Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 20 pages
Exam (elaborations)

CA CONTRACTORS LICENSE TEST QUESTIONS BUSINESS AND LAW NEWEST 2026 VERSION A AND VERSION B COMPLETE 140 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A

Document preview thumbnail
Preview 3 out of 20 pages

Ace your California contractors exam with the most up-to-date study guide for 2026. This comprehensive resource features 140 verified questions and answers for both Version A and Version B of the Business and Law exam. Covering critical topics like mechanic's liens, contract requirements, license renewal, labor laws, safety protocols, and bonding, this guide provides the detailed rationales you need to understand complex legal concepts and pass on your first try. Whether you're studying fixed costs, arbitration, or public works regulations, these graded questions will ensure you are fully prepared for the CSLB exam.

Content preview

CA CONTRACTORS LICENSE TEST QUESTIONS
BUSINESS AND LAW NEWEST 2026 VERSION A AND
VERSION B COMPLETE 140 QUESTIONS AND
CORRECT DETAILED ANSWERS (VERIFIED
ANSWERS) |ALREADY GRADED A

VERSION A

Who must sign and date the contract? - CORRECT ANSWER ✔✔- Client
and contractor


After the lien has been recorded by the contractor, what is the next
step - CORRECT ANSWER ✔✔- File the lawsuit to 'perfect' the lien


What is the purpose of the mechanic's lien? - CORRECT ANSWER ✔✔- It
encumber the owners property as security until the bill is paid


What info is needed on a time card according to the fair labor standard
act? - CORRECT ANSWER ✔✔- Social security


Who is required to conduct safety/tailgate meetings? - CORRECT
ANSWER ✔✔- Supervisors are required every 10 days


In a construction business, who is responsible for training new
employees - CORRECT ANSWER ✔✔- The contractor

1|Page

,How much time do contractors have to record mechanics lien after a
notice of completion has been recorded - CORRECT ANSWER ✔✔- 30
days.
Prime contractors will have 60


What is the purpose of notice to owner? - CORRECT ANSWER ✔✔- To
inform the home owner of the contractors lien rights


If the contractor obtains his contractors license on April 7, 2010 when
will the license need to be renewed? - CORRECT ANSWER ✔✔- April 30
2012
Contract expires 2 years at the end of the month


Where would depressiation appear on the balance sheet> - CORRECT
ANSWER ✔✔- Fixed assets.
Only fixed assets can be depreciated


Homeowners have how many days from the date of completion to file a
notice of completion - CORRECT ANSWER ✔✔- 15


On public projects, the contractor must pay his employees at what
rate? - CORRECT ANSWER ✔✔- Regular pay


2|Page

, What are fixed costs in the construction business - CORRECT ANSWER
✔✔- Rent, Managers salary


What does the ceiling limit mean in tax - CORRECT ANSWER ✔✔- Max
tax that can be imposed


What does the occurrence basis cover in liability insurance? - CORRECT
ANSWER ✔✔- After the insurance policy has expired, the contractor is
still covered
Occurrence basis means that as long as you had insurance during the
time of the accident, you will be covered, even if the claim was filed
after the expiration of the policy


If an employee shows up 15 minutes late to work, what is the max
amount of time the employer can deduct from wages? - CORRECT
ANSWER ✔✔- 30 minutes


Whats the max amount of time a minor can work on a school day? -
CORRECT ANSWER ✔✔- 4 hrs


It is recommended for a contractor to renew the contractors license
bond when? - CORRECT ANSWER ✔✔- 30 days before it expires


What costs are significant when bidding on public works projects -
CORRECT ANSWER ✔✔- wages
3|Page

Document information

Uploaded on
March 5, 2026
Number of pages
20
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$21.48

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
PrepMaster
4.7
(314)
Sold
376
Followers
21
Items
3337
Last sold
9 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions