COMPLETE WITH 100% VERIFIED
ANSWERS
\.A bank application determines the creditworthiness of customers. The application uses a set
of rules to determine the upper limit of the credit amount. Which of the following black-box
test design techniques is best for testing the application?
A. State transition testing
B. Use case testing
C. Equivalence partitioning
D. Decision table testing - ANSWERS✔-D
\.802: Below you find a list of improvement goals a software development and test organization
would like to achieve.
,Which of these goals for improving the efficiency of test activities would best be supported by a
test management tool?
A. Improve the efficiency by optimizing the ability of tests to identify failures.
B. Improve the efficiency by building traceability between requirements, tests, and bugs
C. Improve the efficiency by faster resolving defects
D. Improve the efficiency by automating the selection of test cases for execution. - ANSWERS✔-
B
\.Which statement about combinations of inputs and preconditions is true for a large system?
A. It is easy to test them all in a short time
B. It is not practically possible to test them all
C. It is not possible to test any of them
D. It is essential to test them all in order to do good testing - ANSWERS✔-B
,\.Which tests are BEST described by the following characteristics?
W. Component testing
X. Integration testing
Y. Alpha testing
Z. Robustness testing
1. Testing the interaction between components
2. Fixing defects as soon as they are found
3. Automating test cases before coding
4. Testing separately testable components
A. W1, X4, Y3 and Z2
B. W2, W4, X1 and Z1
C. W2, W3, W4 and X1
D. W3, X1, X2 and X4 - ANSWERS✔-C
\.Why should expected results be defined before execution?
A. To assist in test automation
B. To improve test efficiency
C. To reduce the possibility of incorrect results
, D. To improve design of the software - ANSWERS✔-C
\.Which characteristics BEST describe a walkthrough?
A. Documented, includes peers and experts
B. Formal process collects metrics
C. Defined roles, led by trained moderator
D. Led by the author, may be documented - ANSWERS✔-D
\.Which of the following is a MAJOR activity of test control?
A. Scheduling test analysis and design
B. Implementing the test policy or strategy
C. Making decisions based on information from test monitoring
D. Determining the scope and risks - ANSWERS✔-C
\.For which of the following is Impact Analysis ESPECIALLY important?