If a foreman from a different trade approaches you
|\ |\ |\ |\ |\ |\ |\ |\ |\
claiming that one of your crew members has been injured|\ |\ |\ |\ |\ |\ |\ |\ |\
while working outside of his scope of work, what would
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
be the FIRST action you should take? - CORRECT
|\ |\ |\ |\ |\ |\ |\ |\ |\
ANSWERS ✔✔Get the crew member medical attention. |\ |\ |\ |\ |\ |\
Which of the following is a true statement with respect to
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
a foreman 's responsibility related to his or her crew? -
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
CORRECT ANSWERS ✔✔The foreman is responsible for |\ |\ |\ |\ |\ |\ |\
anything that occurs at the jobsite from the beginning of
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
the work day/shift to the end of the work day/shift.
|\ |\ |\ |\ |\ |\ |\ |\ |\
Why is preparation so important in a negotiation? -
|\ |\ |\ |\ |\ |\ |\ |\ |\
CORRECT ANSWERS ✔✔Having time to prepare and |\ |\ |\ |\ |\ |\ |\
having a plan makes it easier to keep emotions in check.
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
The piping specifications required all wall penetrations to
|\ |\ |\ |\ |\ |\ |\ |\
have a steel pipe sleeve.The steam piping size is 4 inches
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
SCH 80 carbon steel with 1 inch of fiberglass insulation.
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
What diameter of SCH 40 carbon steel sleeve is the
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
minimum that you can use? - CORRECT ANSWERS ✔✔8 |\ |\ |\ |\ |\ |\ |\ |\ |\
inches
,A member of your crew is being excessively loud and
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
using inappropriate language. As a foreman, what is the
|\ |\ |\ |\ |\ |\ |\ |\ |\
MOST effective course of action to take? - CORRECT
|\ |\ |\ |\ |\ |\ |\ |\ |\
ANSWERS ✔✔Explain to them that their behavior is |\ |\ |\ |\ |\ |\ |\ |\
inappropriate and may be considered harassment by |\ |\ |\ |\ |\ |\ |\
fellow crew members and by management
|\ |\ |\ |\ |\
What is the purpose of a separation notice? - CORRECT
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
ANSWERS ✔✔The purpose of a separation notice is to |\ |\ |\ |\ |\ |\ |\ |\ |\
identify the circumstances surrounding a termination.
|\ |\ |\ |\ |\
With which of the following costs should a foreman be
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
MOST concerned? - CORRECT ANSWERS ✔✔Labor
|\ |\ |\ |\ |\
A(n) ________________ occurs when any condition or
|\ |\ |\ |\ |\ |\ |\
document modifies the work as defined in the contract |\ |\ |\ |\ |\ |\ |\ |\ |\
documents during the bidding process. - CORRECT |\ |\ |\ |\ |\ |\ |\
ANSWERS ✔✔Change Order |\ |\
On a project that requires 100% tie-off for elevated work,
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
how many lanyards are required on a full body harness? -
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
CORRECT ANSWERS ✔✔2 |\ |\
The client is not happy with part of the project and wants
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
to make a change. What actions should you take to
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
, ensure the client is happy while ensuring that progress on
|\ |\ |\ |\ |\ |\ |\ |\ |\
your job continues? - CORRECT ANSWERS ✔✔Stop
|\ |\ |\ |\ |\ |\ |\ |\
working on that portion of the job that is at issue and
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
contact your supervisor. |\ |\
Using drawing, what is the elevation of the top of the 24 x
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
18 duct? - CORRECT ANSWERS ✔✔31 feet and 10 inches.
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
On the project blueprint there is a bank of four pipe runs
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
with each pipe measuring three inches in diameter which
|\ |\ |\ |\ |\ |\ |\ |\ |\
measure 12 inches in length on the blueprint. The scale
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
used on the blueprint is 1/4 inch equals 1 foot. How many
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
feet of 3 inch pipe should be ordered to complete the
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
runs? - CORRECT ANSWERS ✔✔192 feet
|\ |\ |\ |\ |\
Using the formula below, what is the correct 45 offset
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
when you have a rolling offset where the roll is 8 inches
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
and the rise is 6 inches? Formula: Offset = roll 2 + rise2 -
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
CORRECT ANSWERS ✔✔10 inches. |\ |\ |\
What is the first rule of negotiation? - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\ |\ |\ |\
✔✔Understand the other person's needs.
|\ |\ |\ |\ |\
Assume that you need to purchase 1,000 feet of pipe for
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
your assigned project. If pipe costs $1.25 per foot, what is
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\