ISA UTILITY SPECIALIST (CH. 2 PROGRAM & PERSONNEL MANAGEMENT) EXAM QUESTIONS ANSWERED CORRECTLY LATEST UPDATE 2026 ISA BMPs provide a practical guide for implementing __________ __________. - Answers industry standards NERC standards are specific to what line voltages? - Answers 200 kV & above NERC standards require the reporting of all tree caused outages by __________ categories - Answers three Trees growing into contact with a single-phase distribution conductor pose __________ threat of a tree-ground fault. - Answers little Clearing for a new distribution line is likely to be paid for by a __________ budget. - Answers capital A grid-based scheduling system is most likely to be used by highly __________ utilities. - Answers urbanized A challenge with grid-based scheduling is that circuits may traverse many grids, allowing for a variety of __________ __________. - Answers tree conditions The most expensive way to schedule work is: - Answers hotspotting A contractor is paid for each tree pruned or removed when contracted using a __________ __________ contract. - Answers unit price Communication between vegetation managers, contractors, supervisors, & workers should be both __________ & __________. - Answers written & verbal Long-term planning is __________, while short-term planning is __________. - Answers strategic; tactical __________ are documents that describe, instruct, & direct work results. - Answers specifications Research has shown that trees are more likely to cause outages on __________-phase lines than on __________-phase lines. - Answers three; single A results-based strategy designed to target trees as close as possible to the time that they interfere with facilities is known as __________-__________-__________ management. - Answers just-in-time A __________ __________ structure is a prioritized outline of job components that must be completed for a successful project outcome. - Answers work breakdown For most utilities, vegetation management departments are considered __________ __________ that do not generate income. - Answers cost centers Purchases of equipment or line construction are considered __________ expenses, whereas supply or salaries are considered __________ expenses. - Answers capital; operating Time & material contracts are generally __________ risk factors for contractors & __________ risk for utilities. - Answers low; high __________ __________ contracts are gaining popularity because the responsibility for productivity, work planning, & scheduling rests with the contractor. - Answers unit price Depreciation can be either __________-__________, in which costs are spread out over a lifetime of an item, or __________, in which the amount of depreciation taken is higher immediately after the purchase of an item. - Answers straight-line; accelerated True or False? All of the following are approaches to work planning: - Cycle-based - Results-based - Crisis management - Answers true SWOT analysis is a strategic planning tool & an acronym, meaning: - Answers Strengths, Weaknesses, Opportunities, Threats Relative to the cost of routine maintenance, reactive maintenance can cost __________ times as much. - Answers five What are the three parts to the constraint triangle? - Answers time, cost, & scope With respect to personnel management, what is the most common reason that people leave jobs? - Answers treatment from supervisors Type of preventative maintenance that uses field data to diagnose & monitor a condition or system. - Answers predictive maintenance (aka on-condition maintenance) Governments sometimes mandate clearance distances, maintenance intervals, inspection intervals, or require available resources to be focused on: - Answers the worst-performing circuits (in terms of VM) Utility pruning should be performed at intervals that minimize the need for __________ responses, but not so frequently that costs exceed benefits. - Answers reactive It's more effective to base maintenance cycles on __________ __________ rather than fixed distances. - Answers growth rates Process where trees growing significantly faster than most other trees are pruned at approximately half the scheduled maintenance cycle length: - Answers mid-cycle pruning Crisis management is an indicator of chronic __________. - Answers underfunding Completing all necessary line clearance on a feeder or circuit basis: - Answers circuit work A concept in project management that shows the interrelation of the resources of time, cost, & scope; often depicted by the constraint triangle: - Answers triple constraint Project management stratification of the entire scope of work need to accomplish a project's objectives: - Answers work breakdown structure In project management, the longest period of time a series of tasks requires from project beginning to end: - Answers critical path Relationships that indicate when tasks in the work breakdown structure begin & end: - Answers dependencies Three types of dependencies: - Answers mandatory, discretionary, & external Which type of dependency is one in which one task cannot begin until another activity has ended? - Answers mandatory dependency Which type of dependency is developed my managers to meet a specific objective? - Answers discretionary dependency Which type of dependency is a relationship between a task under the direction of a project management team & an action outside of their control? - Answers external dependency __________ __________ are scheduling tools that provide a visual means of tracking a project. - Answers Gantt charts Expenditures that do not generate income: - Answers cost center Expenditures that generate revenue: - Answers profit center

Content preview

ISA UTILITY SPECIALIST (CH. 2 PROGRAM & PERSONNEL MANAGEMENT) EXAM QUESTIONS
ANSWERED CORRECTLY LATEST UPDATE 2026

ISA BMPs provide a practical guide for implementing __________ __________. - Answers industry
standards
NERC standards are specific to what line voltages? - Answers 200 kV & above
NERC standards require the reporting of all tree caused outages by __________ categories - Answers
three
Trees growing into contact with a single-phase distribution conductor pose __________ threat of a
tree-ground fault. - Answers little
Clearing for a new distribution line is likely to be paid for by a __________ budget. - Answers capital
A grid-based scheduling system is most likely to be used by highly __________ utilities. - Answers
urbanized
A challenge with grid-based scheduling is that circuits may traverse many grids, allowing for a variety
of __________ __________. - Answers tree conditions
The most expensive way to schedule work is: - Answers hotspotting
A contractor is paid for each tree pruned or removed when contracted using a __________
__________ contract. - Answers unit price
Communication between vegetation managers, contractors, supervisors, & workers should be both
__________ & __________. - Answers written & verbal
Long-term planning is __________, while short-term planning is __________. - Answers strategic;
tactical
__________ are documents that describe, instruct, & direct work results. - Answers specifications
Research has shown that trees are more likely to cause outages on __________-phase lines than on
__________-phase lines. - Answers three;
single
A results-based strategy designed to target trees as close as possible to the time that they interfere
with facilities is known as __________-__________-__________ management. - Answers just-in-time
A __________ __________ structure is a prioritized outline of job components that must be
completed for a successful project outcome. - Answers work breakdown
For most utilities, vegetation management departments are considered __________ __________ that
do not generate income. - Answers cost centers
Purchases of equipment or line construction are considered __________ expenses, whereas supply or
salaries are considered __________ expenses. - Answers capital;
operating
Time & material contracts are generally __________ risk factors for contractors & __________ risk for
utilities. - Answers low;
high
__________ __________ contracts are gaining popularity because the responsibility for productivity,
work planning, & scheduling rests with the contractor. - Answers unit price
Depreciation can be either __________-__________, in which costs are spread out over a lifetime of
an item, or __________, in which the amount of depreciation taken is higher immediately after the
purchase of an item. - Answers straight-line;
accelerated
True or False?
All of the following are approaches to work planning:
- Cycle-based
- Results-based
- Crisis management - Answers true
SWOT analysis is a strategic planning tool & an acronym, meaning: - Answers Strengths, Weaknesses,
Opportunities, Threats
Relative to the cost of routine maintenance, reactive maintenance can cost __________ times as
much. - Answers five
What are the three parts to the constraint triangle? - Answers time, cost, & scope
With respect to personnel management, what is the most common reason that people leave jobs? -
Answers treatment from supervisors

Document information

Uploaded on
March 10, 2026
Number of pages
3
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$11.89

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
joshuawesonga22
3.5
(14)
Sold
142
Followers
2
Items
15749
Last sold
2 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions