COMPLETE WITH 100% CORRECT
ANSWERS
\.Which of the following is not a type of incremental testing approach?
Select one:
a. Bottom up
b. Big-bang
c. Functional incrementation.
d. Top down - ANSWERS✔-B
\.Exit Criteria may consist of
Select one or more:
a. Estimates of Defect density or reliability measures.
b. Residual risk such as defects not fixed or lack of test coverage in certain areas
c. Verifying the Test Environment.
d. Thoroughness measures , such as coverage of code, functionality or risk - ANSWERS✔-ABD
\.Which of the following helps in monitoring the Test Progress
Select one or more:
a. The size of the testing Team and skills of the engineers
b. Defect Information e.g. defect density, defects found and fixed
, c. Percentage of Test Case Execution
d. Percentage of work done in test environment preparation. - ANSWERS✔-BCD
\.The selection of a test approach should consider the context
Select one or more:
a. Risk of Failure of the Project, hazards to the product and risks of product failure to humans
b. Skills and experience of the people in the proposed technique, tools and methods
c. The size of the testing Team
d. The objective of the testing endeavor and the mission of the testing team. - ANSWERS✔-ABD
\.In case of Large Systems
Select one:
a. Testing should be on the basis of Risk
b. Test Cases written by good test engineers should be executed.
c. Only Good Test Cases should be executed.
d. Only few tests should be run - ANSWERS✔-A
\.The Provision and Management of a controlled library containing all the configurations items is
called as
Select one:
a. Configuration Identification
b. Configuration Identification
c. Status Accounting
d. Configuration Control - ANSWERS✔-D
\.IEEE 829 test plan documentation standard contains all of the following except: