Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

Automation Technology SACA Silver Certification Test Questions All Solved.

Rating
-
Sold
-
Pages
6
Grade
A+
Uploaded on
01-03-2026
Written in
2025/2026

What is the first step of the 5S process? - Answer Sort Which of these activities is considered a non-value-added activity in a lean manufacturing environment? - Answer Moving a product from one station to another What technology element differentiates Industry 4.0 from Industry 3.0? - Answer Smart Sensor connected to networks What type of computer is designed to wire directly to input and output devices to control different types of industrial machines and processes? - Answer PLC (Programmable Logic Controller) What type of manufacturing process do 3D printers perform? - Answer Additive Which of these is NOT a primary goal of a lean manufacturing system? - Answer Greater production volume What is the normal mode for most PLC-controller industrial machines? - Answer Automatic Which of these is NOT one of the eight types of waste in Lean Manufacturing? - Answer Underproduction If a machine has a problem that causes it to stop, what would you expect to see on the machine's HMI panel? - Answer Error Messages Which of these devices includes a display screen and software to display graphical representations of pushbuttons and selector switches, which an operator can press to send input signals to a controller? - Answer HMI (Human-Machine Interface) After fixing a problem, what screen should be checked to verify that there are no problems before starting the machine? - Answer Startup Menu Which type of machine stop function requires a power-up procedure to restart the machine's operation? - Answer Emergency stop

Show more Read less
Institution
SACA 201 Silver
Course
SACA 201 Silver

Content preview

Automation Technology SACA Silver
Certification Test Questions All
Solved.
What is the first step of the 5S process? - Answer Sort



Which of these activities is considered a non-value-added activity in a lean manufacturing
environment? - Answer Moving a product from one station to another



What technology element differentiates Industry 4.0 from Industry 3.0? - Answer Smart
Sensor connected to networks



What type of computer is designed to wire directly to input and output devices to control
different types of industrial machines and processes? - Answer PLC (Programmable Logic
Controller)



What type of manufacturing process do 3D printers perform? - Answer Additive



Which of these is NOT a primary goal of a lean manufacturing system? - Answer Greater
production volume



What is the normal mode for most PLC-controller industrial machines? - Answer Automatic



Which of these is NOT one of the eight types of waste in Lean Manufacturing? - Answer
Underproduction



If a machine has a problem that causes it to stop, what would you expect to see on the
machine's HMI panel? - Answer Error Messages



Which of these devices includes a display screen and software to display graphical
representations of pushbuttons and selector switches, which an operator can press to send
input signals to a controller? - Answer HMI (Human-Machine Interface)



After fixing a problem, what screen should be checked to verify that there are no problems
before starting the machine? - Answer Startup Menu



Which type of machine stop function requires a power-up procedure to restart the machine's
operation? - Answer Emergency stop

, What should you do if you find that a machine's safety guard has been bypassed? - Answer
Lock out the machine and call the supervisor.



What indicator on an operator panel will likely be ON while a machine is performing its
automation sequence? - Answer In Cycle



What does the green color on this DOT label signify? - Answer Non-flammable



In what position should a pneumatic lockout valve be placed to perform a lockout? - Answer
Closed



In addition to Medical and Environmental what is another category of emergency in a company?
- Answer Hostile Threats



If a worker gets a chemical in an eye, what is the FIRST action they should take? - Answer Go
to the eyewash station



What air pressure should be used when compressed air is used to clean or blow parts? - Answer
Below 30 PSI



What feature should safety glasses have when used with a welding mask? - Answer Side
Shields



What type of gloves should be used when they are required to operate a process with moving
machine parts? - Answer Tight Fitting



What is the proper operation sequence of the fire extinguisher? - Answer pull, aim, squeeze,
sweep (PASS)



What is the hazardous material classification system that uses pictograms to identify the danger
of a material? - Answer GHS



What is the first step in an electrical lockout/tagout procedure? - Answer Shut down all
energy sources.



An employee should be retrained if they do not perform which of these tasks after a lockout
tagout is removed? - Answer Test the machine.

Written for

Institution
SACA 201 Silver
Course
SACA 201 Silver

Document information

Uploaded on
March 1, 2026
Number of pages
6
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Thumbnail
Package deal
SACA 201 Silver Exam Bundle Pack With Correct Solutions.
-
5 2026
$ 63.95 More info

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
COCOSOLUTIONS Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
172
Member since
2 year
Number of followers
16
Documents
7551
Last sold
2 days ago
COCO SOLUTIONS ACADEMIC STORE

COCO SOLUTIONS ACADEMIC STORE YOU GET ALL KIND OF EXAMS,STUDYGUIDES,ASSIGNMENTS,FLASHCARDS,NOTES,SUMMARIES,REVIEWS .ALL YOUR ACADEMIC SOLUTIONS WE GOT YOU COVERED.WE ARE YOUR STUDY SOLUTION ,MAKING YOUR EDUCATION JOURNEY SMOOTH AND EFFICIENT FOR MORE ENQUIRIES FEEL FREE TO REACH US OUT.

4.2

28 reviews

5
15
4
6
3
5
2
1
1
1

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions