100% satisfaction guarantee Immediately available after payment Read online or as PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

Construction Management Final Questions With Complete Solutions

Rating
-
Sold
-
Pages
13
Grade
A+
Uploaded on
01-03-2026
Written in
2025/2026

Construction Management Final Questions With Complete Solutions

Institution
Construction Management
Course
Construction Management

Content preview

Construction Management Final Questions With Complete
Solutions

A big advantage of the unit price contract is that the owner
knows the final cost of the job right at the outset with certainty.
Correct Answers False

A city electrical inspector makes the following statement after
discovering that the new condominium building # 13 of 25
buildings have been dry walled without an electrical inspection.
The inspector says to you, the superintendent, "Gee! It will be
pretty expensive to remove all of the drywall. I'd bet it will cost
you at least $5, 000. I'd like to have that kind of money myself!"
(You suspect that the inspector is asking for a bribe). Correct
Answers Contact the building department supervisor and ask to
have hidden areas removed.

A city ordinance stated that no erection or repair work on
buildings was to commence prior to obtaining a building permit.
A contract in that city stated work should be carried out "without
obtaining any building permit". The contractor defaulted on the
contract. The owner sued the contractor.
Q: Should the contractor pay damages? Correct Answers False

A contract has to be enforced regardless of whether the subject
of the contract is legal or not. Correct Answers False

A contract is a promise for the breach of which the law gives a
remedy and the performance of which the law recognizes as a
duty. Correct Answers True

, A contract is entered into whereby the Design and Scope are
partially undefined, the Owner holds a contract with the A/E, the
Owner holds the contracts with each trade and the Owner also
holds a contract with a management service company to perform
the trade coordination, cost control and scheduling services.
What is this project delivery called? Correct Answers
Construction Management

A contract is not binding if a party to the contract can prove that
he was drunk at the time the contract was signed. Correct
Answers True

A contractor is selected and signs a construction contract with
the owner during Pre-Construction stage. Correct Answers
False

A television assembly plant has a variable production output
ranging from 200 sets to 350 sets a day. The building for both
manufacturing and warehousing has an area of 80,000 square
feet. It employs about 250 people. Most of the components that
go into the assembly are also produced in the plant.
An example for fixed cost in this plant is ______________.
Correct Answers Equipment Cost

According to the Constructor's Code of Ethics, The Constructor
shall ensure that when providing a service or advice such advice
shall be to treat all parties in a fair and unbiased way. What is
the best way for a Constructor to achieve this? Correct Answers
Don't engage in any practice which creates an unfair advantage
for one party.

Written for

Institution
Construction Management
Course
Construction Management

Document information

Uploaded on
March 1, 2026
Number of pages
13
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Classroom NURSING
View profile
Follow You need to be logged in order to follow users or courses
Sold
4826
Member since
3 year
Number of followers
3228
Documents
55004
Last sold
1 day ago
NURSING

Assignments, Case Studies, Research, Essay writing service, Questions and Answers, Discussions etc. for students who want to see results twice as fast. I have done papers of various topics and complexities. I am punctual and always submit work on-deadline. I write engaging and informative content on all subjects. Send me your research papers, case studies, psychology papers, etc, and I’ll do them to the best of my abilities. Writing is my passion when it comes to academic work. I’ve got a good sense of structure and enjoy finding interesting ways to deliver information in any given paper. I love impressing clients with my work, and I am very punctual about deadlines. Send me your assignment and I’ll take it to the next level. I strive for my content to be of the highest quality. Your wishes come first— send me your requirements and I’ll make a piece of work with fresh ideas, consistent structure, and following the academic formatting rules. For every student you refer to me with an order that is completed and paid transparently, I will do one assignment for you, free of charge!!!!!!!!!!!!

Read more Read less
4.0

1176 reviews

5
622
4
214
3
192
2
39
1
109

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions