• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 484 pages
Exam (elaborations)

Swt301 Exam Complete Questions With 100% Verified Answers

Document preview thumbnail
Preview 4 out of 484 pages

SWT301 EXAM COMPLETE QUESTIONS WITH 100% VERIFIED ANSWERS .Q. 1001: Which of the following is true? A. Component testing should be black box, system testing should be white box. B. If u find a lot of bugs in testing, you should not be very confident about the quality of software C. The fewer bugs you find, the better your testing was D. The more tests you run, the more bugs you will find. - ANSWERS-B .Q. 1002: If the pseudo code below were a programming language ,how many tests are required to achieve 100% statement coverage? 1. If x=3 then 2. Display_messageX; 3. If y=2 then 4. Display_messageY; 5. Else 6. Display_messageZ; 7. Else 8. Display_messageZ; A. 1 B. 2 C. 3 D. 4 - ANSWERS-C .Q. 1003: In which order should tests be run? A. The most important tests first B. The most difficult tests first(to allow maximum time for fixing) C. The easiest tests first (to give initial confidence) D. The order they are thought of - ANSWERS-A .Q. 1004: A program validates a numeric field as follows: Values less than 10 are rejected, values between 10 and 21 are accepted, values greater than or equal to 22 are rejected. Which of the following covers the MOST boundary values? A. 9,10,11,22 B. 9,10,21,22 C. 10,11,21,22 D. 10,11,20,21 - ANSWERS-B .Q. 1005: What is the important criterion in deciding what testing technique to use? A. How well you know a particular technique B. The objective of the test C. How appropriate the technique is for testing the application D. Whether there is a tool to support the technique - ANSWERS-B .Q. 1006: Which is not true-The black box tester A. Should be able to understand a functional specification or requirements document B. Should be able to understand the source code. C. Is highly motivated to find faults D. Is creative to find the system�s weaknesses - ANSWERS-B .Q. 1007: A number of critical bugs are fixed in software. All the bugs are in one module, related to reports. The test manager decides to do regression testing only on the reports module. A. The test manager should do only automated regression testing. B. The test manager is justified in her decision because no bug has been fixed in other modules C. The test manager should only do confirmation testing. There is no need to do regression testing D. Regression testing should be done on other modules as well because fixing one module may affect other modules - ANSWERS-D .Q. 1008: Which of the following statements contains a valid goal for a functional test set? A. A goal is that no more failures will result from the remaining defects B. A goal is to find as many failures as possible so that the cause of the failures can be identified and fixed C. A goal is to eliminate as much as possible the causes of defects D. A goal is to fulfil all requirements for testing that are defined in the project plan. - ANSWERS-B .Q. 1009: Which set of metrics can be used for monitoring of the test execution? A. Number of detected defects, testing cost; B. Number of residual defects in the test object. C. Percentage of completed tasks in the preparation of test environment; test cases prepared D. Number of test cases run / not run; test cases passed / failed - ANSWERS-D .Q. 1010: Which of the following can be root cause of a bug in a software product? (I) The project had incomplete procedures for configuration management. (II) The time schedule to develop a certain component was cut. (III) the specification was unclear (IV) Use of the code standard was not followed up (V) The testers were not certified A. (I) and (II) are correct B. (I) through (IV) are correct C. (III) through (V) are correct D. (I), (II) and (IV) are correct - ANSWERS-B .Q. 1011: The following list contains risks that have been identified for a software product to be developed. Which of these risks is an example of a product risk? A. Not enough qualified testers to complete the planned tests B. Software delivery is behind schedule C. Threat to a patient�s life D. 3rd party supplier does not supply as stipulated - ANSWERS-C .Q. 1012: A test engineer is testing a Video Player (VCR), and logs the following report: Title: Fast Forward stops after 2 minutes. It happens every time Expected result: Fast forward continues till the end of the tape Severity: High Priority: Urgent What important information did the engineer leave out? A. Identification (Software and hardware) of the VCR B. Actual result C. History of the report D. Ideas for the test case improvement - ANSWERS-A .Q. 1013: Test data planning essentially includes A. Network B. Operational Model C. Boundary value analysis D. Test Procedure Planning - ANSWERS-D .Q. 1014: Functional testing is mostly A. Validation techniques B. Verification techniques C. Both of the above D. None of the above - ANSWERS-A .Q. 1015: Component integration testing can be done A. Before Integration testing B. After unit testing C. After component testing D. After system testing - ANSWERS-C .Q. 1016: White Box Testing A. Same as glass box testing B. Same as clear box testing C. Both A. and B.

Content preview

SWT301 EXAM COMPLETE
QUESTIONS WITH 100% VERIFIED
ANSWERS



\.Q. 1001: Which of the following is true?



A.



Component testing should be black box, system testing should be white box.

B. If u find a lot of bugs in testing, you should not be very confident about the quality of
software

C. The fewer bugs you find, the better your testing was

D. The more tests you run, the more bugs you will find. - ANSWERS✔-B



\.Q. 1002: If the pseudo code below were a programming language ,how many tests are
required to achieve 100% statement coverage?



1. If x=3 then

2. Display_messageX;

3. If y=2 then

4. Display_messageY;

5. Else

6. Display_messageZ;

7. Else

,8. Display_messageZ;



A. 1

B. 2

C. 3

D. 4 - ANSWERS✔-C



\.Q. 1003: In which order should tests be run?



A. The most important tests first

B. The most difficult tests first(to allow maximum time for fixing)

C. The easiest tests first (to give initial confidence)

D. The order they are thought of - ANSWERS✔-A



\.Q. 1004: A program validates a numeric field as follows:



Values less than 10 are rejected, values between 10 and 21 are accepted, values greater than or
equal to 22 are rejected. Which of the following covers the MOST boundary values?



A. 9,10,11,22

B. 9,10,21,22

C. 10,11,21,22

D. 10,11,20,21 - ANSWERS✔-B



\.Q. 1005: What is the important criterion in deciding what testing technique to use?

,A. How well you know a particular technique

B. The objective of the test

C. How appropriate the technique is for testing the application

D. Whether there is a tool to support the technique - ANSWERS✔-B



\.Q. 1006: Which is not true-The black box tester



A. Should be able to understand a functional specification or requirements document

B. Should be able to understand the source code.

C. Is highly motivated to find faults

D. Is creative to find the system�s weaknesses - ANSWERS✔-B



\.Q. 1007: A number of critical bugs are fixed in software. All the bugs are in one module,
related to reports. The test manager decides to do regression testing only on the reports
module.



A. The test manager should do only automated regression testing.

B. The test manager is justified in her decision because no bug has been fixed in other modules

C. The test manager should only do confirmation testing. There is no need to do regression
testing

D. Regression testing should be done on other modules as well because fixing one module may
affect other modules - ANSWERS✔-D



\.Q. 1008: Which of the following statements contains a valid goal for a functional test set?



A. A goal is that no more failures will result from the remaining defects

, B. A goal is to find as many failures as possible so that the cause of the failures can be identified
and fixed

C. A goal is to eliminate as much as possible the causes of defects

D. A goal is to fulfil all requirements for testing that are defined in the project plan. -
ANSWERS✔-B



\.Q. 1009: Which set of metrics can be used for monitoring of the test execution?



A. Number of detected defects, testing cost;

B. Number of residual defects in the test object.

C. Percentage of completed tasks in the preparation of test environment; test cases prepared

D. Number of test cases run / not run; test cases passed / failed - ANSWERS✔-D



\.Q. 1010: Which of the following can be root cause of a bug in a software product?



(I) The project had incomplete procedures for configuration management.

(II) The time schedule to develop a certain component was cut.

(III) the specification was unclear

(IV) Use of the code standard was not followed up

(V) The testers were not certified



A. (I) and (II) are correct

B. (I) through (IV) are correct

C. (III) through (V) are correct

D. (I), (II) and (IV) are correct - ANSWERS✔-B

Document information

Uploaded on
March 3, 2026
Number of pages
484
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$17.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
IszackBd
5.0
(3)
Sold
61
Followers
4
Items
6421
Last sold
17 hours ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions