• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 6 pages
Exam (elaborations)

Swt301 Part 5 Exam Questions With Verified Solutions Latest Update 2026

Document preview thumbnail
Preview 2 out of 6 pages

SWT301 PART 5 EXAM QUESTIONS WITH VERIFIED SOLUTIONS LATEST UPDATE 2026 You have just completed a pilot project for a regression testing tool. You understand the tool much better and have tailored your testing process to it. You have standardized an approach to using the tool and its associated work products. Which of the following is a typical test automation pilot project goal that remains to be carried out? A. Learn more details about the tool B. See how the tool would fit with existing processes and practices C. Decide on standard ways of using, managing, storing, and maintaining the tool and the test assets D. Assess whether the benefits will be achieved at reasonable cost - Answers D Which of the following tools is most useful for reporting test metrics? A. Test management tool B. Static analysis tool C. Coverage tool D. Model-Based testing tools - Answers A Which of the following tools would be involved in the automation of regression test? A. Data tester B. Boundary tester C. Capture/Playback D. Output comparator - Answers C Typical defects that are easier to find in reviews than in dynamic testing are: A. Deviations from standards B. Requirement defects C. Design defects D. Insufficient maintainability and incorrect interface specifications E. All of the above - Answers E Capture and replay facilities are least likely to be used to ___ A. Performance testing B. Recovery testing C. GUI testing D. User requirements - Answers D The specification which describes steps required to operate the system and exercise test cases in order to implement the associated test design A. Test Case Specification B. Test Design Specification C. Test Procedure Specification D. None of the others - Answers C A tool that supports traceability, recording of incidents or scheduling of tests is called: A. A dynamic analysis tool B. A test execution tool C. A debugging tool D. A test management tool E. A configuration management tool - Answers E Amount of testing performed will not depend on A. Risks involved B. Contractual requirements C. Legal requirements D. Test data - Answers D The Phases of formal review process is mentioned below arrange them in the correct order. i) Planning ii) Review Meeting iii) Rework iv) Individual Preparations v) Kick Off vi) Follow Up A. i, ii, iii, iv, v, vi B. vi, i, ii, iii, iv, v C. i, v, iv, ii, iii, vi D. i, ii, iii, v, iv, vi - Answers C There are several risks of managing your project's schedule with a statistical reliability model. These include (choose one or more of the following): A. Testers spend more energy early in the product trying to find bugs than preparing to do the rest of the project's work more efficiently B. Managers might not realize that the testing effort is ineffective, late in the project,because they expect a low rate of bug finding, so the low rate achieved doesn't alarm them. C. It can increase the end-of-project pressure on testers to not find bugs, or to not report bugs. D. All of the above - Answers D A typical commercial test execution tool would be able to perform all of the following EXCEPT: A. Generating expected outputs B. Replaying inputs according to a programmed script C. Comparison of expected outcomes with actual outcomes D. Recording test inputs E. Reading test values from a data file - Answers A Which is not a testing principle A. Early testing B. Defect clustering C. Pesticide paradox D. Exhaustive testing - Answers D The Kick Off phase of a formal review includes the following: A. Explaining the objective B. Fixing defects found typically done by author C. Follow up D. Individual Meeting preparations - Answers A Success Factors for a review include: i) Each Review does not have a predefined objective ii) Defects found are welcomed and expressed objectively iii) Management supports a good review process iv) There is an emphasis on learning and process improvement. A. ii, iii, iv are correct and i is incorrect B. iii, i, iv is correct and ii is incorrect C. i, iii, iv, ii is in correct D. ii is correct - Answers A Which of the following combinations correctly describes a valid approach to component testing: i) Functional testing of the component in isolation. ii) Structure-based testing of the code without recording incidents. iii) Automated tests that are run until the component passes. iv) Functional testing of the interfaces between modules. A. i and ii B. i, ii and iii C. iii D. ii and iv - Answers B Software quality is not relevant to _______ A. Correctness B. Usability C. Viability D. Reusability - Answers C Find the correct flow of the phases of a formal review A. Planning, Review meeting, Rework, Kick off B. Planning, Individual preparation, Kick off, Rework C. Planning, Review meeting, Rework, Follow up D. Planning, Individual preparation, Follow up, Kick off - Answers B Which one is not comes under international standard? A. IEC B. IEEE C. ISO D. All of the above - Answers B Important consequences of the impossibility of complete testing are (Choose one or more answers): A. We can never be certain that the program is bug free B. We have no definite stopping point for testing, which makes it easier for some managers to argue for very little testing C. We have no easy answer for what testing tasks should always be required, because every task takes time that could be spent on other high importance tasks D. All of the above - Answers D Test Case are grouped into Manageable (and scheduled) units are called as A. Test Harness B. Test Suite C. Test Cycle D. Test Driver - Answers B The purpose of requirement phase is A. To freeze requirements B. To understand user needs C. To define the scope of testing D. All of the above - Answers D Find the mismatch A. Test data preparation tools - Manipulate Data bases B. Test design tools - Generate test inputs C. Requirement management tools - Enables individual tests to be traceable D. Configuration management tools - Check for consistence - Answers D Test planning has which of the following major tasks? i) Determining the scope and risks, and identifying the objectives of testing. ii) Determining the test approach (techniques, test items, coverage, identifying and interfacing involved in testing, testware) iii) Reviewing the Test Basis (such as requirements, architecture, design, interface) iv) Determining the exit criteria. A. i, ii, iv are true and iii is false B. i, iii, iv are true and ii is false C. i, ii are true and iii, iv are false D. ii, iii, iv are true and i is false - Answers A Which of the following is true about Formal Review or Inspection: i) Led by Trained Moderator (not the author). ii) No Pre Meeting Preparations iii) Formal Follow up process. iv) Main Objective is to find defects A. ii is true and i, iii, iv are false B. i, iii, iv are true and ii is false C. i, iii, iv are false and ii is true D. iii is true and I, ii, iv are false - Answers B The person who leads the review of the document(s), planning the review, running the meeting and follow-up after the meeting A. Reviewer B. Author C. Moderator D. Auditor - Answers C To test a function, the programmer has to write a _________, which calls the function to be tested and passes it test data. A. Stub B. Driver C. Proxy D. None of the above - Answers B Majority of system errors occur in the ____ phase

Content preview

SWT301 PART 5 EXAM QUESTIONS WITH VERIFIED SOLUTIONS LATEST UPDATE 2026

You have just completed a pilot project for a regression testing tool. You understand the tool much
better and have tailored your testing process to it. You have standardized an approach to using the
tool and its associated work products. Which of the following is a typical test automation pilot project
goal that remains to be carried out?
A. Learn more details about the tool
B. See how the tool would fit with existing processes and practices
C. Decide on standard ways of using, managing, storing, and maintaining the tool and the test assets
D. Assess whether the benefits will be achieved at reasonable cost - Answers D
Which of the following tools is most useful for reporting test metrics?
A. Test management tool
B. Static analysis tool
C. Coverage tool
D. Model-Based testing tools - Answers A
Which of the following tools would be involved in the automation of regression test?
A. Data tester
B. Boundary tester
C. Capture/Playback
D. Output comparator - Answers C
Typical defects that are easier to find in reviews than in dynamic testing are:
A. Deviations from standards
B. Requirement defects
C. Design defects
D. Insufficient maintainability and incorrect interface specifications
E. All of the above - Answers E
Capture and replay facilities are least likely to be used to ___
A. Performance testing
B. Recovery testing
C. GUI testing
D. User requirements - Answers D
The specification which describes steps required to operate the system and exercise test cases in
order to implement the associated test design
A. Test Case Specification
B. Test Design Specification
C. Test Procedure Specification
D. None of the others - Answers C
A tool that supports traceability, recording of incidents or scheduling of tests is called:
A. A dynamic analysis tool
B. A test execution tool
C. A debugging tool
D. A test management tool
E. A configuration management tool - Answers E
Amount of testing performed will not depend on
A. Risks involved
B. Contractual requirements
C. Legal requirements
D. Test data - Answers D
The Phases of formal review process is mentioned below arrange them in the correct order.
i) Planning
ii) Review Meeting
iii) Rework
iv) Individual Preparations
v) Kick Off
vi) Follow Up
A. i, ii, iii, iv, v, vi
B. vi, i, ii, iii, iv, v

, C. i, v, iv, ii, iii, vi
D. i, ii, iii, v, iv, vi - Answers C
There are several risks of managing your project's schedule with a statistical reliability model. These
include (choose one or more of the following):
A. Testers spend more energy early in the product trying to find bugs than preparing to do the rest of
the project's work more efficiently
B. Managers might not realize that the testing effort is ineffective, late in the project,because they
expect a low rate of bug finding, so the low rate achieved doesn't alarm them.
C. It can increase the end-of-project pressure on testers to not find bugs, or to not report bugs.
D. All of the above - Answers D
A typical commercial test execution tool would be able to perform all of the following EXCEPT:
A. Generating expected outputs
B. Replaying inputs according to a programmed script
C. Comparison of expected outcomes with actual outcomes
D. Recording test inputs
E. Reading test values from a data file - Answers A
Which is not a testing principle
A. Early testing
B. Defect clustering
C. Pesticide paradox
D. Exhaustive testing - Answers D
The Kick Off phase of a formal review includes the following:
A. Explaining the objective
B. Fixing defects found typically done by author
C. Follow up
D. Individual Meeting preparations - Answers A
Success Factors for a review include:
i) Each Review does not have a predefined objective
ii) Defects found are welcomed and expressed objectively
iii) Management supports a good review process
iv) There is an emphasis on learning and process improvement.
A. ii, iii, iv are correct and i is incorrect
B. iii, i, iv is correct and ii is incorrect
C. i, iii, iv, ii is in correct
D. ii is correct - Answers A
Which of the following combinations correctly describes a valid approach to
component testing:
i) Functional testing of the component in isolation.
ii) Structure-based testing of the code without recording incidents.
iii) Automated tests that are run until the component passes.
iv) Functional testing of the interfaces between modules.
A. i and ii
B. i, ii and iii
C. iii
D. ii and iv - Answers B
Software quality is not relevant to _______
A. Correctness
B. Usability
C. Viability
D. Reusability - Answers C
Find the correct flow of the phases of a formal review
A. Planning, Review meeting, Rework, Kick off
B. Planning, Individual preparation, Kick off, Rework
C. Planning, Review meeting, Rework, Follow up
D. Planning, Individual preparation, Follow up, Kick off - Answers B
Which one is not comes under international standard?
A. IEC

Document information

Uploaded on
March 9, 2026
Number of pages
6
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$11.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
joshuawesonga22
3.5
(14)
Sold
139
Followers
3
Items
15630
Last sold
12 hours ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions