• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 18 pages
Exam (elaborations)

Cslb Class B General Contractor's License - Building's Exam- Framing & Structural Questions & Updated Answers All Passed

Document preview thumbnail
Preview 3 out of 18 pages

CSLB CLASS B GENERAL CONTRACTOR'S LICENSE - BUILDING'S EXAM- FRAMING & STRUCTURAL QUESTIONS & UPDATED ANSWERS ALL PASSED refers to training programs designed to help individuals prepare for the contractor licensing process required to legally work as a contractor in the U.S. state of California

Content preview

CSLB CLASS B GENERAL
CONTRACTOR'S LICENSE -
BUILDING'S EXAM- FRAMING &
STRUCTURAL QUESTIONS &
UPDATED ANSWERS ALL PASSED
How much clearance is needed between the ground and wood siding? - Correct Answer
✔✔ 6 inches

When nailing a continuous header to the studs, best practice is to use: - Correct Answer
✔✔ 4X10d nails

Graded lumber is stamped with information about the lumber. What is included? -
Correct Answer ✔✔ Moisture content, Grade, Species

When are studs doubled? - Correct Answer ✔✔ In load bearing walls with holes
exceeding 40% of the stud depth.

A solid plywood roof deck at 3/12 pitch or greater, receiving asphalt shingles and having
rafters laid out 24 inches on center, should have a minimum plywood sheathing
thickness of ______. - Correct Answer ✔✔ 5/8 inch

Specific information about shear walls, such a type of sheathing and nailing, can usually
be found on the building plans. Abbreviations such as "6W4" are common, which would
mean: - Correct Answer ✔✔ OSB with edge nailing 4" o.c. and field 6 "o.c.

Graded lumber is marked with an indication of moisture content; which is the driest
designation? - Correct Answer ✔✔ S-GRN: "Surfaced Green" Not dried, moisture
content over 19%.S-DRY: "Surfaced Dry" Air dried to a moisture content less than 19%.
KD: "Kiln Dry" Dried in a heated kiln to a moisture content less than 19%.MC 15:
"Moisture Content 15%" Dried to a moisture content of 15% or less.HT: "Heat Treated"
Heated to at least 133° Fahrenheit for 30 minutes at the board's core to kill any insects
present in the wood.

What is the purpose of a step flashing? - Correct Answer ✔✔ To shed water away from
the structure at roof to wall transitions

(Step flashing are interwoven between each course of shingles and protect the
transition from water intrusion by creating a water shed aka shingle effect.
Next Question

,Leave Feedback)

Bracing lines:

A) Will always be parallel
B) Should intersect at 90˚
C) Always run in the same direction
D) Can be added at any time - Correct Answer ✔✔ A) Will always be parallel

Proper installation of roof pipe and vent penetration base flashing should consist of:

A) Apply shingles so as to completely conceal base flashing
B) Apply shingles under the base flashing and seal perimeter of base flashing with roof
cement
C) Seal pipe/vent penetration with roof cement
D) Weave shingles under the lower end of the base flashing and over the upper portion
of the base flashing - Correct Answer ✔✔ D) Weave shingles under the lower end of the
base flashing and over the upper portion of the base flashing

(In re-roof overlays, many roofers will conceal the base flashing under the shingles and
apply mastic at the transition. While this method is allowable for overlays, it is not
recommended due to the inherent likelihood of moisture influence under the shingles at
these locations.)

Grade designations indicate the recommended use of lumber. Which grade would you
chose for building trusses?

A) Structural light framing No: 1
B) Structural light framing No: 3
C) Light framing: Construction
D) Light framing: Standard - Correct Answer ✔✔ A) Structural light framing No: 1

In crawlspace, if the floor is built out of non-pressure treated wood, how high is the floor
joist from the soil? - Correct Answer ✔✔ 18"

When building a deck, it may be necessary to use blocking between joists.

A) Blocking is required at the beginning of any overhang
B) Blocking is required every 10 feet
C) Blocking is required if joists are 24" o.c. or more
D) Blocking is required if joists are 8"x or larger - Correct Answer ✔✔ A) Blocking is
required at the beginning of any overhang

What is the maximum spacing of 2 x 4 inch studs on a 1 story house? - Correct Answer
✔✔ 24" o. c.

, Engineered floor trusses and I-Joists should:

A) Always be kept in low humidity
B) Not be notched
C) Purchased in batches
D) Always be approved by an engineer - Correct Answer ✔✔ B) Not be notched

Double top plates are best nailed together with:

A) 10d 24" o.c
B) 16d 24" o.c
C) 10d 16" o.c
D) 16d 16" o.c. - Correct Answer ✔✔ D) 16d 16" o.c.

(According to the California Residential Code, 16d common nails at 16" o.c. face nail or
10d box nails at 12" o.c. face nail.)

Hold-downs are usually set into the foundation or pad. Where else might you need to
install them?

A) Between floors
B) Into piers
C) Onto cripples
D) Under posts - Correct Answer ✔✔ A) Between floors

What is the maximum height for a laterally unsupported 2 x 4 inch nonbearing wall
stud? - Correct Answer ✔✔ 14'

Why do you need to double-up on a top plate?

A) Shear wall requirement
B) Seismic requirement
C) To support a 2nd story
D) Interrupt ceiling membrane for fire-resistance - Correct Answer ✔✔ D) Interrupt
ceiling membrane for fire-resistance

(Fire resistance is required between the first and second story of a building and this can
be achieved by using a 1-hr or 2-hr fire-resistant ceiling membrane. However, doubling
up on a top plate allows for interruptions of the ceiling membrane assuming X-type
gypsum wallboard is used and that all penetrating items through the double top plate
are protected.
Among other things, the top plate is doubled to maintain tension continuity for lateral
loads.)

After fabricating a beam for use on a deck from 2x material. Boards should be
connected with:

Document information

Uploaded on
March 5, 2026
Number of pages
18
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$21.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
STUVIA2024
3.5
(4)
Sold
31
Followers
0
Items
7343
Last sold
6 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions