CM 102 EXAM QUESTIONS ANSWERED CORRECTLY LATEST UPDATE 2026 base isolators - Answers large shock absorbers made of alternating layers of rubber and steel attached to a building's foundation; allows movement of the structure without causing damage brownfield sites - Answers a property that is abandoned or underused because of historic environmental contamination constructability review - Answers a design review process in which experienced contractors and construction managers work with designers to ensure that the details of the design can actually be built in an efficient and cost-effective manner cofferdams - Answers temporary watertight enclosures erected to prevent water from seeping into an area; allowing construction to take place in the water-free space curtain wall - Answers an exterior cladding system that is supported entirely by the frame of the building, rather than being self-supporting or load-bearing infrastructure - Answers the basic roadways, bridges, and railroad networks that support a community or society lean principles - Answers focus on creating more value for customers with less work and the elimination of waste; concept comes from the Toyota Production System program - Answers a written statement that identifies and describes an owner or end user's needs and requirements for a facility; every design starts with one project delivery - Answers a comprehensive process by which a building, facility, or structure is designed and constructed self-performed work - Answers construction work that is performed with the general contractor's own forces or labor; this is work that is not subcontracted slip forms - Answers concrete forms that rise up the wall as construction progresses specifications - Answers written instructions from an architect or engineer accompanying the project plans pertaining to the quality of materials and workmanship required for the project What is the name of the stone carvings dating back to the pyramids that contained the first written regulations pertaining to construction, commonly referred to as the first known building code? - Answers Code of Hammurabi By what specific measurement is construction used as an economic indicator for the U.S. economy? - Answers housing starts What are the five primary sectors of the construction industry? - Answers 1) Residential construction 2) Commercial construction 3) Heavy civil construction 4) Industrial construction 5) Environmental construction What is the name of the organization credited with promoting construction management as a legitimate and unique area of study at four-year universities? - Answers Associated Schools of Construction (ASC) What is the role of the owner on a construction project? - Answers Develop a program, determine the scope of work, create the budget, and provide funding What is the name of the weekly magazine dedicated solely to the construction industry? - Answers Engineering News Record Name three associations affiliated with the construction industry? - Answers The Design-Build Institute of America, The National Association of Home Builders (NAHB), and The Construction Management Association of America (CMAA) What does LEED stand for, and what is its purpose? - Answers Leadership on Energy and Environmental Design; it evaluates environmental performance form a "whole building" perspective over a building's life cycle What two construction associations offer voluntary certification programs for construction managers? - Answers The American Institute of Constructors (AIC) and The Construction Management Association of America scope of work - Answers the parameters defining the overall extent of work to be included ina construction contract architectural prgamming - Answers the research and decision-making process, initiated by an owner, that identifies the basic needs of the client and parameters of the project design-bid-build - Answers a project delivery method in which the owner holds two separate contracts for design and construction construction management - Answers the planning, scheduling, evaluation, and controlling of construction tasks and activities to accomplish specific objectives outlined in the contract documents agency CM - Answers a construction management option in which the construction manager acts in the owner's best interest at every stage of the project from design through construction; offers advice and project management services to the owner, but is not financially responsible for the construction multiple prime - Answers a contracting methodology in which the owner bypasses the use of a general contractor and enters into multiple separate contracts with trade and specialty contractors; sub-contracting at-risk CM - Answers a project delivery method where the construction manager acts as a consultant to the owner in the development and design phases but as the equivalent of a GC during the construction phase value engineering - Answers a process in which various alternative approaches are evaluated and considered regarding design, product selection, or building system design-build - Answers a project delivery in which there is only one contract between the owner and a design-build entity fast tracking - Answers a practice utilized to speed up a job by overlapping the design phase and the construction phase of a project; often applied in design-build integrated project delivery - Answers any project delivery method that contractually engages the contractor responsible for constructing the project at the beginning of the design process; ex. design-build and at-risk CM What is the difference between function and project delivery? - Answers Function is the actual building of a project and project delivery is the construction management Name the six factors controlling the construction project - Answers cost, time, quality, safety, scope, and function Why is scope so important in the construction process? - Answers it is the contracted plans and means of the project including CD's and specs. A well-written scope, more than anything will help reduce risks for all parties involved What are the three primary project delivery methods? - Answers design-bid-build, design build, and construction management What three ways can a design-build entity configured? - Answers 1) Designer and contractor partnership 2) Full-service design-build firm 3) Joint venture What are the 8 functions of construction management? - Answers 1) estimating the project 2) administrating the contract 3) managing job site and construction operations 4) planning and scheduling the project 5) monitoring project performance 6) managing project quality 7) managing project safety 8) assessing project risks open bid - Answers a competitive bidding requirement for all public projects; it is advertised publicly and allows any qualified contractor to submit a bid on the project prequalification - Answers the process in which an owner determines a construction firm is fundamentally qualified to compete for certain projects invitation for bids - Answers a notification sent to a selected list of contractors, furnishing information on the submission of bids on a private project closed bid - Answers used with private projects and is not open to the public; bidding is by invitation public-private partnership - Answers a business venture approach whereby a public sector authority and a private enterprise join forces and combine resources to deliver government projects aimed at serving the public good advertisement for bids - Answers a public notice, usually published in newspapers, trade magazines, and journals, providing information regarding procedures for public projects request for proposals - Answers a solicitation document, written by the owner, requesting pricing and a technical solution for design and/or construction services

Content preview

CM 102 EXAM QUESTIONS ANSWERED CORRECTLY LATEST UPDATE 2026

base isolators - Answers large shock absorbers made of alternating layers of rubber and steel
attached to a building's foundation; allows movement of the structure without causing damage
brownfield sites - Answers a property that is abandoned or underused because of historic
environmental contamination
constructability review - Answers a design review process in which experienced contractors and
construction managers work with designers to ensure that the details of the design can actually be
built in an efficient and cost-effective manner
cofferdams - Answers temporary watertight enclosures erected to prevent water from seeping into
an area; allowing construction to take place in the water-free space
curtain wall - Answers an exterior cladding system that is supported entirely by the frame of the
building, rather than being self-supporting or load-bearing
infrastructure - Answers the basic roadways, bridges, and railroad networks that support a
community or society
lean principles - Answers focus on creating more value for customers with less work and the
elimination of waste; concept comes from the Toyota Production System
program - Answers a written statement that identifies and describes an owner or end user's needs
and requirements for a facility; every design starts with one
project delivery - Answers a comprehensive process by which a building, facility, or structure is
designed and constructed
self-performed work - Answers construction work that is performed with the general contractor's
own forces or labor; this is work that is not subcontracted
slip forms - Answers concrete forms that rise up the wall as construction progresses
specifications - Answers written instructions from an architect or engineer accompanying the project
plans pertaining to the quality of materials and workmanship required for the project
What is the name of the stone carvings dating back to the pyramids that contained the first written
regulations pertaining to construction, commonly referred to as the first known building code? -
Answers Code of Hammurabi
By what specific measurement is construction used as an economic indicator for the U.S. economy? -
Answers housing starts
What are the five primary sectors of the construction industry? - Answers 1) Residential construction
2) Commercial construction
3) Heavy civil construction
4) Industrial construction
5) Environmental construction
What is the name of the organization credited with promoting construction management as a
legitimate and unique area of study at four-year universities? - Answers Associated Schools of
Construction (ASC)
What is the role of the owner on a construction project? - Answers Develop a program, determine
the scope of work, create the budget, and provide funding
What is the name of the weekly magazine dedicated solely to the construction industry? - Answers
Engineering News Record
Name three associations affiliated with the construction industry? - Answers The Design-Build
Institute of America, The National Association of Home Builders (NAHB), and The Construction
Management Association of America (CMAA)
What does LEED stand for, and what is its purpose? - Answers Leadership on Energy and
Environmental Design; it evaluates environmental performance form a "whole building" perspective
over a building's life cycle
What two construction associations offer voluntary certification programs for construction managers?
- Answers The American Institute of Constructors (AIC) and The Construction Management
Association of America
scope of work - Answers the parameters defining the overall extent of work to be included ina
construction contract
architectural prgamming - Answers the research and decision-making process, initiated by an owner,
that identifies the basic needs of the client and parameters of the project

Document information

Uploaded on
March 20, 2026
Number of pages
4
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$11.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TutorJosh
3.4
(74)
Sold
481
Followers
16
Items
32589
Last sold
3 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions