100% CORRECT ANSWERS
\.Regression testing should be performed:
v) every week
w) after the software has changed
x) as often as possible
y) when the environment has changed
z) when the project manager says
A. v & w are true, x, y & z are false
B. w, x & y are true, v & z are false
C. w & y are true, v, x & z are false
D. w is true, v, x, y & z are false - ANSWERS✔-C
\.Contract and regulation testing is a part of
A. System testing
B. Acceptance testing
C. Integration testing
D. Smoke testing - ANSWERS✔-B
\.PDCA is known as
A. Plan, Do, Check, Act
B. Plan, Do, Correct, Act
,C. Plan, Debug, Check, Act
D. Plan, Do, Check, Accept - ANSWERS✔-A
\.In a review meeting a moderator is a person who
A. Takes minutes of the meeting
B. Mediates between people
C. Takes telephone calls
D. Writes the documents to be reviewed - ANSWERS✔-B
\.A tool that supports traceability, recording of incidents or scheduling of tests is called:
A. A dynamic analysis tool
B. A test execution tool
C. A debugging tool
D. A test management tool
E. A configuration management tool - ANSWERS✔-D
\.Which is the non-functional testing
A. Performance testing
B. Unit testing
C. Regression testing
D. Sanity testing - ANSWERS✔-A
\.PDCA is known as
A. Plan, Do, Check, Act
B. Plan, Do, Correct, Act
C. Plan, Debug, Check, Act
,D. Plan, Do, Check, Accept - ANSWERS✔-A
\.Which is not a test Oracle
A. The existing system (For a bench mark)
B. The code
C. Individual's knowledge
D. User manual - ANSWERS✔-B
\.A _____ is the step-by-step method followed to ensure that standards are met
A. SDLC
B. Project Plan
C. Policy
D. Procedure - ANSWERS✔-D
\.FPA is used to
A. To measure the functional requirements of the project
B. To measure the size of the functionality of an Information system
C. To measure the functional testing effort
D. To measure the functional flow - ANSWERS✔-B
\.The principle of Cyclomatic complexity, considering L as edges or links, N as nodes, P
asindependent paths
A. L-N +2P
B. N-L +2P
C. N-L +P
D. N-L +P - ANSWERS✔-A
, \.Which aspects of testing will establishing traceability help
A. Configuration management and test data generation
B. Test case specification and change control
C. Test condition and test procedure specification
D. Impact analysis and requirements coverage - ANSWERS✔-D
\.The ________ and ________ are used within individual workbenches to produce the
rightoutput products.
A. Tools and techniques
B. Procedures and standards
C. Processes and walkthroughs
D. Reviews and update - ANSWERS✔-B
\.Which is not the fundamental test process
A. Planning and control
B. Test closure activities
C. Analysis and design
D. None - ANSWERS✔-D
\.Which test can be performed at all test levels
A. System testing
B. Operational testing
C. Structural testing
D. Integration testing - ANSWERS✔-C