WITH 100% VERIFIED ANSWERS
\.: Which of following statements is true? Select ALL correct options Regression testing should
be
performed:
i Once a month
ii When a defect has been fixed
iii When the test environment has changed
iv When the software has changed
A. ii and iv.
B. ii, iii and iv.
C. i, ii and iii.
D. i and iii. - ANSWERS✔-B
\.Which of the following is an objective of a pilot project for the introduction of a testing tool?
A. Evaluate testers� competence to use the tool.
B. Complete the testing of a key project.
C. Assess whether the benefits will be achieved at reasonable cost.
D. Discover what the requirements for the tool are. - ANSWERS✔-C
\.In a REACTIVE approach to testing when would you expect the bulk of the test design work to
be begun?
, A. After the software or system has been produced.
B. During development.
C. As early as possible.
D. During requirements analysis - ANSWERS✔-A
\.Which activity in the fundamental test process includes evaluation of the testability of the
requirements and system?
A. Test analysis and design.
B. Test planning and control.
C. Test closure.
D. Test implementation and execution. - ANSWERS✔-A
\.Which of the following defines the sequence in which tests should be executed?
A. Test plan.
B. Test procedure specification.
C. Test case specification.
D. Test design specification. - ANSWERS✔-B
\.Which of the following is a characteristic of good testing in any life cycle model?
A. All document reviews involve the development team.
B. Some, but not all, development activities have corresponding test activities.
C. Each test level has test objectives specific to that level.
D. Analysis and design of tests begins as soon as development is complete. - ANSWERS✔-C
\.In a system designed to work out the tax to be paid:
An employee has � 4000 of salary tax free.