OSSF DR CERTIFICATION PAPER 2026
FULL SOLUTION GRADED A+
● Designated Representative. Answer: is responsible for reviewing
permit applications, site evaluations, planning
materials, and conducting inspections of OSSFs.
● Installer. Answer: An individual who holds a valid license from the
TCEQ and who is compensated by another
individual to construct, install, alter, or repair an OSSF
● Site Evaluator. Answer: An individual who visits a site and conducts
soil evaluations and a site survey
● Installer II & Maintenance Provider. Answer: List the OSSF licenses
that require previous experience.
● Designated Representative. Answer: cannot work as an Installer,
Designer for a fee, or private Site Evaluator within the jurisdiction of the
permitting authority.
● PE or RS. Answer: Planning materials for an OSSF utilizing
secondary treatment must be prepared by a/an
FULL SOLUTION GRADED A+
● Designated Representative. Answer: is responsible for reviewing
permit applications, site evaluations, planning
materials, and conducting inspections of OSSFs.
● Installer. Answer: An individual who holds a valid license from the
TCEQ and who is compensated by another
individual to construct, install, alter, or repair an OSSF
● Site Evaluator. Answer: An individual who visits a site and conducts
soil evaluations and a site survey
● Installer II & Maintenance Provider. Answer: List the OSSF licenses
that require previous experience.
● Designated Representative. Answer: cannot work as an Installer,
Designer for a fee, or private Site Evaluator within the jurisdiction of the
permitting authority.
● PE or RS. Answer: Planning materials for an OSSF utilizing
secondary treatment must be prepared by a/an