SOS Exam Questions with All Correct & 100% Verified
Answers |Latest Version |Already Graded A+
1. An event reporting form must be submitted
24 hours
for a sys- tem disturbance that meets NERC
criteria for reporting and must be completed
with in
2. The power flow tool provides the system operator with Take
snapshot of system,
the ability to do which of the adjust system model, run
following AC on Study
3. If State Estimator fails to solve, what should the system Call EMS
Support person-
operator take nel to get SE running
4. what is the relationship between the Study Power Flow Contingency
Analysis can
program and Contingency be run on the results of
Analysis? Study Power Flow
5. If your system is experiencing high system loads, high an internal
generator trip
system imports, and transmission facilities
loaded to 100%, which of the following
situations would make the situation worse
6. which of the following best describes the SE runs first and then
sequence of State Estimator and Contingency CA runs suing the
Analysis results of SE
7. Which of the following statements is ture CA uses the results of
about the SE to
relationship between State Estimator and Contingency solve
Analysis
, SOS Exam Questions with All Correct & 100% Verified
Answers |Latest Version |Already Graded A+
8. A transformer has a .8 or 80% power factor 150 MW
and has 150 MW flowing out on its high side.
How many MWs are flowing into the low side?
a. 187.5 MW
b. 150 MW
, SOS Exam Questions with All Correct & 100% Verified
Answers |Latest Version |Already Graded A+
c. 120 MW
d. 37.5 MW
9. Your frequency bias is -100 MW / .1Hz. System c. 50
fre- quency is 59.95. How much is your balancing
authority contributing to the Interconnection.
a. 100 MW
c. 50 MW
b. 75 MW
d. 30 MW
10. A fault has occurred in your power system. d. A condition of
What will the System Operator look for? abnor- mal electric
current which causes
a. A condition where a component is not in protective relays to
sync with the rest of the system operate
b. A condition that causes a device,
component, or element to fail
c. A condition of abnormal electric current
d.A condition of abnormal electric current
which caus- es protective relays to operate
11. What makes up spinning reserves?
a. Generators
a. Generators
b. Synchronous condensers
c. Capacitors
Answers |Latest Version |Already Graded A+
1. An event reporting form must be submitted
24 hours
for a sys- tem disturbance that meets NERC
criteria for reporting and must be completed
with in
2. The power flow tool provides the system operator with Take
snapshot of system,
the ability to do which of the adjust system model, run
following AC on Study
3. If State Estimator fails to solve, what should the system Call EMS
Support person-
operator take nel to get SE running
4. what is the relationship between the Study Power Flow Contingency
Analysis can
program and Contingency be run on the results of
Analysis? Study Power Flow
5. If your system is experiencing high system loads, high an internal
generator trip
system imports, and transmission facilities
loaded to 100%, which of the following
situations would make the situation worse
6. which of the following best describes the SE runs first and then
sequence of State Estimator and Contingency CA runs suing the
Analysis results of SE
7. Which of the following statements is ture CA uses the results of
about the SE to
relationship between State Estimator and Contingency solve
Analysis
, SOS Exam Questions with All Correct & 100% Verified
Answers |Latest Version |Already Graded A+
8. A transformer has a .8 or 80% power factor 150 MW
and has 150 MW flowing out on its high side.
How many MWs are flowing into the low side?
a. 187.5 MW
b. 150 MW
, SOS Exam Questions with All Correct & 100% Verified
Answers |Latest Version |Already Graded A+
c. 120 MW
d. 37.5 MW
9. Your frequency bias is -100 MW / .1Hz. System c. 50
fre- quency is 59.95. How much is your balancing
authority contributing to the Interconnection.
a. 100 MW
c. 50 MW
b. 75 MW
d. 30 MW
10. A fault has occurred in your power system. d. A condition of
What will the System Operator look for? abnor- mal electric
current which causes
a. A condition where a component is not in protective relays to
sync with the rest of the system operate
b. A condition that causes a device,
component, or element to fail
c. A condition of abnormal electric current
d.A condition of abnormal electric current
which caus- es protective relays to operate
11. What makes up spinning reserves?
a. Generators
a. Generators
b. Synchronous condensers
c. Capacitors