• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 43 pages
Exam (elaborations)

ACI Concrete Field Testing Technician- Grade I Version 1 Actual Exam Newest 2026/2027 With Complete Questions And Correct Detailed Answers| Latest Update!!

Document preview thumbnail
Preview 4 out of 43 pages

ACI Concrete Field Testing Technician- Grade I Version 1 Actual Exam Newest 2026/2027 With Complete Questions And Correct Detailed Answers| Latest Update!!

Content preview

ACI Concrete Field Testing Technician- Grade I

Version 1 Actual Exam Newest 2026/2027 With

Complete Questions And Correct Detailed Answers|

Latest Update!!

The sensor of the temperature measuring device shall be

submerged a minimum of _____ in. [_____mm] into the

freshly mixed concrete. - ANSWER-3 in. [75 mm]




In rodding the sample, how deep should the rod penetrate

each layer? - ANSWER-Rod bottom layer to full depth; rod

second and final layer penetrating the previous layer about

25 mm (1 in.)




After rodding each layer, what should be done to the

measure before adding another layer of concrete? -

,ANSWER-Tap the sides of the measure smartly 10 to 15

times with the mallet




When consolidating the concrete by vibration, how many

times should the vibrator be inserted into each layer? -

ANSWER-Three (3)




What tools may be used to strike off the top surface of the

concrete following consolidation of the final layer? -

ANSWER-A strike-off bar; a metal, glass, or acrylic plate




What must be done if there is a slight deficiency in the

quantity of concrete in the measure of consolidation of

,final layer? - ANSWER-Add a quantity of representative

concrete before strike off




What must be done if there is an excessive amount of

concrete in measure following consolidation of the final

layer? - ANSWER-Remove a representative quantity of

concrete with the scoop or trowel before the strike off




The volumetric method of determining air content of

concrete can be used on concrete containing what types

of aggregate? - ANSWER-All types of aggregate




What are the requirements for the tamping rod used in the

test method? - ANSWER-Round, straight 5/8 [16 mm] +-

, 1/16 in. [2 mm] diameter rod at least 5 in. [300 mm]

greater in length than the depth of the bowl being used,

with the tamping end rounded to a hemispherical tip of the

same diameter, made of steel, high-density polyethylene,

or other plastic of equal or greater abrasion resistance.




What are the requirements for the strike-off bar used in

this test method? - ANSWER-Flat, straight steel bar at

least 1/8 by 3/4 by 12 in. [3 by 20 by 300 mm] or a 4.4 flat,

straight high-density polyethylene bar, or other plastic of

equal or greater abrasion resistance, at least 1/4 by 3/4 by

23 in [6 by 30 by 300 mm].

Document information

Uploaded on
March 9, 2026
Number of pages
43
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$23.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ExamPoint
4.0
(5)
Sold
32
Followers
1
Items
2557
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions