In which type of project can the owner solicit bids from whomever they want?
Performance
Public
Private
Low Bid - Answers Private
Why is the use of Private Public Partnerships (P3) increasing?
Because they maintain a high level of public control
Because they are cost effective
Because they provide an effective tool in meeting public needs
All of these - Answers All of these
Who determines whether cost, qualifications, or both is used to select a contractor?
Architect
Inspector
Contractor
Owner - Answers Owner
Which selection method requires that the construction documents be 100% complete?
Qualifications Based
Low Bid
Best Value
Design Build - Answers Low Bid
Which of the following is not an advantage for the owner to bringing the construction management
team in early in the process?
the contractor can provide insight into the constructability of potential designs
the contractor can make suggestions about how to save money on the project
the contractor can provide realistic information about how much things will cost
the contractor can guarantee the total cost of the project at the beginning of the design - Answers
the contractor can guarantee the total cost of the project at the beginning of the design
The General Conditions are typically found in which part of the contract documents?
Project Manual
Architectural Drawings
Technical Specifications
Bidding Documents - Answers Project Manual
Which part of the contract identifies the parties, describes their roles, and sets out their basic duties
and responsibilities on the project?
Technical Specifications
Bidding Documents
Architectural Drawings
General Conditions - Answers General Conditions
Which of the following best describes the term CSI MasterFormat?
A system for organizing and communicating design data and information on construction projects
that makes it easier to manage, estimate, and track construction costs.
The institute that serves all of the major disciplines involved in the building design and construction
industry.
The section of the contract that outlines the responsibilities of each of the parties and clearly
delineates the terms of the contract.
The system that outlines the bidding process and outlines the procedures for submitting bids. -
Answers A system for organizing and communicating design data and information on construction
projects that makes it easier to manage, estimate, and track construction costs.
In which type of contract is the contractor most likely to be responsible for cost overruns if the project
is overbudget?
Cost Plus
Agency CM
Lump Sum
Unit Price - Answers Lump Sum