Quality assurance is defined as plans or action taken by an agency that provides
confidence that a product or service with be
satisfactory/adequate
I-15
A Quality Assurance program the framework necessary for construction Quality
serves as Assurance implementation
I-18
The making and revision of QA agency and industry personnel (engineers,
specs should include... inspectors, technicians)
I-19
The 6 elements used in "design bid True
build" QA programs are the same as I-22
"Design build" construction QA
programs
Quality control activities include... Sampling, testing and visual inspection
I-24
, QC plans ... -are Project Specific
- Address specific processes for individual
categories of work on a construction process
I-25
Acceptance is the responsibility of the transportation agency
... I-26
Engineering limits are ... the absolute threshold values for individual test
results
I-29
QA specs use Quality measures
I-28
The purpose of IA is to... identify discrepancies or differences in testing
procedures or equipment
I-34
IA comparison is performed on ... split samples
I-34
If contractor QC test results are not a dispute resolution system is not needed
used in acceptance... I-35
All agency central labs are ... required to be accredited through AASHTO
accreditation program AAP
Qualification/certification required to re-cert every 2-5 yrs
personnel should be... I-40
Each agency construction QA 23 CFR 637B and is required to be approved by
program must meet FHWA
I-41
COMPREHENSIVE QUESTIONS AND ANSWERS
|COMPLETE SOLUTIONS |A+ GRADED |100%
CORRECT!!
Save
Terms in this set (81)
Quality assurance is defined as plans or action taken by an agency that provides
confidence that a product or service with be
satisfactory/adequate
I-15
A Quality Assurance program the framework necessary for construction Quality
serves as Assurance implementation
I-18
The making and revision of QA agency and industry personnel (engineers,
specs should include... inspectors, technicians)
I-19
The 6 elements used in "design bid True
build" QA programs are the same as I-22
"Design build" construction QA
programs
Quality control activities include... Sampling, testing and visual inspection
I-24
, QC plans ... -are Project Specific
- Address specific processes for individual
categories of work on a construction process
I-25
Acceptance is the responsibility of the transportation agency
... I-26
Engineering limits are ... the absolute threshold values for individual test
results
I-29
QA specs use Quality measures
I-28
The purpose of IA is to... identify discrepancies or differences in testing
procedures or equipment
I-34
IA comparison is performed on ... split samples
I-34
If contractor QC test results are not a dispute resolution system is not needed
used in acceptance... I-35
All agency central labs are ... required to be accredited through AASHTO
accreditation program AAP
Qualification/certification required to re-cert every 2-5 yrs
personnel should be... I-40
Each agency construction QA 23 CFR 637B and is required to be approved by
program must meet FHWA
I-41