boom tip

Low - answer -industrial cranes have _____________ centers of gravity to permit
operation in narrow aisles or runways without outriggers

Front - answer -high wind speed acting on the __________ of the boom can cause it to
topple backward if it is at a high boom angle

100% - answer -whenever anything is lifted or raised from a horizontal position to a
vertical position, the crane load will be equal to _________ the weight of the object until
the object is vertical and clears the ground

Radius - answer -as a crane starts to tip, the load _________ begins to increase. This
increases the load's leverage on the crane and the tipping force

Written for

Institution
NCCCO Rigger
Course
NCCCO Rigger

Document information

Uploaded on
March 21, 2026
Number of pages
6
Written in
2025/2026
Type
Exam (elaborations)
Contains
Unknown

Subjects

$18.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
biggdreamer Havard School
View profile
Follow You need to be logged in order to follow users or courses
Sold
274
Member since
2 year
Number of followers
67
Documents
18340
Last sold
1 day ago

4.0

43 reviews

5
24
4
7
3
6
2
2
1
4

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions