The duties of a special inspector do not include ✔Correct Answer-Issuing stop work notices
When reporting non-conforming items, all of the following items must be in the report ✔Correct
Answer-1. Name and title of each individual notified
2. Reference to applicable detail of approved plans, job specifications or code
3. Resolution or corrective action taken
Depending on the jurisdiction, the special inspector is required to send their final report to the
building official and ✔Correct Answer-The design professional in responsible charge
When the special inspector arrives on-site, they should notify the ✔Correct Answer-Contractor
The _____________ issues final acceptance of a building. ✔Correct Answer-Building official
Special inspection reports should contain all of the following elements: ✔Correct Answer-1.
Location and details of reinforcement inspections
2. Names of individuals notified on-site regarding areas of work
3. Changes authorized by the design professional in responsible charge
The ___________ is responsible for approving the special inspection program ✔Correct Answer-
Building official
Some of the responsibilities of the special inspection agency are: ✔Correct Answer-1. Review
approved plans and specifications
2. Write daily reports
3. Report non-conforming items
Who does the special inspector notify first if there is a non-conforming item? ✔Correct Answer-
The contractor
How often does the special inspector submit reports to the building official? ✔Correct Answer-As
determined by the building official
Who establishes the special inspection program? ✔Correct Answer-Building Department
Where are the required special inspections for a project found? ✔Correct Answer-Statement of
special inspections
What is the first duty of a special inspector after arriving on the job site? ✔Correct Answer-Check
in with the contractor
Who submits the statement of responsibility? ✔Correct Answer-The contractor
If the special inspector observes a non-conformance that is about to be covered up, he or she should
______ and _______: ✔Correct Answer-Notify the contractor, then the building official and
registered design professional
Correct & 100% Verified Answers |Guaranteed to Pass
The duties of a special inspector do not include ✔Correct Answer-Issuing stop work notices
When reporting non-conforming items, all of the following items must be in the report ✔Correct
Answer-1. Name and title of each individual notified
2. Reference to applicable detail of approved plans, job specifications or code
3. Resolution or corrective action taken
Depending on the jurisdiction, the special inspector is required to send their final report to the
building official and ✔Correct Answer-The design professional in responsible charge
When the special inspector arrives on-site, they should notify the ✔Correct Answer-Contractor
The _____________ issues final acceptance of a building. ✔Correct Answer-Building official
Special inspection reports should contain all of the following elements: ✔Correct Answer-1.
Location and details of reinforcement inspections
2. Names of individuals notified on-site regarding areas of work
3. Changes authorized by the design professional in responsible charge
The ___________ is responsible for approving the special inspection program ✔Correct Answer-
Building official
Some of the responsibilities of the special inspection agency are: ✔Correct Answer-1. Review
approved plans and specifications
2. Write daily reports
3. Report non-conforming items
Who does the special inspector notify first if there is a non-conforming item? ✔Correct Answer-
The contractor
How often does the special inspector submit reports to the building official? ✔Correct Answer-As
determined by the building official
Who establishes the special inspection program? ✔Correct Answer-Building Department
Where are the required special inspections for a project found? ✔Correct Answer-Statement of
special inspections
What is the first duty of a special inspector after arriving on the job site? ✔Correct Answer-Check
in with the contractor
Who submits the statement of responsibility? ✔Correct Answer-The contractor
If the special inspector observes a non-conformance that is about to be covered up, he or she should
______ and _______: ✔Correct Answer-Notify the contractor, then the building official and
registered design professional