OSSF DR UPDATED SCRIPT 2026 PRACTICE
SOLUTIONS GRADED A+
● Designated Representative. Answer: Who is responsible for reviewing
permit applications, site evaluations, planning materials, and conducting
inspections of OSSF's?
● Installer. Answer: An individual who holds a valid license from the
TCEQ and who is compensated by another individual to construct,
install, alter, or repair an OSSF in an ___
● Site Evaluator. Answer: An individual who visits a site and conducts
soil evaluations and a site survey is an___
● Installer II and Mainetence Provider. Answer: What are the two OSSF
licenses that require previous experience?
● Civil, Criminal, Administrative. Answer: What are the penalities for
violating the laws?
● PE or RS. Answer: Planning materials for an OSSF utilizing
secondary treatment must be prepared by an
SOLUTIONS GRADED A+
● Designated Representative. Answer: Who is responsible for reviewing
permit applications, site evaluations, planning materials, and conducting
inspections of OSSF's?
● Installer. Answer: An individual who holds a valid license from the
TCEQ and who is compensated by another individual to construct,
install, alter, or repair an OSSF in an ___
● Site Evaluator. Answer: An individual who visits a site and conducts
soil evaluations and a site survey is an___
● Installer II and Mainetence Provider. Answer: What are the two OSSF
licenses that require previous experience?
● Civil, Criminal, Administrative. Answer: What are the penalities for
violating the laws?
● PE or RS. Answer: Planning materials for an OSSF utilizing
secondary treatment must be prepared by an