CERTIFIED CONSTRUCTION
MANAGER STUDY SET




Construction-Management---ans-✔✔The-practice-of-professional-management-applied-
to-the-planing,-design,-and-construction-of-projects,-from-inception-to-completion,-for-the-
purpose-of-controlling-time,-cost,-and-quality

Construction-Contract-Administration-Objectives---ans-✔✔To-control:-time,-cost,-quality,-
information-flow-and-to-satisfy-the-Owner's-goals-and-objectives-for-the-project

Design-Bid-Build-Advantages---ans-✔✔Widely-applicable,-understandable,-owner-
retains-control,-owner-"knows"-the-cost-prior-to-the-start-of-Construction

Design-Bid-Build-Disadvantages---ans-✔✔Relatively-slow,-owner-is-liable-for-the-design,-
constructability-issues,-adversarial-relationships-fostered

Multiple-Prime-Advantages---ans-✔✔Increased-Owner-control,-work-easily-fast-tracked,-
save-general-contractor-markups,-some-states-require-it

Multiple-Prime-Disadvantages---ans-✔✔Owner-has-risk-of-controlling-time-and-
coordination,-multiple-accountability-for-performance,-unknown-"final"-cost-at-
construction-start,-same-owner-risks-as-traditional-approach

CM-at-Risk-Advantags---ans-✔✔Well-suited-for-fast-tracking,-contractor-(and-
subcontractor)-input-on-design-alternatives,-better-cost-info,-permits-"picking"-of-the-
builder

CM-at-Risk-Disadvantages---ans-✔✔Change-of-CM's-accountability-after,-GMP-
(guaranteed-maximum-price)-is-signed,-tempted-to-sign-GMP-"too-soon",-variations-in-
procurement-methods

Design-Build-Advantages---ans-✔✔Accountability-for-project-delivery,-reduced-disputes,-
can-cut-time-and-cost,-builder-can-have-input-to-design/constructabibility,-budget-
established-early-on

, Design-Build-Disadvantages---ans-✔✔Early-definition-of-the-program-required,-owner's-
loss-of-control-during-design,-potential-for-quality-to-be-compromised

What-is-True-concerning-delivery-methods?---ans-✔✔delivery-methods-are-the-forms-of-
organizing-the-construction-project,-all-delivery-methods-have-dissimilar-risks

What-delivery-method-can-reduce-and-cut-time-the-most-when-compared-to-other-
methods?---ans-✔✔Design-Build

What-delivery-method-allows-the-contractor(s)-to-provide-input-on-design-alternatives?---
ans-✔✔CM-at-Risk-and-Design-Build

With-this-delivery-method,-the-owner-holds-contracts-with-the-designer-and-several-
contractors.-The-CM-assists-in-scheduling-the-contractors.---ans-✔✔Multiple-Prime

Price-Competitively-Bid-Contract-Advantages---ans-✔✔Well-known,-competitive,-fair-
and-transparent,-produces-"lowest"-price,-contractor-assumes-risk-for-completion

Price-Competitively-Bid-Contract-Disadvantages---ans-✔✔No-consideration-of-any-
qualification-except-price,-work-must-be-well-specified

Negotiated-Price-Contract-Advantages---ans-✔✔Best-value-selection,-freedom-to-pick-
subcontractors,-easier-choice-of-alternatives,-opportunity-NOT-to-pay-for-design-errors

Negotiated-Price-Contract-Disadvantages---ans-✔✔Potential-abuse,-may-not-be-legal,-
requires-expertise-on-the-part-of-the-owner-(or-their-consultants)

When-is-a-reimbursable-contract-most-appropriate-and-best-suitable?-(Fixed-vs.-
Reimbursable)---ans-✔✔Unknown-quantities-of-work,-risky-work,-work-that-is-impossible-
to-define

General-Contractor-Reimbursement-Methods---ans-✔✔Lump-sum,-GMP-(Guaranteed-
Maximum-Price),-Unit-Price,-Cost-Plus-a-Fixed-Fee,-Time-and-Materials

What-are-the-four-main-delivery-Contract-Methods?---ans-✔✔Design-Bid-Build-
(Traditional-Method),-Multiple-Prime,-CM-at-Risk,-Design-Build

What-constitutes-the-contract-documents?---ans-✔✔The-agreement,-drawings,-
specifications,-addenda-(changes-issued-prior-to-the-bid),-modifications-(changes-issued-
after-the-bid),-any-documents-incorporated-by-reference

Typical-Project-Contract-Documents---ans-✔✔Standard-Forms:-AIA,-CMAA,-Others;-
Customized-forms:-county-government;-combination-of-both

Standard-Form-Contracts-Advantages---ans-✔✔Increase-the-predictability-of-project-
outcomes,-increase-the-consistency-of-pricing,-simplify-management,-regularly-updated.-

Document information

Uploaded on
March 18, 2026
Number of pages
7
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
favouredone
4.4
(351)
Sold
394
Followers
36
Items
10254
Last sold
1 week ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions