ICC Vapor Recovery 1 Pt. 2 Exam Newest 2026
Questions and Correct Detailed Answers Already
Graded A+
When installing the hanging hardware together use...
a. pipe dope
b. non-hardening sealant
c. teflon tape
d. oil or grease - CORRECT ANSWER-d. oil or grease
When installing in the EO VR-101-E you should have on site _____.
a. the executive order
b. Phil-tite installation manual
c. the equipment checklist
d. all the above - CORRECT ANSWER-d. all the above
,There are four ball valves on the clean air separator, what position are they to be
in?
a. top and bottom valve open, the rest are closed
b. top and bottom valve closed, the rest are open
c. top valve open, the rest are closed
d. bottom valve open, the rest are closed - CORRECT ANSWER-c. top valve
open, the rest are closed
Under Dispenser Containment is required to be designed and constructed in
accordance with ____.
a. the appropriate Executive Order
b. generally accepted secondary containment practices
c. standards of an independent testing organization with industry code
d. an engineering specification approved by a state registered professional
engineer or engineering standard - CORRECT ANSWER-c. standards of an
independent testing organization with industry code
, With a Gilbarco Vapor-Vac, the OPW 12VW nozzle has a hole or tear in the vapor
escape guard, it is a defect if ____% of the circumference is missing.
a. 25%
b. 75%
c. 50%
d. 65% - CORRECT ANSWER-b. 75%
Gasoline thread sealant can be used on all except _____.
a. threaded portion of rotatable adapters
b. p/v valve
c. ball float
d. riser adapter - CORRECT ANSWER-a. threaded portion of rotatable
adapters
when installing copper tubing use all except _____.
a. copper tubing cutter
Questions and Correct Detailed Answers Already
Graded A+
When installing the hanging hardware together use...
a. pipe dope
b. non-hardening sealant
c. teflon tape
d. oil or grease - CORRECT ANSWER-d. oil or grease
When installing in the EO VR-101-E you should have on site _____.
a. the executive order
b. Phil-tite installation manual
c. the equipment checklist
d. all the above - CORRECT ANSWER-d. all the above
,There are four ball valves on the clean air separator, what position are they to be
in?
a. top and bottom valve open, the rest are closed
b. top and bottom valve closed, the rest are open
c. top valve open, the rest are closed
d. bottom valve open, the rest are closed - CORRECT ANSWER-c. top valve
open, the rest are closed
Under Dispenser Containment is required to be designed and constructed in
accordance with ____.
a. the appropriate Executive Order
b. generally accepted secondary containment practices
c. standards of an independent testing organization with industry code
d. an engineering specification approved by a state registered professional
engineer or engineering standard - CORRECT ANSWER-c. standards of an
independent testing organization with industry code
, With a Gilbarco Vapor-Vac, the OPW 12VW nozzle has a hole or tear in the vapor
escape guard, it is a defect if ____% of the circumference is missing.
a. 25%
b. 75%
c. 50%
d. 65% - CORRECT ANSWER-b. 75%
Gasoline thread sealant can be used on all except _____.
a. threaded portion of rotatable adapters
b. p/v valve
c. ball float
d. riser adapter - CORRECT ANSWER-a. threaded portion of rotatable
adapters
when installing copper tubing use all except _____.
a. copper tubing cutter