Question 1
Who can issue a stop work order?
Correct!
c.) building official
Question 2
Work that usually requires special inspection in the field but is instead performed off-site on the premises of a
Correct!
fabricator during fabrication...
c.) does not require special inspection if the fabricator is registered and approved
Question 3
All of the following should be on a daily report except...
Correct!
a.) astm standard for any testing performed.
Question 4
The final report shall be submitted...
Correct!
c.) at a point in time agreed upon by the owner and building official
, Question 5
Discrepancies or nonconforming items shall be brought to the immediate attention of the
Correct!
a.) contractor
Question 6
Who has the authority to enforce the special inspection provisions on a job?
Correct!
a.) contractor
Question 7
The type and extent of each special inspection and each test shall be located in...
Correct!
d.) the statement of special inspections
Question 8
contractor
Correct!
A person or company responsible for the construction of a building.
Question 9
building official
Correct!
An individual charged with the legal authority to review plans and specifications for code compliance.
, Question 10
approved inspection agency
Correct!
An organization authorized to conduct inspections and ensure compliance with building codes.
Question 11
registered design professional
Correct!
A qualified individual responsible for submitting revised plans to the building official for approval.
Question 12
special inspector
Correct!
A professional who checks in with the contractor upon arriving at the job site.
Question 13
preconstruction conference meeting
Correct!
A meeting aimed at reviewing the Special Inspection agreement and schedule requirements.
Question 14
final report
Correct!
A document submitted to the building department by the inspection agency or special inspector.
, Question 15
nonconformance inspection report
Correct!
A report that should include information about discrepancies but not the name of the project owner.
Question 16
approved agency
Correct!
An entity responsible for keeping records of special inspections and tests performed during construction.
Question 17
quality assurance
Correct!
Another name for special inspection.
Question 18
Engineer
Correct!
A professional employed by an owner to perform structural observations.
Question 19
Statement of Special Inspections
Correct!
A document prepared by the RDP in charge when special inspection is required.
380+ (Latest 2025-2026 Edition) 100% Verified Q&A + Answer Key Solutions
Question 1
Who can issue a stop work order?
Correct!
c.) building official
Question 2
Work that usually requires special inspection in the field but is instead performed off-site on the premises of a
Correct!
fabricator during fabrication...
c.) does not require special inspection if the fabricator is registered and approved
Question 3
All of the following should be on a daily report except...
Correct!
a.) astm standard for any testing performed.
Question 4
The final report shall be submitted...
Correct!
c.) at a point in time agreed upon by the owner and building official
, Question 5
Discrepancies or nonconforming items shall be brought to the immediate attention of the
Correct!
a.) contractor
Question 6
Who has the authority to enforce the special inspection provisions on a job?
Correct!
a.) contractor
Question 7
The type and extent of each special inspection and each test shall be located in...
Correct!
d.) the statement of special inspections
Question 8
contractor
Correct!
A person or company responsible for the construction of a building.
Question 9
building official
Correct!
An individual charged with the legal authority to review plans and specifications for code compliance.
, Question 10
approved inspection agency
Correct!
An organization authorized to conduct inspections and ensure compliance with building codes.
Question 11
registered design professional
Correct!
A qualified individual responsible for submitting revised plans to the building official for approval.
Question 12
special inspector
Correct!
A professional who checks in with the contractor upon arriving at the job site.
Question 13
preconstruction conference meeting
Correct!
A meeting aimed at reviewing the Special Inspection agreement and schedule requirements.
Question 14
final report
Correct!
A document submitted to the building department by the inspection agency or special inspector.
, Question 15
nonconformance inspection report
Correct!
A report that should include information about discrepancies but not the name of the project owner.
Question 16
approved agency
Correct!
An entity responsible for keeping records of special inspections and tests performed during construction.
Question 17
quality assurance
Correct!
Another name for special inspection.
Question 18
Engineer
Correct!
A professional employed by an owner to perform structural observations.
Question 19
Statement of Special Inspections
Correct!
A document prepared by the RDP in charge when special inspection is required.