• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 17 pages
Exam (elaborations)

Architect’s Guidelines – 2026 – Study Guide and Reference Notes

Document preview thumbnail
Preview 3 out of 17 pages

This document outlines key guidelines and principles used in architectural design and planning. It covers essential standards, design considerations, and professional practices that help guide architects in creating functional, safe, and efficient built environments.

Content preview

Architect’s Guidelines – 2026 – Study Guide and
Reference Notes

Architect's Guidelines for Standards of Professional Practice Compliances - Methods of
Compensation and Schedule of Fees - correct answer ✔✔ UAP-IAPOA Doc. 210



Pre-Design Services - correct answer ✔✔ SPP Doc. 201



Regular Design Services - correct answer ✔✔ SPP Doc. 202



Specialized Architectural Services - correct answer ✔✔ SPP Doc. 203



Full-Time Construction Supervision Services - correct answer ✔✔ SPP Doc. 204-A



Construction Management Services - correct answer ✔✔ SPP Doc. 204-B



Post-Construction Services - correct answer ✔✔ SPP Doc. 205



Comprehensive Architectural Services - correct answer ✔✔ SPP Doc. 206



Design-Build Services - correct answer ✔✔ SPP Doc. 207



Architectural Design Competition - correct answer ✔✔ SPP Doc. 208



Professional Architectural Consulting Services - correct answer ✔✔ SPP Doc. 209

,UAP-IAPOA Doc. 210 - correct answer ✔✔ Replaced the 1979 UAP Doc. 208-b (Methods of
Compensation and Schedule of Fees)



Code of Ethical Conduct - correct answer ✔✔ SPP Doc. 200



Standards of Professional Practice - correct answer ✔✔ SPP Doc. 201-209



1. Percentage-based fee;

2. Lump sum or fixed fee;

3. Time basis - correct answer ✔✔ [,UAP-IAPOA Doc. 210,]

General classifications of methods of compensation



1. Percentage based on project construction cost;

2. Unit cost method;

3. Value-based pricing/percentage of gross rentals - correct answer ✔✔ [,UAP-IAPOA Doc. 210,]

Methods of compensation under Percentage-based fee



Percentage based on project construction cost - correct answer ✔✔ [,UAP-IAPOA Doc. 210,]

This method of compensation for architectural services is the most common worldwide. The
amount of the percentage is related to the size and the type of the Proiect



Specified percentage times the Project Construction Cost (PCC) - correct answer ✔✔ [,UAP-
IAPOA Doc. 210,]

Formula of professional fee of the architect in percentage based on project construction cost



Professional Fee - correct answer ✔✔ PF

, Project Construction Cost - correct answer ✔✔ PCC



1. Probable Project Construction Cost (PPCC)

2. Awarded Project Construction Cost (APCC)

3. Final Project Construction Cost (FPCC) - correct answer ✔✔ [,UAP-IAPOA Doc. 210,]

Charges based on a percentage of construction cost are usually determined by one of the
following methods:



Probable Project Construction Cost - correct answer ✔✔ PPCC



Awarded Project Construction Cost - correct answer ✔✔ APCC



Final Project Construction Cost - correct answer ✔✔ FPCC



Detailed Architectural and Engineering Design Services (DAEDS) - correct answer ✔✔ [,UAP-
IAPOA Doc. 210,][,4.1.1 Percentage based on project construction cost,]

Most common type of contract for architectural design services



Detailed Architectural and Engineering Design Services - correct answer ✔✔ DAEDS



Detailed Architectural and Engineering Design Services (DAEDS) - correct answer ✔✔ [,UAP-
IAPOA Doc. 210,][,4.1.1 Percentage based on project construction cost,]

This includes the architectural design and the normal basic engineering design services for
structural, plumbing, sanitary, mechanical and electrical systems. This arrangement is desirable
if the Client prefers a single point responsibility for the Project Design.



Detailed Architectural Design Services (DADS), sixty percent (60%) - correct answer ✔✔ [,UAP-
IAPOA Doc. 210,][,4.1.1 Percentage based on project construction cost,]

Document information

Uploaded on
March 7, 2026
Number of pages
17
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$22.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
StuviaExamHub
3.7
(93)
Sold
507
Followers
356
Items
26959
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions