• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 27 pages
Exam (elaborations)

Certified Construction Manager (CCM) Practice Examination Newest 2025 – 2026 Questions From Past Papers Actual Exams Complete 100 Questions And Correct Detailed Answers (Verified Answers) |Already Graded A+||Brand New!!

Document preview thumbnail
Preview 3 out of 27 pages

Certified Construction Manager (CCM) Practice Examination Newest 2025 – 2026 Questions From Past Papers Actual Exams Complete 100 Questions And Correct Detailed Answers (Verified Answers) |Already Graded A+||Brand New!!

Content preview

Certified Construction Manager (CCM) Practice
Examination Newest 2025 – 2026 Questions From
Past Papers Actual Exams Complete 100 Questions
And Correct Detailed Answers (Verified Answers)
|Already Graded A+||Brand New!!
Content covered (most frequently tested): project
management principles, cost management and estimating,
scheduling and CPM, contract administration, construction law
and procurement, risk management, quality management,
safety management, project delivery methods, professional
practice and ethics


1. In construction project management, the primary responsibility of a
Construction Manager is to:
A. Perform all trade work on site
B. Manage project scope, schedule, cost, and quality
C. Supply construction materials
D. Act as the building owner
Correct Answer: B. Manage project scope, schedule, cost, and quality
Explanation: The Construction Manager coordinates all aspects of project delivery
including schedule, budget, scope, quality, and communication between
stakeholders.
2. Which project delivery method involves a single entity responsible for both
design and construction?
A. Design–Bid–Build
B. Construction Management at Risk

, C. Design–Build
D. Integrated Project Delivery
Correct Answer: C. Design–Build
Explanation: In design–build, one entity provides both design and construction
services, improving coordination and potentially reducing project duration.
3. The critical path in a CPM schedule represents:
A. The shortest path through the project
B. Activities with the most labor
C. Activities with zero total float
D. The least expensive activities
Correct Answer: C. Activities with zero total float
Explanation: The critical path consists of activities that determine project
duration; delays to these activities delay the entire project.
4. Float in a CPM schedule is defined as:
A. The total labor hours available
B. Time an activity can be delayed without delaying the project
C. Time spent on procurement
D. Time required for inspections
Correct Answer: B. Time an activity can be delayed without delaying the project
Explanation: Float (or slack) indicates scheduling flexibility for non-critical
activities.
5. A Guaranteed Maximum Price (GMP) contract is most commonly associated
with:
A. Lump sum delivery
B. Construction Management at Risk
C. Design–Bid–Build
D. Public procurement only
Correct Answer: B. Construction Management at Risk
Explanation: In CM at Risk, the CM commits to delivering the project within a
guaranteed maximum price.

, 6. Which document defines the technical requirements of construction work?
A. Contract agreement
B. Specifications
C. Bid form
D. Change order
Correct Answer: B. Specifications
Explanation: Specifications provide detailed descriptions of materials,
workmanship, and performance requirements.
7. A Request for Information (RFI) is used primarily to:
A. Request payment
B. Clarify contract documents
C. Hire subcontractors
D. Replace specifications
Correct Answer: B. Clarify contract documents
Explanation: RFIs are used by contractors to obtain clarification when drawings or
specifications are unclear.
8. Earned Value Management (EVM) integrates which three project
performance measures?
A. Scope, procurement, safety
B. Cost, schedule, scope
C. Safety, quality, procurement
D. Materials, labor, equipment
Correct Answer: B. Cost, schedule, scope
Explanation: EVM evaluates project performance by comparing planned value,
earned value, and actual cost.
9. The document that formally authorizes project work is the:
A. Contract specification
B. Project charter
C. Work order
D. Procurement plan

Document information

Uploaded on
March 9, 2026
Number of pages
27
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$18.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
elitemindsA
3.9
(15)
Sold
67
Followers
3
Items
4454
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions